| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹4.7 Cr+₹29.6 L (6.67%)Rejected-Finance A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | ₹4.7 Cr+₹29.6 L (6.67%) | L2 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹9.1 L
Closing Date
15 Jun 2023, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
1st floor, DRDA, Collectorate campus,Tiruvarur
Construction of Bridge in Keluvankadu Kandhan Pirichan- Ex Colony road at ch.6/8 in kandaparichan River
2023_RDTN_125381_1
TN21347
Open Tender
Civil Works - Bridge Construction
Item Rate
360 days
Muthupettai
As per tender Document
3 documents required · 3 mandatory
₹0
₹9.1 L
1st floor, DRDA, Collectorate campus,Tiruvarur
15 Apr 2024
25 May 2023
15 Jun 2023
25 May 2023
15 Jun 2023
25 May 2023
29 May 2023
Amount
Construction ofBridge in Keluvankadu Kandhan Pirichan- Ex Colony road at ch.6/8 in kandaparichan River
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for PILE CAP UNDER ABUTMENTS & PIERS.
Providing and driving in position permanet M.S liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6 mm thick liner to be left peramnently with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S sheet etc., complete for PILES BELOW ABUTMENTS & PIERS.
Reinforced cement concrete cast-in-situ bored piles of 1000 mm diameter M-30 grade using 20mm 10mm & below ISS size HBG metal with minimum cement content of 400kg per cu.m maximum water cement ratio of 0.4 and slump of 150 - 200mm by tremie concreting including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel including placing of reinforcement in position, concreting, including all labour charges for driving or boring, mobilisation of piling equipment and other accesssories required for driving the pile, cost of Bentonite solution and the temporary liners, chiselling and including forming of working platform over the river bed for accommodating piling eqipments, forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for the casting the pile caps, including diversion of water course if necessary and all other incidental charges tec., complete as per standard specifications etc., complete for PILES BELOW ABUTMENTS & PIERS.
Vibrated Cement Concrete of Grade M 15 Nominal Mix 1:2.5:5 using 40mm, 20mm and 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below PILE CAP OF ABUTMENTS & PIERS
Vibrated reinforced Cement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for PILE CAP under ABUTMENT, WNGS and PIERS
Vibrated reinforced cement concrete M 30 Grade using 20 & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS BELOW SILL LEVEL -
Vibrated reinforced cement concrete M 30 Grade using 20 & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL -
Vibrated reinforced Cement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Below SILL LEVEL
Vibrated reinforced Cement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Above SILL LEVEL
Vibrated Reinforced Cement Concrete M 30 Grade using 20 & 10 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS.
Vibrated reinforced Cement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Capping Beam above Column Pier
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.
Vibrated reinforced cement concrete M 30 Grade using 20 & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for DECK SLAB, KERB .
Vibrated Reinforced Cement Concrete M-30 Grade using 20 mm & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAIL AND POSTS OVER DECK SLAB.
Vibrated reinforced cement concrete M 30 Grade using 20 mm & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APROACH SLAB.
Vibrated Cement Concrete M20 Grade using 40mm, 20mm & 10 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights for parapet over Wing Wall.
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
Provinding and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.
Vibrated Cement Concrete of Grade M 15 Nominal Mix 1:2.5:5 using 40mm, 20mm and 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASECOURSE BELOW APPROACH SLAB.
Vibrated cement Concrete M30 Grade using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Approach Road
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and Laying Gravel including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction (Shoulder)
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Retaining Wall
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Filling inside the Foundation with clean coarse M.Sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.
Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using, 40 mm, 20 mm & 10 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.
Vibrated Cement Concrete Grade M 20 using 40 mm, 20 & 10 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.
Vibrated Cement Concrete of Grade M 20 using 40 mm,20 mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete
Provision for Pile Load Test ( 2 Nos)
Bridge Safe Load Test
Provision for Name Board
Provision for Sign Board
Provision for Direction Board
Towards the charges for routine maintenance of the bridge work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits for bridge approach road, rivertraining works, white washing abutment and pier, painting of handrails/ crash barrier, repairing of damaged wearing coats, cealing of cracks with cement/ epoxy grouting, repairing of bearings, expansion joints, concrete railings / crash barrier with the periodicity for the above activities as prescribed in IRC- SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractors at its own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Kousic & Co
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .