Tender Value
₹5.6 L
EMD Value
₹5,600
Closing Date
30 Jun 2026, 2:00 pm
Similar tender results from the same govt authority in the past 3 years.
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_681230_1
OT-003/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
120 days
Gummidipoondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,600
Yes
16 Jun 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Labour charges for dismantling of Reinforced Cement Concrete using deploying machineris including all materials, labour, transport, lead and lift etc., complete as directed by the department engineer at site. | 6 | M3 | - | - | - |
| 2 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 19 | M3 | - | - | - |
| 3 | Providing M sand filling in foundation including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 4 | M3 | - | - | - |
| 4 | Plain Cement Concrete 1:4:8 using 40 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | 4 | M3 | - | - | - |
| 5 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 5 | M3 | - | - | - |
| 6 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 560 | Kgs. | - | - | - |
| 7 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 3 | M3 | - | - | - |
| 8 | Providing and laying P:C:C 1:2:4 using 20mm HBG metal including cost of all materials, curing,labour, lead, Lift, labour for laying concrete etc., complete as per standard specification and as directed by the department engineer at site. without form work | 5.5 | M3 | - | - | - |
| 9 | Providing and laying P:C:C 1:2:4 using 12 to 20mm HBG metal for Transformer plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 6 | M3 | - | - | - |
| 10 | Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site. | 17 | Nos. | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_818648.xls
BOQ • 0.27 MB
OT003.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid