Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC C 185 2ND FLOOR MAYAPURI PHASE 2 NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹5.5 Cr+₹12 L (2.21%)Rejected-Finance | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹6.0 Cr+₹52.8 L (9.73%)Rejected-Finance 430 431 12TH CROSS 4TH PHASE PEENYA INDUSTRIAL AREA BENGALURU BANGALORE BENGALURU KARNATAKA 560058 INDIA UDYAM KR 03 0051280 | BENGALURU URBAN | KARNATAKA | 560058 | L3 | Rejected-Finance NOT L1 | |
| 4 | L4₹6.0 Cr+₹55.2 L (10.2%)Rejected-Finance | L4 | Rejected-Finance NOT L1 | |
| 5 | L5₹7.1 Cr+₹1.7 Cr (31.4%)Rejected-Finance | L5 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹7.3 L
Closing Date
4 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM PJ CGD
IOCL PLHO NOIDA
LAYING OF 12 INCH NB PIPELINE ACROSS SONE RIVER CROSSING OF CROSS COUNTRY PIPELINE FROM PITWANS TO GIDDHA ALONG PHDPL AUG ROW BY HORIZONTAL DIRECTIONAL DRILLING HDD TECHNIQUE AND ASSOCIATED WORKS IN STATE OF BIHAR
2020_PLHO_116123_1
PLCGD/WORKS/20/16
Open Tender
Mechanical Works
Tender cum Auction
180 days
Aara
Please refer Tender documents.
4 documents required · 4 mandatory
₹7.3 L
Yes
NOIDA
2 Sept 2020
1 May 2020
5 Jun 2020
1 May 2020
4 Jun 2020
21 May 2020
11 May 2020
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Sone River Crossing for connecting Naubatpur to Giddha/ Arrah | - | - | - | - |
| 3 | WORKS IN THE STATE OF BIHAR | - | - | - | - |
| 4 | HDD of Carrier pipe without OFC Conduit | - | - | - | - |
| 5 | Complete work for Installation of carrier pipeline of size 12" NB, 9.53 mm wall thick, API 5L Gr. X- 52 in all kind of soil including rocky strata across Sone river by HDD method limits as defined in drawing - detailed construction drawings shall be prepared by the contractor duly ( approved by Qwner/Consultant) including design, preparation of design basis report, detail execution philosophy, risk mitigation philosophy, detail engineering as per specification, approved procedures & applicable approved drawings. The job includes execution of the complete crossing and associated works, but not limit to following works in accordance with specifications, scope of work, drawings and as per all provisions of the contract document and instructions of the Owner/ Consultant.
Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the river bed & developing new bed profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner/ Consultant as per the provisions of contract document, preparation of detailed construction method statement and design analysis. | - | - | - | - |
| 6 | Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position.
Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc.
Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling.
Pre-construction surveys and collection of all necessary data.
String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the welds and re-testing etc
Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. | - | - | - | - |
| 7 | Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make.
Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc.
Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section
Carrying out post-installation coating survey as per approved procedure.
Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc.
Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner.
Preparation of as-built drawings and other records etc.
All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works.
NOTE:This line item is for all kind of soil including rocky strata. No extra payment will be made. | - | - | - | - |
| 8 | Specified NB (inch) x Wall thickness (mm) | - | - | - | - |
| 9 | 12" x 9.53 mm - API 5L X 52 | 1,850 | M | - | - |
| 10 | HDD INSTALLATION (OFC DUCT) | - | - | - | - |
| 11 | HDD INSTALLATION (OFC DUCT), Design, detailed engineering, installation of OFC conduit at specified minimum depth across River by Horizontal Directional Drilling (HDD) method. # Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilisation & de-mobilisation at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. # Interpretation of data of hydrological / geo-technical surveys furnished by the Owner (if any), carrying out fresh topographic survey of the river bed & developing new bed profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. # Complete site preparation including arranging of additional required land beyond ROW provided by Owner, setting up of fabrication yard, preparation of temporary arrangement for pipe stringing, launching etc. # Pre-construction surveys and collection of all necessary data related to site, underground utilities etc. # Fabrication of 89 mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC, # Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC. # Carrying out air cleaning of the complete pipeline string. # Installation of the OFC conduit below the river bed by single horizontal directional drilling operation to the correct profile as per the approved drawings in different soil stata at site including rock. # Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. # Transportation of surplus Owner-supplied OFC cable/ material to the Owner's designated storage location. # Preparation of As-built drawings and other records etc. # All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works.
NOTE: This item is optional and to be operated under specific instructions from Engineer-Incharge.
This line item is for all kind of soil including rocky strata and no extra payment will be made. | 1,850 | M | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 0.72 MB
Addendum1.pdf
Tender Document • 0.64 MB
Corrigendum1.pdf
Tender Document • 0.43 MB
FAQs-IOCL-Online-EMD.pdf
Tender Document • 0.55 MB
ClarificationtoBiddersQueries.rar
Tender Document • 27.08 MB
Technical.pdf
Tender Document • 12.27 MB
Commercial.pdf
Tender Document • 7.36 MB
Special_Instructions_to_the_Bidders_20200228.pdf
Tender Document • 1.26 MB
Tender-Acceptance-Format.pdf
Tender Document • 0.08 MB
BOQ_126253.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .