Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.7 LAccepted-Finance | ₹11.7 L | 1 | Accepted-Finance 1 |
| 2 | 2₹11.7 L+₹4,450.55 (0.38%)Accepted-Finance | ₹11.7 L+₹4,450.55 (0.38%) | 2 | Accepted-Finance 2 |
| 3 | 3₹12.7 L+₹1.0 L (8.96%)Accepted-Finance | ₹12.7 L+₹1.0 L (8.96%) | 3 | Accepted-Finance 3 |
| 4 | 4₹13.5 L+₹1.8 L (15.6%)Accepted-Finance | ₹13.5 L+₹1.8 L (15.6%) | 4 | Accepted-Finance 4 |
| 5 | 5₹14.8 L+₹3.2 L (27.3%)Accepted-Finance | ₹14.8 L+₹3.2 L (27.3%) | 5 | Accepted-Finance 5 |
Tender Value
₹21.2 L
EMD Value
₹63,570
Closing Date
27 Apr 2026, 4:00 pmClosed
Executive Engineer Jal Shakti PHE Div. Bijbehara
Executive Engineer Jal Shakti PHE Div. Bijbehara
Extension of RWM ,Installation of Fire Hydrants ,Commissiong /connecting of SR , upgradation of Existing pipe network by way of HDPE /GI Pipes at Sheshnag
2026_PHE_308275_8
09/PHE/BIJ OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
sheehnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Div. Bijbehara
₹63,570
Yes
30 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
21 Apr 2026 - 27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | - | - | - | - |
| 2 | All Kinds of Soil | - | Cum | - | - |
| 3 | Ordinary Rock | - | Cum | - | - |
| 4 | Laying and fitting of HDPE pipes of different dia complete excluding cost of pipes, fittings and Earth work. | - | - | - | - |
| 5 | 110 mm dia HDPE pipes | - | Mtr | - | - |
| 6 | Installation, testing, commissioning of Fire Hydrant with dual hose to be installed on existing Pipe along with required Tail Pieces connecting pipes upto 3 mtr as per requirement made of G.I/M.S Pipes, Flanges, Bends, Nipple, Valves, Union , Elbow & Welding including all carriages etc complete Job. The job includes complete testing of the installation after proper welding & jointing | - | No. | - | - |
| 7 | For connecting and commssioning of SRs AS PER ACTUAL | - | No. | - | - |
| 8 | Laying and fitting of GI Pipes complete job excluding the cost of pipes, | - | - | - | - |
| 9 | 50mm Dia GI pipes | - | Mtr | - | - |
| 10 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_999208.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_999208.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .