Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance R O BASGO | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Cost of tender document not fully paid. Rs 500/- |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-GST Clearance Certificate not fully submitted. |
Tender Value
₹14.8 L
EMD Value
₹29,700
Closing Date
9 Sept 2021, 2:00 pmClosed
Executive Engineer Construction Division Leh
Executive Engineer Construction Division Leh
Construction of R/Wall, Wall and Side Drain at Ayu Saboo
2021_PWD_4066_2
140 of CDL Leh of/2021-2022
Open Tender
Civil Works - Others
Item Rate
90 days
LEH
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Executive Engineer Construction Division Leh
₹29,700
25 Dec 2021
2 Sept 2021
10 Sept 2021
2 Sept 2021
9 Sept 2021
2 Sept 2021
Amount
Earth work in excavation by mechanical means (hydraulic excavator ) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 meters: ll All kinds of soil
Dumping stone including cost of stones. In Horizontal on level
Providing and laying in Position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand: 8 graded stone aggregate 40 mm nominal size)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement :6 coasre sand)
Dry random rubble masonry with hard stone in foundation and plinth With bond stone.
Providing and alying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20 mm nominal size) and curing complete
Centering and shuttering including strutting, propping etc. and removal of form for: a)Foundation, footings, bases of columns etc. for mass concrete
Carriage and shuttering including strutting, propping etc. and removal of form for: a)Foundation, footings, bases of columns etc. for mass concrete.
b)Stone an avg lead 20 kms
c)Stone agg.an avg lead 20 kms
d)Stone an avg lead 25 kms
GIGMAT PALJOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .