Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹92.2 L+₹1.1 L (1.23%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹93.5 L+₹2.4 L (2.61%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹94.8 L+₹3.8 L (4.13%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹97.7 L+₹6.6 L (7.24%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GULZAR AHMAD MALLA L1 | Javaid Ahmad Dev L2 | M/S BASHIR AHMAD DAR L3 | M/S HILAL AHMAD SHAH L4 | RIYAZ AHMAD BHAT L5 | M/S.SALEEM.ENTERPRISES L6 | MOHAMMAD RAFIQ RATHER L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed excluding the cost of centering and shuttering. All work up to plinth level including all carriage of material as involved upto site of work complete. | 32.25 | Cum | - | - | - | - | - | - | - |
| 2.00 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) Crushed in suspended floors excluding the cost of centering and shuttering but including all carriage of material as involved upto site of work complete. | 157.78 | Cum | - | - | - | - | - | - | - |
| 3.00 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars including all carriages complete. | 23,174 | Kg | - | - | - | - | - | - | - |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for: | ||||||||||
| 4.01 | a) Rafts Foundations, footings, bases of columns etc for mass concrete. | 15 | Sqm | - | - | - | - | - | - | - |
| 4.02 | b) Plinth beam, lintel beam griders bressumers and cantilevers. | 310.9 | Sqm | - | - | - | - | - | - | - |
| 4.03 | c) Column Pires and abutment etc. | 35.89 | Sqm | - | - | - | - | - | - | - |
| 4.04 | d) Suspended floors, roofs, landings, balconies and access plat form. | 666.91 | Sqm | - | - | - | - | - | - | - |
| 4.05 | e) Edges of slab and breaks in floors under 20cm wide. | 179 | Rm | - | - | - | - | - | - | - |
| 5.00 | Structural steel work welded in built up sections, framed work (Trash Guard) using angles flats, channels or as required including cutting, welding hoisting fixing in position and applying a priming coat of approved steel primer including all carriages complete. | 25,500 | Kg | - | - | - | - | - | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
24 Aug 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM Housing Board Unit-I Srinagar
Office of the Deputy General Manager Housing Board Unit-I, Barbar Shah, Srinagar
Construction of NTPHC Sharshali at Pulwama Kashmir.
2020_HAUDD_101708_2
E-NIT No 02 of 2020-21 Dated 31/07/2020
Open Tender
Civil Works
Item Rate
700 days
Pulwama
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,600
Credited in A/c 0361040500004285 (JAKA0RAWWAL)
₹2.2 L
11 Sept 2020
4 Aug 2020
25 Aug 2020
4 Aug 2020
24 Aug 2020
4 Aug 2020
90 days
Amount
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed excluding the cost of centering and shuttering. All work up to plinth level including all carriage of material as involved upto site of work complete.
Providing and laying in position reinforced cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) Crushed in suspended floors excluding the cost of centering and shuttering but including all carriage of material as involved upto site of work complete.
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars including all carriages complete.
Centering and shuttering including strutting, propping etc. and removal of form for:
a) Rafts Foundations, footings, bases of columns etc for mass concrete.
b) Plinth beam, lintel beam griders bressumers and cantilevers.
c) Column Pires and abutment etc.
d) Suspended floors, roofs, landings, balconies and access plat form.
e) Edges of slab and breaks in floors under 20cm wide.
Structural steel work welded in built up sections, framed work (Trash Guard) using angles flats, channels or as required including cutting, welding hoisting fixing in position and applying a priming coat of approved steel primer including all carriages complete.
Brick work with common burnt clay FPS bricks of class designation 75 in cement mortar 1:6 (1 cement: 6fine sand) in superstructure above plinth upto required level including all carriages of materials as involved upto site of work.
Half brick work with common burn clay F.P.S (non –modular) brick of class designation 75 in superstructure above plinth level upto floor V level in cement mortar 1:6 (1 cement: 6 fine sand) including all carriage of material as involved upto site of work complete.
15mm thick cement plaster of mix 1:6 (1cement: 6fine sand) including all carriages of materials as involved upto site of work.
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length First class Kail wood including all carriage of materials as involved upto site of work complete.
Providing and fixing of plained eaves boarding of second class budloo wood of 300x40mm (nominal size) including all carriage of material as involved up to site of work complete
Providing and fixing of 12mm thick T&G planks made of imported wooden paneling (new Zealand pine or equivalent) for soffits including cost frame work Budloo and cost of nails complete job.
Providing and fixing track deck CRILL make or equivalent plain CGI colour coated sheets 100 to 1020mm cover wodth 28 to 35mm high crests at 250 to 225mm TCT (total coated thickness) high tensil SMP Galvalume steel complete job.
Providing and fixing pre coated galvanized steel sheet roofing accessories 0.50mm (+/- 5%) total coated thickness (TCT) Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling / self tapping screws or with polymer coated J or L hooks, bolts and nuts and G.I seam bolts, nuts, G.I plain and bitumen washers complete:
a) Ridges and hips 60cm wide.
b) Valleys 90cm wide.
Javaid Ahmad Dev
M/S BASHIR AHMAD DAR
M/S HILAL AHMAD SHAH
RIYAZ AHMAD BHAT
M/S.SALEEM.ENTERPRISES
MOHAMMAD RAFIQ RATHER
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_193594.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .