| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC Out of Two tenders recvied, The lowest Rate Quoted by D. Rajagobal, Contractor, Valathamangalam at 0.04 Less Estimate may be approved. |
| 2 | L2₹4.3 LRejected-Finance | ₹4.3 L | L2 | Rejected-Finance The Above Rate Quoted |
| Sl No | Description | Qty | Unit | D. RAJAGOPAL L1 | S.NATESAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of BG Shed at Thoppu theru mayanam in Arunthavapuram Panchayat | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B. | 13.72 | Cu.m | 263.58 ₹3,616.32 | 264.78 ₹3,632.78 |
| 3.00 | Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications | 9.99 | Cu.m | 2,404.35 ₹24,019.46 | 2,405.55 ₹24,031.44 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 7.89 | Cu.m | 6,253.03 ₹49,336.41 | 6,254.23 ₹49,345.87 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4"and conveyance of all materials to site and all labour charges etc complete | 5.57 | Cu.m | 6,274.9 ₹34,951.19 | 6,276.1 ₹34,957.88 |
| 6.00 | Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 557.59 | Kg | 91.7 ₹51,131 | 92.9 ₹51,800.11 |
| 7.00 | Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete. | 47.04 | Sq.m | 1,094.8 ₹51,499.39 | 1,096 ₹51,555.84 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete | 6.31 | Cu.m | 9,986.6 ₹63,015.45 | 9,987.8 ₹63,023.02 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.72 | Cu.m | 9,332.47 ₹44,049.26 | 9,333.67 ₹44,054.92 |
| 10.00 | Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc | 24.73 | Sq.m | 291.75 ₹7,214.98 | 292.95 ₹7,244.65 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
4 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT)
Panchayat Union office , Ammapettai
Construction of BG Shed at Thopputheru mayanam in Arunthavapuram Panchayat at Ammapettai Block
2026_RDTN_666596_27
3410/2025/A2 Date.23.02.2026
Open Tender
Civil Works - Buildings
Panchayat Union office, Ammapettai.
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹4,500
15 May 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
Construction of BG Shed at Thoppu theru mayanam in Arunthavapuram Panchayat
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4"and conveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick includingcost and conveyance of all materials to site and all labour charges etc
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
TechnicalBit.pdf
Tender Documents • 0.66 MB
PriceBit.pdf
Tender Documents • 0.75 MB
BOQ_801440.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid