Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -31.99% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.1 L+₹1.3 L (21.7%)Admitted-Finance | -17.26% | ₹7.1 L+₹1.3 L (21.7%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹8.5 L
EMD Value
₹17,074
Closing Date
20 May 2026, 3:00 pmClosed
EE,NMD-1,DDA
EE,NMD-1,DDA
Repair of Flat No 10 in D2 block, MIG houses at Saraikhalil.
2026_DDA_908523_1
07/EE/NMD-I/DDA/2025-26
Open Tender
Civil Works
Works
60 days
Pitampura
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹17,074
25 May 2026
13 May 2026
21 May 2026
13 May 2026
20 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | 54.65 | - |
| 2 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | - | sqm | 347.05 | - |
| 3 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | - | sqm | 156.05 | - |
| 4 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and
reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge
25 mm average thickness | - | sqm | 126.75 | - |
| 5 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. Bars upto 12 mm diameter | 1 | metre | 8.25 | ₹8.24 |
| 6 | Providing, mixing and applying bonding coat of approved adhesive onchipped portion of RCC as per specifications and direction of EngineerIn-charge complete in all respect.
SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | - | sqm | 141.2 | - |
| 7 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75 mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). 25 mm average thickness in 2 layers. | - | sqm | 587.35 | - |
| 8 | 15 mm cement plaster on the rough side of single or half brick wall of mix :
1:4 (1 cement: 4 fine sand) | - | sqm | 399.45 | - |
| 9 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm.
(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289
kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.
(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately.
For the purpose of measurement the entire treated surface will be measured. | 1 | sqm | 688.9 | ₹688.21 |
| 10 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | - | sqm | 266.45 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_954863.xls
BOQ • 0.39 MB
NIT07.pdf
Tender Documents • 2.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .