| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.8 LAdmitted-Finance | ₹65.8 L | L1 | Admitted-Finance |
| 2 | L2₹67.7 LAdmitted-Finance | ₹67.7 L | L2 | Admitted-Finance |
| 3 | L3₹72.5 LAdmitted-Finance | ₹72.5 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 133 131 | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | Rejected-Technical Tender Fees not Deposited |
| 5 | Rejected-Technical | - | - | Rejected-Technical EMD not Deposited |
| Sl No | Description | Qty | Unit | M/s VIRENDRA KISHOR PANDEY L2 | M/s Kakul Traders L1 | RAJ ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Safe loading, carriage and unloading & proper stacking of following store materials from any Electy. Store of Raebareli Zone to 33/11 KV S/S GareebGanj, Raebareli site (work site). | ||||||
| 2.00 | 3x300 mm2 33 KV XLPE Cable | 150 | Mtr. | 70 ₹10,500 | 20 ₹3,000 | 30 ₹4,500 |
| 3.00 | I/D & O/D Cable Jointing Kit suitable for 33 KV 3x300 mm XLPE Cable | 2 | No. | 200 ₹400 | 100 ₹200 | 300 ₹600 |
| 4.00 | Stay Set Complete | 4 | No. | 100 ₹400 | 100 ₹400 | 100 ₹400 |
| 5.00 | ACSR Dog Conductor | 60 | Mtr. | 55 ₹3,300 | 15 ₹900 | 5 ₹300 |
| 6.00 | 33 KV Pin Insulator | 6 | No. | 50 ₹300 | 100 ₹600 | 20 ₹120 |
| 7.00 | 33 KV Pin With Nut | 6 | No. | 50 ₹300 | 100 ₹600 | 20 ₹120 |
| 8.00 | Disc Insulator 70 KN | 12 | No. | 50 ₹600 | 100 ₹1,200 | 20 ₹240 |
| 9.00 | 33 KV Disc fitting | 3 | No. | 40 ₹120 | 100 ₹300 | 20 ₹60 |
| 10.00 | Top Channel M.S. 125x65x3200 mm | 1 | No. | 40 ₹40 | 500 ₹500 | 150 ₹150 |
Updated dates
Tender Value
₹77.4 L
EMD Value
₹77,400
Closing Date
11 Nov 2025, 12:00 pmClosed
Superintending Engineer EWCL
MVVNL, TIPE IV/3, TRANSMISSION STAF COLONY, DEVA ROAD, CHINHAT, Lucknow
UPPGRADATION OF EXISTING 33 3.3 KV TO 33 11 KV 2X5 MVA SUBSTATION AT DALMAU A PUMP CANNAL HEAD IN DISTT RAEBARELI. UNDER DEPOSITE SCHEME
2025_MVVNL_1081623_1
21/EWCL/2025-26
Open Tender
Electrical Works
90 days
RAEBARELI
As per PQR
2 documents required · 2 mandatory
₹3,540
SE EWCL
₹77,400
10 Dec 2025
10 Oct 2025
11 Nov 2025
10 Oct 2025
11 Nov 2025
10 Oct 2025
Amount
Safe loading, carriage and unloading & proper stacking of following store materials from any Electy. Store of Raebareli Zone to 33/11 KV S/S GareebGanj, Raebareli site (work site).
3x300 mm2 33 KV XLPE Cable
I/D & O/D Cable Jointing Kit suitable for 33 KV 3x300 mm XLPE Cable
Stay Set Complete
ACSR Dog Conductor
33 KV Pin Insulator
33 KV Pin With Nut
Disc Insulator 70 KN
33 KV Disc fitting
Top Channel M.S. 125x65x3200 mm
Droper Channel M.S. 100x50x2600 mm
ST Pole 11 Metre.
3 PH-4 W Static TVM 33 KV
33 KV Pilfer proof metering cubicle
Cost of 33 KV line Isolator
Cost of 33 KV Bus Isolator
Cost of Post Insulator
Cost of 33 KV Lightening Arrester
Cost of 33/11 KV 05 MVA Transformer
Cost of 33 KV VCB 800 Amp., 750 MVA
Cost of 33 KV CT 400/200/1 Amp.
Cost of 33 KV CT 200/100/1 Amp.
Cost of 33 KV Double T/F Control Pannel with structure.
Cost of 33 KV Single Feeder control pannel
600/300/5 AMP, 350 MVA Incoming
200/100/5 AMP, 350 MVA Outgoing
Bus Coupler,350 MVA
11 KV 3x70 Sqmm XLPE Cable
11 KV 3x300 SQ MM XLPE
11 KV 3x185 SQ MM XLPE
MS Channel 125x65, 3.2Mtr. Long 1,2,3,4 No Pieces for Top channel. 13.10 Kg/Mtr.+wastage.
MS Angles 50x50x6mm for bracing type members of T.G./B.G./Trench
MS Angles 75x75x8, 2.6mtr long, total 5.2 @ 8.9 Kg/Mtr.
MS Angles 75x75x6mm (6.8 Kg/Mtr.) for Neutral/Cable Stand
MS Round of 32 mm dia for earthmat (6.1 Kg/Mtr.)
Cost of ACSR Panther Conductor
33 KV Polymeric Disc Insulator B&S 7000 Kg
33 KV Disc fitting
33 KV Polymeric Pin Insulator With Nut & Washer
PCC Pole 8.5m long.
ST Pole 13 Mtr long SP-70
V-Type cross arm 100x50x6 mm, MS Channel 9.6 Kg./mtr.
LT ABC conductor (3x50+1x35+1x16)
Rail Pcs of 90 Lbs 3.46M long 2 No. Pcs 6.92M @ 44.61 Kg./M
MS Channel 100x50 mm (9.6 Kg/Mtr.) for Cable Stand
MS Angle 40x40x5 mm (3.0 Kg/Mtr)
Earthing of pole by MS Earthing rod 20x2500 mm & 6 SWG earthing wire etc Complete
Earthing of pole by MS Earthing rod 20x2500 mm & 6 SWG earthing wire etc Complete
11 KV 3x70 SQ MM XLPE Cable Outdoor
11 KV 3x70 SQ MM XLPE Cable Indoor
11 KV 3x300 SQ MM XLPE Cable Outdoor
11 KV 3x300 SQ MM XLPE Cable Indoor
11 KV 3x185 SQ MM XLPE Cable Outdoor
11 KV 3x185 SQ MM XLPE Cable Indoor
33 KV 3x300 SQ MM XLPE Cable Outdoor
33 KV 3x300 SQ MM XLPE Cable Indoor
Single Core PVC Cable 1x400 sq.mm.
MS.S Angle Iron 65x65x6mm, 4300 mm long 2no. Bracing with 4 clamps (5.8 Kg./m)
MS.S Angle Iron 65x65x6mm, 3200 mm long (13.10 Kg./m) with clamps
Top Channel 125x65mm, 3200 mm long (13.10 Kg./m( with
Complete Stay
Guarding Angle 75x75x6 mm, 2200 mm long. (6.8 Kg./mtr)
GI Wire 6 SWG for guarding along the line (120 mtr.)
GI Wire 8 SWG for guarding along the line (25 mtr.)
Transformer fencing for 630 KVA T/F
ABC 3x120 Sq.mm
33 KV CT/PT Metering pole mounded unit
EARTH MAT Laying of earth mat in the switchyard and Indoor by laying of M.S. Round of 32 mm dia in 500 mm deep trenches with M.S. Round 32mm dia,3Mtr. Long earth electrodes as per drawing. The work includes welding of the M.S. Round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6mm as per item below. (M.S. Round bar 32mm provided by Department )
Excavation of earth for laying mat
Driving of earth electrode.
Laying of earthmat (M.S.) Bar including cutting, shaping and binding etc)
Preparation of joints, proper making and welding; of main earthmat bar joints and applying, bitumen impregnated Paint on joints i.e. End Joints. Cross Joints, Lap Joints.
Welding of riser strip with earthmat and department structure body (One set means one riser strip welding to main equipments).
Plinth of 5MVA 33/11KV T/F: Construction of plinth of size 3.46 x4.46 Mtr. For 5MVA T/F having 0.4 Mtr. above ground level. The work includes excavation of foundation, base concretion of CC 1:4:8 ratio (cement, fine sand & brick ballast) first class brick work in cement morter of rtio1:4 foundation CC in 1:4:8 ratio(cement, find sand & brick ballast) and RCC work in ratio 1:2:4 (cement, coarse sand and stone grit of 20mm gauge using MS bar of 10mm dia(tor) in reinforcement including its cutting, bending & binding in required shape. The work also includes laying of 2 No. 3.46 mtr. long rail pieces complete with cutting, welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/ finished on top and sides of the plinth.(All decentrlised materials to be provided by Contractor).
Isolator Structure: Fabrication of Isolator Structure 3.5 mtr in height as per Drg. digging of two no. pits of size 1.075x0.9x0.3 mtr. providing Stone Pad at the bottom of the pit and grouting of two legs of the isolator structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the isolator structure shall be properly finished with smoothing of edges.(All decentralised materials to be provided by Contractor).
Lightening Arrestor, Post Insulator,Fuse Set & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges. (All decentralised materials to be provided by Contractor).
Plinth of VCB : Construction of Plinth of size 2.0 mtrx1.5mtrx0.9mtr. suitable for erection of upper structure of 33KV VCB including grouting of anchor bolts in proper alignment and level. Scope of work includes excavation of foundation base and concreting in CC 1:3:6 (cement, find sand & stone grit) 1st class brick work in cement mortor ratio 1:4:8.(All decentralised materials to be provided by Contractor).
Erection and installation of 33/11KV 05 MVA T/F
Erection and installation of 33/11KV 05 MVA T/F in a levelled position of the plinth. The work includes shifting of T/F to the site & installation within the S/S premises, assembling, fixing and fitting of all accessories with required packing and filling of T/F oil upto desired level. Ensuring that there is no leakage and all jumpering & connection are included in the scope of work.
Earthing for power T/F by way of boring and lowering of 40mm dia, 2.9 mm thick GI Pipe B class from ground upto the water level (minimum 60 feet deep) as per standard practice as per RESPO/REC Drg with making of earth pit of 300x300 mm & 1 feet deep with Cover. (All materials to be provided by Contractor).
Fabrication and grouting (1:4:8) of MS Channel 100x50mm in L Shape & in proper size and alignment to provide support through GI earthing strips (50x6)mm size for power transformer neutral including supply & fixing of flexible copper bonds for neutral earthing as per RESPO Drg. (All decentralised materials to be provided by Contractor).
Fabrication and erection of cable support made of two pieces of MS channel 100x50mm, 3.0 mtr. long joined to each other by means of 5 no. MS Flat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in block of size 300x300x700mm (1:4:8) complete. This includes providing of required MS Clamp made of MS Flat holding the cable including nuts & bolts and fixing of XLPE cable .(All decentralised materials to be provided by Contractor).
Installation of Isolators: Assembling and installation of line/ bus isolator on the isolator structure adjusting of opening mechanis in proper alignment so as to ensure smooth operation of the same. In case of line isolator proper operation of earth links shall also be ensured. The work includes fabrication & proper connection with earthmat/earthing by G.I. earth strip 50x6mm proper fixing if required (All decentralised materials to be provided by Contractor).
Installation of P.I. & Lightening Arrestors : Assembling, installation & mounting of 3 No.(1set) L.A. & Post insulator on the L.A & P.I. Structure/complete with making earth connections (separate) with GI Strip 50x6mm. The work includes fabrication for fixing if required. (All decentralised materials to be provided by Contractor).
Installation of CT: Installation of 3 No.(1 set) CT on the CT Structure along with CT Junction Box. The work includes fabrication, proper fixing of C.T. with making earth connections(Earth Mat/earthing) with GI Strip 50x6mm and control wiring connection, proper commissioning & testing.(All decentralised materials to be provided by Contractor).
Installation of VCB: Installation of 33KV VCB complete work with making earth connections(Earth Mat/earthing) with GI Strip 50x6mm including control wiring, commissioning & testing (All decentralised materials to be provided by Contractor).
Installation of Switchgears in Control Room:
Shifting carefully & installation safely 11KV I/C, O/G & Bus Coupler switchgears from outside the switchgear room placing and fixing of switchgear on foundation providing G.I. Bolt & Nuts of proper size in proper position and alignment. This includes checking, complete work with mounting of P.T. on incoming S/G with proper testing, connetion of earthing & commissioning of switchgears.
Fixing and making Bus Bar connections in between all switchgears after cleaning and tapping with H.T. Tape, empire tape and PVC tape properly, providing and fixing of 6 mm thick Bakelite separators and plugging of all opening & holes with plastic compound complete work as per required.
Shifting carefully and installation of 33KV DOUBLE Transformer Control Panel in Control Room including fixing, bolting & grouting of above as per required and testing, commisioning complete work as per required.
Shifting carefully and installation of 33KV Single Feeder Control Panel in Control Room including fixing, bolting & grouting of above as per required and testing, commisioning complete work as per required.
Earthing of 11 KV, 33 KV Switchgears & Equipment: Earthing of 11 KV, 33 KV Switchgears equpiment by lowaring and boring of Chemical Earthing outside of switchyard and connecting through G.I. Strip 50x6mm with indoor/outdoor equipments with making of earth pit of 300x300 mm & 1 feet deep with Cover. (All the material provided by the contractor)
Painting of all structures and equipments with good quality ISI Mark one coat of red oxide primer & two coats of Aluminium Paint. (All materials to be provided by Contractor).
HT Cable Laying :
Laying & dressing of 33KV 3x300 Sq.mm XLPE cable (Double CKT.) from 5MVA T/F to 11KV incoming Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
Laying & dressing of 11KV 3x300 Sq.mm XLPE cable (Double CKT.) from 5MVA T/F to 11KV incoming Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
Laying & dressing of 11KV 3x185 Sq.mm XLPE cable (Double CKT.) from 11KV O/G Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below & above the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
Laying & dressing of 11KV 3x70 Sq.mm XLPE cable (Double CKT.) from 11KV O/G Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below & above the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
Hoisting of 11KV Cable with 100 mm dia 3 Mtr. long GI Pipe on the feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11KV feeder cable boxes on the feeder double pole structure and making connection including supply of cable mounting clamps. The work includes the sealing of GI Pipes, lower end of the pipe is to be buried into the earth by about one foot.(All decentralised materials to be provided by Contractor).
Hoisting of 11KV XLPE Cable for 11 KV switchgears & 33/11KV T/F of requried size.
33 K.V. SECTIONAL BUS BAR AND STRINGING : Stringing of 33KV bus bar using of ACSR Panther Conductor including fixing of Disc insulators. Strings and tension fitting complete with sagging of bus bar etc. and making vertical/Horizontal jumper connection through PG Clamps and connecting all the equipments with each other through connecting clamps. Work includes all the jump ring from terminal gantry to bus bar and from bus bar to transformer (1no. T/f bay's)
Construction of Control Cable trench of size 300x300mm including brick work 1:4 in wall of the trench, brick ballast work in 1:5:10 on foundation plaster 12mm thick with coarse sand 1:4 and surface finishing with cement, providing MS Strip at an interval of 0.5 Mt. and MS Angle (25x25x5mm) running on both the edges of trench. (All decentralised materials to be provided by Contractor).
Construction of welded frame type control cable trench cover 0.5 Mt. long suitable for trench including cost of MS/Tor Bar.(All decentralised materials to be provided by Contractor).
Supply and laying of following size Copper Control Cable through underground/cable trench/trenching SGR interlinking through proper connections to T/F Control panel/protection board/Battery and Battery Charger/Bunch joints, Relay 33/11KV T/F junction Box/33KV VCB, CTs etc. as per site conditions:
2x2.5 Sq.mm
4x2.5 Sq.mm
Supply and fixing of Control Cable Trey
Fixing of Single Core PVC Cable, 1x240/400/630 sq.mm. & fixing between Transformer incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing.
Supply and Installation of 24 Volt Battery and it charger with connections to existing control circuit complete in all respects.
Supply and fixing of Rubber mat 8/10mm, 2x4mtr.
STATION SWITCHYARD LIGHTENING
Erection of 8.5 Mtr.PCC Pole after excavation of earth in any type of soil and grouting of CC in ratio 1:4:8 (cement coarse sand & brick ballast) as per RESSPO Drg. With plinth.(All decentralised materials to be provided by Contractor).
Fixing & supply of 40 watt. LED street light complete fitting and of standard quality ISI markwith water light fittings, elbow etc. complete in all respect and suitable for above supports.(All materials to be provided by Contractor).
Supply & Laying of 3.5 x 70/35 Sq.mm PVC LT cable from 11/.04 kv,63KVA T/F to LT Distribution Board in switchgear room after digging the trench, laying cable and refilling of trench including connection at both ends after providing and crimpling of lugs of proper size, complete work.(All materials to be provided by Contractor).
Supply and laying of 2x6 sq. mm. aluminum cable from S.G. room to street light supports after digging of trench, laying of cable, providing a brick on top of cable , refilling of trench, making connections at poles with street light fittings, complete in all respect.(All materials to be provided by Contractor).
Soil filling of yard
Cost of Yard Leveling and Brick of Edge Bar
Providing of fire buckets stand ( Hut Type) made of M.S. Angle 50x50x6mm as per drawing with fabrication and grouting and painting by post office red paint and letter writing etc. complete including the cost of fire bucket-6 Nos. in the switch yard of the sub-station filled with Ganga sand.
Erection of the following support including cutting, making holes, fixing of all types of accessories digging pits complete in all respect as per RESSPO drawing. All type of clamps nut & bolt, washer to be provided by contractor.
33 KV Single support of ST Pole 13 mtr long.with X Arm, Pin insulator & other all accessories
33 KV Section Double pole structure on ST Pole 13 mtr long complete with Top Channel,bracing.& other all acessories
Erection/fixing for 33 KV Stay set with stay wire 7/8 SWG and clamp as per RESSPO drawing including binding, clambing, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, sand and stone grit (RCC) and sand before back filling of the pits as per RESSPO schedule all clamps, nuts & bolts, cement, brick, concrete blast and etc would be provided by contractor.(Stay Set , Stay wire to be provided by Dept.)
Concreting of supports in 1:4:8 ratio and plinthing of supports upto 300mm above ground level by using cement, stone grit (RCC) and corase in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor.
Cradle type Guarding of HT/LT/Telephone line/ road/river crossing etc. by providing GI wire No. 6/8 and making net with difference of 1.00 Mtr. Completely including fixing of channel/angle etc. with proper locking at each support. All type of nut bolt ,clamp to be provied by the contractor.
Supply, Erection, Installation & Testing of Capacitor Bank 1.98 MVAR in all respect with it civil foundation, cable hositing stand etc. in Switchyard of dalmau 'A' pump Canal (All materials to be provided by Contractor).
Painting of following supports with one coat of red oxide primer and two coats of aluminum white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete of job.
Single Pole of 13 M S.T.P
Double Pole of 13 M S.T.P
Providing & Fixing of 33 KV SMC Danger board ( as per GTP)with Clamp & Nut Bolt
Providing & Fixing of 33 KV SMC Number Plate ( as per GTP) with Clamp & Nut Bolt
Providing & Fixing of G.I. Barbed wire (2 Kg./pole)
Providing & Fixing of Stone Pad (300x300x75 mm)
Testing & Commissing of all equipment
Safe Shifting and Carriage of Power Transformer
Dismantling, Shifting of Old & Used Structure
Transformer fencing for 630 KVA T/F
Installation of 11 KV Pilfer Metering Cubicle in meter room with both side cable connection with proper loading,unloading and staking
Installation of 11 KV CT/PT Metering Pole Mounted Unit on Double Pole outside consumer premises with both side cable connection with proper loading,unloading and stacking.
M/s VIRENDRA KISHOR PANDEY (BID ID -5609554)
RAJ ENTERPRISES (BID ID -5645946)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
SBD21.pdf
Tender Documents • 0.97 MB
TenderFormSchedule.pdf
Additional Documents • 0.27 MB
BOQ_1980324.xls
BOQ • 13.37 MB
Download all tender documents and submit your bid