Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAccepted-AOC FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.0 L+₹1.8 L (5.16%)Rejected-Finance | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹44.2 L+₹9.0 L (25.6%)Rejected-Finance ROOM NO D 290 PART III GALI NO 8 SHREE GANESH MURTHI NAGAR CUFFE PARADE ROAD COLABA MUMBAI 400005 | MUMBAI | MAHARASHTRA | 400005 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹48.2 L+₹13.0 L (37.1%)Rejected-Finance ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹49.1 L+₹13.9 L (39.5%)Rejected-Finance 15 281 CHHILI INT ROAD GHATIYA AZAM KHAN AGRA UTTAR PRADESH 282003 | AGRA | UTTAR PRADESH | 282003 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
20 Jul 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIRS TO WATER PROOFING TREATMENT LEAKAGE SEEPAGE SUNKEN CI PVC PIPES AT OLD RS COLABA UNDER AGE B R II (NW) NAVY NAGAR COLABA MUMBAI
2022_MES_528974_1
8282/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.4 L
Yes
18 Aug 2022
6 Jun 2022
22 Jul 2022
6 Jun 2022
20 Jul 2022
27 Jun 2022
6 Jun 2022 - 25 Jun 2022
Amount
Removal of existing water proofing treatment of the roof,and preparing the surface by cleaning the concrete surface with wirebrush and a high pressure water jet and ensure that it is free of dust,oil,grease,loose particles vegetation root etc including demolition of PCC padding /brick bats of any description and in any position including shifting or removing of demolished material from roof slab to ground/land including all arrangement complete all as specified and directed by Engineer-in-Charge.
Material and Labour for Plain cement concrete 1:2:4 type B-0 (using 12.5mm graded stone aggregate) mixed with and including liquid waterproofing compound and 1:30 slope to be maintained complete all as specified and directed by Engineer-in-Charge.
Material and Labour for 10mm thick rendering in CM 1:3 mixed with and including liquid waterproofing compound on fair faces of brick or concrete surfaces complete all as specified and directed by Engineer-in-Charge.
Material and Labour for protecting the roof including parapet wall with water proofing coating complete as spd below (a) Cleaning and removal of loose concrete and filling cracks with polymer modified mortar using smart care RP or Epoxy mortar (b)supplying and applying high performance polyurea polyurethane elastomeric waterproofing coating cold applied by spray/brush,smart care ultron liquid membrane with an elongation of 600% and tensile strength of 12.6 N/mm2 as per ASTM D 2370,crack bridging ability of 3 mm as per ASTM C 1305,shore A Hardness of min 75 as per ASTM D 2240.The system includes final base preparation epoxy primer application and applying smart care ultron or approved equivalent in two coats at 1.2 kg/sqm each coat complete all as per manufacturer specification &instructions including Water proofing treatment to rain water spouts of entire roof terrace by opening of all the existing Failed loose pipes and its Joint (In Old Structure), replacing the same by an appropriate dia pipe( not less then110mm) followed by Application of two coats polymer polyurethane elastomeric water proofing coating to ensure leakage free joint.(work includes filling of mortar and making good the same) Make:Asian Paints /Berger paints/Dulux paints/STP/Dr.fixit/Smart care Note:1)Work to be carried out from authorised applicator only 2)Colour of each coat shall be as directed by GE
Note :- For item No 1.00 to 4.00 Work to be carried out above 14th floor roof slab.
Taking down cement plaster of any discription including racking out joints hacking for key scrubbing down with water in patches n.exc. 4 Sqm each complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for rendering 15mm thick in CM 1:6 on other than fair faces of bricks work or concrete finished even and smooth without using extra cement complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for 05 mm thick plastering in CM 1:3 on concrete surface on ceiling finished even and smooth complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement and using welded mesh where required all as specified including scaffolding, Safety net etc complete all as specified and directed by Engineer-in-Charge. (Note :- WPC and welded mesh shall be measured and paid separately)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved ISI make complete all as specified and directed by Engineer-in-Charge.
Supply only Welded steel wire fabric not exc 4 kg per sqm for plastering in concrete surfaces complete all as specified and directed by Engineer-in-Charge.
Material and Labour preparing newly plastered surfaces of walls and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer & bio wash on wall complete all as specified and directed by Engineer-in-Charge..
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
All as per item 12.00 above but on ceiling.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for Preparation of old painted surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint over a coat of antirush paint/red oxide primer, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Demolition of cement concrete (unrinforced) of any description and in any position not otherwise specifically provided for including chaina mozaic, WC etc. complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Treatment of sunken floor slab compraises of the following specifications and complete all as specified and directed by Engineer-in-Charge.:-
Material and Labour for cleaning the sunken/lowered portion of RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chisel out any mortar sticking to the surface and brooming completely. 40 mm thick avg PCC 1:2:4 type B-0 using 12.5mm graded aggregate mixed with integral water proofing compound @ 3% by wt of cement consumed.as in padding conc to achieve proper slope including cutting holes in bricks or RCC wall for spout (Cost cutting holes and pipes shall be measured and paid separately) complete all as specified and directed by Engineer-in-Charge.
Rendering of uneven surfaces with 6mm thick CM 1:4 mixed with integral water proofing compound @ 3% by wt of cement consumed. Fill it with water and check dampness and seepage. Where dampness/seepage is noticed, nozzles shall be fixed and grouting carried out.( WPC shall be measured & paid separately) complete all as specified and directed by Engineer-in-Charge.
All junctions points of side wall where CI/GI pipes are passing through shall be sealed with epoxy puty.
After drying putty, wash the slab and sides of sunken portion with water and make it clear and clean.
Material and Labour for applying two coats of polymer modified cementious water proof coating as per manufacturs instruction to bottom and vertical sides up to finished floor level+100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion complete all as specified and directed by Engineer-in-Charge. (This item shall be peasured and paid separately)
Plaster the bottom and sides up to bottom of the skirting with minimum 20mm thick CM 1:4 mixed with integral water proofing compound 3% by wt of cement consumed as per manufacturer's specification including rounding of corners and junctions sloping towards spout.( WPC shall be measured & paid separately)
All pipes laid in sunken portion shall be covered with 50mm thick PCC 1:3:6 all round after painting with anticorrosive paint (Black Japan shall be paid separetely) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Cutting holes in bricks or RCC walls exce half brick built in cement mortar including making goor after inserting and setting spouts all as specified.
Supply and fixing for GI pipe 50mm dia medium grade laid on sunken floor complete all as specified and direced by EIC.
Material and Labour for applying two coats of polymer modified cementious water proof coating as per manufacturs instruction to bottom and vertical sides up to finished floor level+100mm height. The thickness of two layer shall be 1mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surface of the sunken portion all as specified and directed.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
All pipes laid in sunken portion shall be covered with 50mm thick PCC 1:3:6 all round after painting with anticorrosive paint (Black Japan) shall be paid separately complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for filling with PCC 1:5:10 type E2 (1 Cement : 5 coarse sand : 10 graded aggregate 40 mm nominal size) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Dismantling floor, hearth, or wall tiling incl cement mortar for bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour non-skid coloured Ceramic tiles 7mm thick (square/rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in epoxy mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for rendering 10mm thick in cement mortar 1:4 on backing coat of wall tiles etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing in repairs for vitreous china squatting pan Orissa pattern of size 580 x 440 mm white with back inlet and integral footrest and anti syphonnage pipe including 'P' or 'S' trap and provn of lime concrete complete all as specified supplied and fixed in repairs complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing in repair Vitreous China Ware Wash hand basin white, flat back, size 550 x 400 mm size (flat back or angle back type) including cutting for and pinning ends of brackets or erecting stand complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing in repair 32mm dia waste coupling of PTMT (half or full threaded) minimum weight 32mm- 45gms. ( complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing pillar tap 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
(d) 13th floor to up to and including 14th floor.
Supply and Fixing PVC connection 15mm size with PTMT nuts of length 450mm complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing Unplasticised PVC pipes of pressure rating 10 kgf/cm2 of 50 mm bore fixed complete to walls, ceiling or in floors including bend and sockets etc; any type of pipe complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing in repair PVC valveless, syphonic action type, flushing cristern, 10 ltr capacity low level, white, with inlet, ball valve, float and handle including brackets complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing Flush pipe of polyethylene of low or high density for low level cistern complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for CI Nahani trap dia of outlet 75mm fixed in repairs including jointing to waste pipe in runlead fixed in cement concrete type B 1 (1:2:4) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing PTMT grating doom over Nahani trap and floor trap of 100mm Dia (Minimum weight 25 gms) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down CI soil/waste/vent/rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing CI soil/waste/vent pipe in any length with ears 100mm bore (sand cast) in any length with cement joints fixed to walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
All as per item 38.00 above but except pipe.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing CI soil/waste/vent pipe in any length with ears 75mm bore (sand cast) in any length with cement joints fixed to walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
All as per item 40.00 above but except pipe.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing CI bends (any radius) for soil/waste pipes 100mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing CI bends (any radius) for soil/waste pipes 75mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing CI branch piececs single (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 100mm bore pipe (Y or T) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing CI branch piececs single (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 75mm bore pipe (Y or T) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing 100mm cast iron sanitary connection socket to fit WC out-let complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down PVC rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing PVC (SWR) pipes 160mm bore single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed by Engineer-in-Charge..
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing PVC (SWR) bends 160mm bore any radius complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking up or down GI tubing and connections 15 mm bore including cleaning for refixing or removal to store complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Refixing old GI tubing and connection15 mm bore in new or old position in ( Walls, ceiling, floors etc) with old accesories complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing GI Tubing 15 mm bore medium grade with all fitting and fixed complete to wall and ceiling or laid in floors complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing Bib tap 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and Fixing Stop valves 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for smart care PU injection grout with nozzle PU injection (IK) is a hydrophobic grout based on polyurethane up on contact with water it reacts to form a closed cell rubber like foam while expanding its volume up to 27 times.the cured material is of a constant volume. since water is not a component of the foam structure the cured material is essentially not affected by water or dryness. the reacted material does not shrink or swell. Depending up on the pressure of injection it reacts to form a very dense material or foam Make complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour preparation of old decorated surfaces of wall including washing and applying two coat of Acrylic emulsion paint exterior grade (100% Acrylic) over one coat of primer incl necessary scaffolding, Safety net etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for water proofing treatment of external walls by applying two coats of elastomeric external acrylic water proofing coating material (STP Shalicryl 215)after cleaning the surface thoroughly and sealing all cracks with acrylic sealing compound as per the manufacturer’s specifications and directions of Consultant/Architect. Make : Build core STP chemicals or equivalent. complete all as specified and directed by Engineer-in-Charge. (Note :- work will be carred out with scafolding all over bldg upto 14th floor of wall. Rate of scaffolding & acrylic based exterion paint is included in this item).
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Cleaning & drying surface of floor /dado of bathroom, WC & kitchen etc by mechanical means i.e. blower etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Opening joints of floor tiles, junction of floor & dado tiles, 300mm height from bottom layer of dado tiles with electrical grinder, electrical blower etc complete in WC, bathroom & kitchen complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for inserting chemical mixture of polymer 960 & o.p.c. through these opened joints manually by trowel to seal all cracks honey combing of slab/beams and walls etc complete upto 300mm height from bottom layer of dado in WC, bathroom & kitchen including NT etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour anodised aluminium sheeting 22 gauge thick fixed in repairs as in crumple section complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for taking out/removing vegitation growth or shrubs and injecting chemical GLYPHOSPHATE 41% SL 20 ML or till refusal by making cut/injection in the stem of plants 30 mm c/c and spraying with solution (25 ml GLYPHOSPHATE 41% diluted with one lit of water) and removing the plants/vegitation growth completely dead, including necessary scaffolding, julas etc complete as per manufacturer of chemical Biostadtlndia Ltd or equivalent approved by GE.
Chipping ,removing carefully concrete work by low impact hammer ,breaker without damaging the structure in parapet walls and other concrete surfaces & cleaning and disposal of debris out side the premises etc. complete all as specified and directed by Engineer-in-Charge. Hard concrete shopuld not be removed by force complete all as specified and directed by Engineer-in-Charge.
Material and Labour for applying the rust remover alkaline in natrue having specific gravity of 1.1 kg/ltr to the existing/additional rebars including wire brushing manually or by mechanical tools, after cleaning the disturbed surface etc. complete by draining water. Rust remover shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite). Note :- Measurement on the basis of area of concrete exposed complete all as specified and directed by Engineer-in-Charge.
Material and Labour for applying two coats of anti-rust protective coating in the form of Acrylic Polymer with a minimum solid content to 40% solids mixed with cement in 1:1.5 proportion (1 part polymer and 1.5 parts cement) on rebars after cleaning of rust scales as per manufacturer's instruction. Anti-rust protective shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/ Krisha conchem/Dr Fixit Pidilite). Note :- Measurement on the basis of area of concrete exposed complete all as specified and directed by Engineer-in-Charge.
M/L for TMT bars 10mm dia. and over, Cut to length, bent to shape required including cranking, spirally and binding with MS wire (annealed) not less than 0.9mm dia.by placing in position new reinforcement bars including tack welding to existing reinforcement bars complete all as specified and directed by Engineer-in-Charge.
Providing bonding coat of SBR polymer over the exposed steel/welded mesh/concrete in ratio 1:1 to 1:1.5 of polymer and cement complete as directed by the consultant. SBR polymer to be procured from one of the manufacturer's given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite) complete all as specified and directed by Engineer-in-Charge.
Material and Labour for repairing the damaged concrete portion by SBR Polymer with a minimum solid content to 40% cement mortar in proportion 1:5:15 i.e. (1 part SBR polymer : 5 parts OPC cement and and 15 parts of graded quartz aggregate (sand) upto 25mm thickness as directed by the manufacturer's instruction including necessary curing etc. complete all as specified & as directed.SBR polymer shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite). complete all as specified and directed by Engineer-in-Charge.
Removing demolished material outside MD land all as specified and directed. (Note:- For item No 1 to 68 Work to be carried out at G+14 bldg including top roof,parapet and shaft walls with scaffolding & safety measures in repairs and in patches).
SATYANARAYAN CONSTRUCTION
DHARICHHAN ENTERPRISE
satguruenterprises
Garima Construction Co
SHREE JAGDISH FURNITURE CO.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .