Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹105.1 CrAdmitted-Finance LAKHOTIYA CHOWK BIKANER BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | L1 | Admitted-Finance | |
| 2 | L2₹106.4 Cr+₹1.2 Cr (1.16%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹107.0 Cr+₹1.9 Cr (1.80%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹110.4 Cr+₹5.2 Cr (4.98%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹121.1 Cr+₹16.0 Cr (15.2%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Unipro Techno Infrastructure Pvt Ltd L8 | M/s DEVENDRA CONSTRUCTION CO. L1 | shri hari infra projects pvt ltd L2 | Bhoorathnom Construction Company Private Limited L5 | OFFSHORE INFRASTRUCTURES LTD L3 | GCKC Projects and Works Pvt. Ltd. L6 | VISHNU PRAKASH R PUNGLIA LTD L7 | Zuberi Engineering Construction Private Limited L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Package -I (PART -A. I: Pipe Line Work and ESRs) | |||||||||||
| 2.00Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended upto date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) . Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. Supply may be in coil or straight length in 6 M/12 M. HDPE PE-100 PN-6 | |||||||||||
| 3.00 | 90 mm dia | 33,661 | Rm | 289 ₹97,28,029 | 285 ₹95,93,385 | 224 ₹75,40,064 Lowest | 240 ₹80,78,640 | 311 ₹1,04,68,571 | 272 ₹91,55,792 | 247 ₹83,14,267 | 241 ₹81,12,301 |
| 4.00 | 110 mm dia | 28,855 | Rm | 439 ₹1,26,67,345 | 385 ₹1,11,09,175 | 320 ₹92,33,600 Lowest | 397 ₹1,14,55,435 | 426 ₹1,22,92,230 | 392 ₹1,13,11,160 | 372 ₹1,07,34,060 | 365 ₹1,05,32,075 |
| 5.00Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended upto date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by butt fusion/ electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work). Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. Supply of pipe shall be in straight length in 6/12 M. HDPE PE-100 PN-6 | |||||||||||
| 6.00 | 125 mm dia | 43,156 | Rm | 509 ₹2,19,66,404 | 456 ₹1,96,79,136 | 402 ₹1,73,48,712 Lowest | 460 ₹1,98,51,760 | 529 ₹2,28,29,524 | 510 ₹2,20,09,560 | 461 ₹1,98,94,916 | 470 ₹2,02,83,320 |
| 7.00 | 140 mm dia | 32,215 | Rm | 649 ₹2,09,07,535 | 571 ₹1,83,94,765 | 498 ₹1,60,43,070 Lowest | 575 ₹1,85,23,625 | 641 ₹2,06,49,815 | 627 ₹2,01,98,805 | 589 ₹1,89,74,635 | 580 ₹1,86,84,700 |
| 8.00 | 160 mm dia | 53,847 | Rm | 839 ₹4,51,77,633 | 749 ₹4,03,31,403 | 640 ₹3,44,62,080 Lowest | 720 ₹3,87,69,840 | 808 ₹4,35,08,376 | 809 ₹4,35,62,223 | 772 ₹4,15,69,884 | 670 ₹3,60,77,490 |
| 9.00 | 180 mm dia | 21,282 | Rm | 1,049 ₹2,23,24,818 | 940 ₹2,00,05,080 | 800 ₹1,70,25,600 Lowest | 950 ₹2,02,17,900 | 994 ₹2,11,54,308 | 1,018 ₹2,16,65,076 | 956 ₹2,03,45,592 | 910 ₹1,93,66,620 |
| 10.00 | 200 mm dia | 41,192 | Rm | 1,290 ₹5,31,37,680 | 1,166 ₹4,80,29,872 | 980 ₹4,03,68,160 Lowest | 1,175 ₹4,84,00,600 | 1,209 ₹4,98,01,128 | 1,247 ₹5,13,66,424 | 1,199 ₹4,93,89,208 | 1,140 ₹4,69,58,880 |
Tender Value
₹115.1 Cr
Closing Date
26 Apr 2021, 6:00 pmClosed
ACE PHED PROJECT REGION
ACE PHED PROJECT REGION JAIPUR
NIT NO-01/2020-21/ACE PHED PROJECT REGION/JAIPUR
2021_PHCJ_216419_1
NIT NO-01/2020-21/ACE PHED PROJECT REGION/JAIPUR
Open Tender
Civil Works - Water Works
Item Rate
730 days
Bisalpur-Tonk-Niwai Water Supply Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
EE PHED PROJECT DIV NIWAI/MD RISL
Exempted
In the Office of Chief Engineer, PHED, (SP) Jaipur
11 Jun 2021
11 Mar 2021
27 Apr 2021
11 Mar 2021
26 Apr 2021
31 Mar 2021
18 Mar 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Package -I (PART -A. I: Pipe Line Work and ESRs) | - | - | - | - |
| - | Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended upto date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) .
Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.
Supply may be in coil or straight length in 6 M/12 M. | - | - | - | - |
| - | HDPE PE-100 PN-6 | - | - | - | - |
| - | 90 mm dia | - | Rm | 1 | - |
| - | 110 mm dia | - | Rm | 1 | - |
| - | Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended upto date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by butt fusion/ electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work).
Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.
Supply of pipe shall be in straight length in 6/12 M. | - | - | - | - |
| - | HDPE PE-100 PN-6 | - | - | - | - |
| - | 125 mm dia | - | Rm | 1 | - |
| - | 140 mm dia | - | Rm | 1 | - |
| - | 160 mm dia | - | Rm | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.67 MB
TD-01.pdf
Tender Documents • 21.91 MB
BOQ_385530.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .