Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.5 LAccepted-AOC | 1 | Accepted-AOC Work allotted | |
| 2 | 2₹31.6 L+₹3.1 L (10.8%)Rejected-Finance C 57A SURYA VIHAR GURUGRAM 122 001 HR | GURUGRAM | HARYANA | 122001 | 2 | Rejected-Finance Not lowest | |
| 3 | 3₹32.4 L+₹3.9 L (13.6%)Rejected-Finance VPO BIGHANA TEHSIL ALEWA DISTT JIND | JIND | HARYANA | 126101 | 3 | Rejected-Finance Not lowest | |
| 4 | 4₹35.0 L+₹6.4 L (22.6%)Rejected-Finance | 4 | Rejected-Finance Not lowest | |
| 5 | 5₹35.2 L+₹6.7 L (23.6%)Rejected-Finance | 5 | Rejected-Finance Not lowest |
Tender Value
₹31.6 L
EMD Value
₹64,000
Closing Date
19 Mar 2020, 5:00 pmClosed
Executive Engineer Provn Divin PWD BandR Jind
Executive Engineer Provn Divin PWD BandR Jind
Special repair of Pillukhera to Dharouli Bhartana Lalit Khera upto Gohana Jind road from RD 0000 to 0130 and RD 0350 to 0750 in Jind Distt Road ID 6691
2020_HRY_120744_1
PWD/Jind/Pillukhera to Dharouli Bhartana Lalit Khe
Open Tender
Civil Works
Works
120 days
Jind
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
Executive Engineer Provn Divin PWD BandR Jind
₹64,000
Yes
Executive Engineer Provn Divin PWD BandR Jind
2 Jun 2020
28 Feb 2020
20 Mar 2020
28 Feb 2020
19 Mar 2020
28 Feb 2020
3 Mar 2020
Amount
Earth work in excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal throw upto 2 meters, and an average vertical lift upto 0.5 meter including breaking of clods. Excavated earth may be reused on berms and disposed off surplus earth with all lead and lift including dressing complete in territorial as per direction of Engineer-in-charge will be incidental to work and nothing will be paid. (NS)
Earth work in excavation in foundations, trenches etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Dismantling of existing CC block pavement including transporting and stacking usable block along road side and after use balance CC block will be taken on RMR and handed over to the department after proper stacking as per direction of Engineer-In- Charge.(NS)
Dismantling Cement concrete plain 1:2:4 mix (HSR 8.6(d) and disposal of waste material with all lead and lift as desired by Engineer in Charge.
Cement concrete 1:6:12 with stone aggregate 40mm nominal size in foundation and plinth. (HSR 10.32)
Cement concrete 1:4:8 with stone aggregate 40 mm nominal size in foundation & plinth. (HSR 10.39)
Cement Concrete 1:1:1/2:3 with stone aggregate 20mm nominal size in first storey upto 4 meters above plinth level. (HSR 10.60)
Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring and shuttering, laid in position, complete in all respect. [HSR. 10.82 + 10.95 (a)].
First class brick work laid in cement sand mortar 1:4 in foundation plinth. (HSR 11.4)
Brick on edge or tile flooring laid in cement sand mortar1:4 on 75mm thick cement concrete 1:8:16 and 100mm sand filling and cement pointing 1:2 on top. (HSR 14.23)
Cement pointing 1:2 deep variety on brick and tile work.(HSR 15.60)
Providing and laying 150 mm thick granular sub base consisting of drainage cum filter layer confirming to Table 400.1 Grading –VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 300 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying 80mm thick ISI marked interlocking paver blocks confirming to IS: 15658:2006/IRC SP 63-2004 of all shapes and colours in design mix cement M-40 over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Relaying old CC blocks over 25 mm thick fine sand including transportation from road side where stacked excluding cost of CC blocks and complete in all respect as per specifications (NS).
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basements etc. Note:- Reinforcement shall be measured in length including heoks, if any separately for different in diameters as actually used in work, excluding overlaps, wastage, overlaps, Couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other method for binding and placing shall not be measured and cost of these items shall be deemade to be included in the rates for reinforcement.
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -5. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
SHAURYA CONSTRUCTION
Sh. Amit Sharma Contractor
M/s Ramdiya
Sh. Karan Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .