Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | -0.21% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 L+₹4,563.84 (1.41%)Admitted-Finance | +1.20% | ₹3.3 L+₹4,563.84 (1.41%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 L+₹10,390.03 (3.22%)Admitted-Finance | +3.00% | ₹3.3 L+₹10,390.03 (3.22%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
29 Jun 2026, 2:00 pmClosed
EE
S/O
Laying of 300 mm dia Sewar line 65 mtr in Ward No.07 Nirala Nagar Shiva Nagar Kacchi Basti Lane Bhawandin House to Community Center Kanpur.
2026_DOLBU_1161575_25
JalKal / 1108 / EE Zone 5 /
Open Tender
Miscellaneous Works
Percentage
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹6,500
14 Sept 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of Tar Road cutting & its stracking old Material including Supply of lab, T&P etc all complete. (A) for Sewar Line (B) For M.H. | 66.4 | sqm | 205 | ₹13,612 |
| 2 | Cutting of kharanja and its stacking with old material including supply of labour 'T&P all complete. (A) for Sewar Line (B) For M.H. | 66.4 | sqm | 230 | ₹15,272 |
| 3 | Excavation of Trenches in Manually or Machanically in soil mixed with moorum/shingle /kankar for pipe line with lift upto 1.5 m.. (A) for Sewar Line (B) For M.H. | 95.56 | sqm | 279.15 | ₹26,675.57 |
| 4 | Concrete work 12:6:1 with all complete. (A) for Sewar Line (B) For M.H. | 8.66 | sqm | 3,640 | ₹31,522.4 |
| 5 | Making Barricating Arrangment with sal, Ballies, lab, t7p etc all comp. | 152 | sqm | 118 | ₹17,936 |
| 6 | 1st Class Brick Work With 1:4 Cement sand motor including Supply of lab, Mat, T&P etc all comp. | 9.18 | sqm | 5,150 | ₹47,277 |
| 7 | 15mm thick plaster with 1:4 cement sand mortor including supply of lab. ,Mat, etc all comp. | 18 | sqm | 183.56 | ₹3,304.08 |
| 8 | Providing Beir to Retain Sewage water etc all comp. | 10 | cum | 450 | ₹4,500 |
| 9 | RCC work with Cement, C Sand & Stone ballast in slab etc all comp. | 1.42 | cum | 7,300 | ₹10,366 |
| 10 | Mild steel or iron work in plain work such as reinforced concrete of rein forcded B/W, rough to required shape necessry including linding for proper completion of the work | 1.11 | cum | 5,500 | ₹6,105 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
9.pdf
Tender Documents • 1.03 MB
BOQ_2179359.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .