Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹15.3 L+₹56,342 (3.83%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹17.8 L+₹3.1 L (21.1%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹19.0 L+₹4.3 L (29.5%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹20.5 L
EMD Value
₹40,921
Closing Date
17 Sept 2024, 3:00 pmClosed
Chief Engineer
VOCPA
Supply and Installation of 40 HP Kirloskar make pumps and motors for Beach water tank and 7.5HP Kirolskar make motor for Sewage pump houses in V.O.C Port
2024_VOCPT_207193_1
27CE/RCM BMR/2024-25
Open Tender
Civil Works
Works
120 days
VOCPA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹40,921
5 Nov 2024
4 Sept 2024
18 Sept 2024
4 Sept 2024
17 Sept 2024
4 Sept 2024
Amount
Supply, installation, testing and commissioning of Kirloskar make Horizontal End Suction Energy Effluent Centrifugal Pump Coupled with 40 HP / 30 KW, 1450 RPM,415V, III Phase TEFC squirrel cage A.C induction motor & mounted on a common base frame with foundation bolt and nuts along with Star Delta starter. Rate flow: 265m3 / Hr. Motor: 40HP / 1450 RPM/ III Phase / 50Hz / IE2 Energy Efficient. Accessories: Pump + Base frame + Coupling + Guard +Motor. The rate inclusive of cost of motor and pumps, starter, conveyance, installing in position, erection and commissioning by connecting with the existing water supply system at beach water tank and all labour charges etc., complete and as directed by the departmental officers. The existing repaired motor & pump shall be removed and hand over to maintenance sub division an average lead of 2 Km.
Supply and installation, testing and commissioning of KIRLOSKAR make 3x3 Self Priming Non-clog Bare Pump, coupled with 7.5HP, 2880RPM, 3Phase TEFC Squirrel Cage AC Induction Motor mounted on a common base frame with foundation bolt and nuts along with Star Delta starter etc., The rate inclusive of cost of motor starter, conveyance, installing in position, erection and commissioning by connecting with the existing sewage system at sewage pump houses and all labour charges etc., complete and as directed by the departmental officers. The existing repaired motor shall be removed and hand over to maintenance sub division an average lead of 2 Km.
GPS Enterprises
MITHUNA CONSTRUCTION
MARIA ANTONY JUDERAJA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Technicalbid.pdf
Tender Document • 1.15 MB
Tendernotice_1.pdf
Tender Document • 1.04 MB
BOQ_226558.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .