Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹33.7 L
EMD Value
₹67,360
Closing Date
12 Oct 2026, 6:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DFO Lidder Forest Division Bijbehara
BIJBEHARA
Improvement Cum Upgradation of already established Nagervan at Munjhadan Mehand. Lidder Forest Division Bijbehara Under UT CAPEX 2026-27
2026_FD_327311_2
eNit 14 of 2026-27
Open Tender
Agricultural or Forestry
Percentage
Lidder Forest Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
PCCF JK
₹67,360
7 Oct 2026
7 Oct 2026
13 Oct 2026
7 Oct 2026
12 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 573.37 | CUM | 479.3 | ₹2,74,816.24 |
| 2 | Providing & laying dry stone solling, sand/dust including ramming, dressing etc complete in foundations and under floors, including Mech. Carriage & Head load charges up to site of work complete. | 30.51 | CUM | 1,000 | ₹30,510 |
| 3 | Providing & laying in position cement concrete (1cement: 4 coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. All work upto plinth level. | 6.55 | CUM | 5,202.9 | ₹34,078.99 |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work for.Foundations, footings, bases of columns etc. | 158.42 | SM | 286.35 | ₹45,363.57 |
| 5 | Centering and shuttering including strutting, propping etc and removal of form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 3.49 | SM | 577.55 | ₹2,015.65 |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work f Columns, pillars, piers, abutments, posts and struts. | 14.87 | SM | 742.55 | ₹11,041.72 |
| 7 | Centering and shuttering including strutting, propping etc and removal of form work for Suspended Floors | 32.74 | SM | 718.2 | ₹23,513.87 |
| 8 | Centering and shuttering including strutting, propping etc and removal of form work for Edges of Slabs | 10.37 | RM | 262.2 | ₹2,719.01 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.77 | CUM | 7,788.4 | ₹37,150.67 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree landings balconies, shelves, chajjas, lintles, bands, plain window sills, staircases and spiral stair cases upto floor five level exculding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement: 1.5 coarse sand: 3 graded stone agg 20mm nominal size). | 3.54 | CUM | 9,821.85 | ₹34,769.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1107370.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .