Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.8 L+₹3,985.11 (2.24%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.9 L+₹16,361.24 (9.19%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.0 L+₹20,098.83 (11.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.1 L+₹29,974.98 (16.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹12,375
Closing Date
13 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of Retaining wall near Graveyard near Filtration Plant at Mazham Phase2nd Block Narbal Budgam
2026_RDPR_317104_7
NIT_17_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
NARBAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹12,375
29 Aug 2026
21 Jul 2026
14 Aug 2026
21 Jul 2026
13 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Trench excavation by hydrualic means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 3.94 | Cum | 256.85 | ₹1,011.99 |
| 2 | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches excluding carriages of Stones. | 9.35 | Cum | 937 | ₹8,760.95 |
| 3 | P/L in position cement concrete of M10 Grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 28.41 | Cum | 5,733.6 | ₹1,62,891.58 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 128.25 | Sqm | 286.35 | ₹36,724.39 |
| 5 | P/A 12mm thick Plaster (1: 6) Cement Mortar Mix | 64.13 | Sqm | 266.2 | ₹17,071.41 |
| 6 | Carraige by M.T. of Coarse Aggregate from Source to Site. | 25.28 | Cum | 409.94 | ₹10,363.28 |
| 7 | Carraige by M.T. of Fine Aggregate from Source to Site. | 14.12 | Cum | 409.94 | ₹5,788.35 |
| 8 | Carraige by M.T. of Stone Soling/Plum | 9.35 | Cum | 405.31 | ₹3,789.65 |
| 9 | Add provision for cost of photographs, Citizen Information Board & other unforseen items (to be paid as per actual) | 1 | Job | 1,121 | ₹1,121 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1037534.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .