Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.8 L+₹1,547.39 (0.89%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹1.8 L+₹7,542.58 (4.33%)Accepted-Finance LOCATION HIMACHAL | SIRMAUR | HIMACHAL PRADESH | 171226 | L3 | Accepted-Finance L3 | |
| 4 | L4₹2.2 L+₹44,554.91 (25.6%)Accepted-Finance R O WARD NO 9 VPO AND TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | L4 | Accepted-Finance L4 |
Tender Value
₹1.3 L
EMD Value
₹2,680
Closing Date
19 May 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer Municipal Council Sujanpur
Executive Officer Municipal Council Sujanpur
C/O (Construction of) Decking sheet roof covering of Babali 4 Doli sujanpur
2021_UDDHP_47154_1
No 1-BMCS/Tende/ 2021-638 04-05-2021
Open Tender
Civil Works
Item Rate
60 days
Municipal Council Sujanpur Area
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Executive Officer Municipal Council Sujanpur
₹2,680
20 May 2021
5 May 2021
20 May 2021
5 May 2021
19 May 2021
5 May 2021
30 days
Amount
Demolition below G.L in all depth including stacking of serviceable materials and disposal of unserviceable materials within all lead and lifts including cutting the neceesary reinforcement and separating from R.C.C including carriage of material in all lead and lift.
Excavation in foundation trenches etc., in earth work, lift up to 1.50m stacking the excavated soil; not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disoposing of all surplus excavated earth as directed in pick/ jumper work including carriage of material in all lead and lift.
P/L CC 1:2:4 (1Cement:2Sand:4 Graded stone aggregate 20mm nominal size ) and curing complete including cost of centering and shuttering in : foundation including carriage of material in all lead and lift.
P & F M.S. round holding down or anchor bolts with nuts and washer plates complete including carriage of material in all lead and lift.
Steel Work Welded in built up sections trusses and framed work i/c cutting hoisting fixing in position and applying a priming coat of red lead paint in gratings framed gard bars,ladders railings brackets etc and similar work Steel trusses for shed including carriage of material in all lead and lift.
Providing and fixing 0.60mm thick prepainted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete with all accesoriees as required as per the direction of Engineer-in-charge.
Providing and fixing ridges or hips 60 cm overall with 0.60mm thick prepainted steel sheets in roofing with hot dipped metalic zinc coated sheets with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts & and bitumen washers complete with all accessories as required as per the direction of Engineer in Charges including carriage of material in all lead and lift.
Providing and fixing M.S. BP Sheet 1.66mm to 2mm thick in eaves board/facia/soffits/ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in-charge
Painting two costs (excluding priming coat) on new steel and other metal surfaces eith enamel paint brushin to give an even shade including cleaning the surface of all dirt,dust and other foregin matters including carriage of material upto all leads and lifts.
Maninder Singh Govt. Contractor
VIVEK GUPTA
varun gupta
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .