| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 LRejected-Finance NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | ₹4.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.7 LRejected-Finance | ₹4.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹4.8 LRejected-Finance | ₹4.8 L | L4 | Rejected-Finance L4 |
| 5 | L5₹4.9 LRejected-Finance | ₹4.9 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | J JAGADESH KUMAR L5 | R MANIVANNAN L1 | JAGAN ENTERPRISES L2 | PERUMAL.S.K L6 | SCAN CONSTRUCTION L3 | ALLIRAJ CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Labour charges for dismantling of Reinforced Cement Concrete using deploying machineris including all materials, labour, transport, lead and lift etc., complete as directed by the department engineer at site. | 6 | M3 | 352 ₹2,112 | 3,000 ₹18,000 | 2,500 ₹15,000 | 3,000 ₹18,000 | 3,000 ₹18,000 | 340 ₹2,040 Lowest |
| 2.00 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 19 | M3 | 176 ₹3,344 | 150 ₹2,850 | 90 ₹1,710 Lowest | 200 ₹3,800 | 95 ₹1,805 | 170 ₹3,230 |
| 3.00 | Providing M sand filling in foundation including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 4 | M3 | 3,080 ₹12,320 | 1,500 ₹6,000 | 1,000 ₹4,000 | 700 ₹2,800 Lowest | 2,000 ₹8,000 | 2,975 ₹11,900 |
| 4.00 | Plain Cement Concrete 1:4:8 using 40 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | 4 | M3 | 6,600 ₹26,400 | 6,000 ₹24,000 | 6,000 ₹24,000 | 3,500 ₹14,000 Lowest | 6,500 ₹26,000 | 6,375 ₹25,500 |
| 5.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 5 | M3 | 10,120 ₹50,600 | 6,000 ₹30,000 Lowest | 8,000 ₹40,000 | 10,000 ₹50,000 | 8,000 ₹40,000 | 9,775 ₹48,875 |
| 6.00 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 560 | Kgs. | 97 ₹54,320 | 60 ₹33,600 Lowest | 75 ₹42,000 | 75 ₹42,000 | 85 ₹47,600 | 93 ₹52,080 |
| 7.00 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 3 | M3 | 11,000 ₹33,000 | 7,000 ₹21,000 Lowest | 12,000 ₹36,000 | 15,000 ₹45,000 | 10,000 ₹30,000 | 10,625 ₹31,875 |
| 8.00 | Providing and laying P:C:C 1:2:4 using 20mm HBG metal including cost of all materials, curing,labour, lead, Lift, labour for laying concrete etc., complete as per standard specification and as directed by the department engineer at site. without form work | 5.5 | M3 | 6,160 ₹33,880 | 5,000 ₹27,500 Lowest | 8,000 ₹44,000 | 9,000 ₹49,500 | 8,000 ₹44,000 | 5,950 ₹32,725 |
| 9.00 | Providing and laying P:C:C 1:2:4 using 12 to 20mm HBG metal for Transformer plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 6 | M3 | 8,360 ₹50,160 | 8,000 ₹48,000 Lowest | 10,000 ₹60,000 | 15,000 ₹90,000 | 11,000 ₹66,000 | 8,075 ₹48,450 |
| 10.00 | Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site. | 17 | Nos. | 1,144 ₹19,448 | 1,500 ₹25,500 | 500 ₹8,500 Lowest | 3,000 ₹51,000 | 2,500 ₹42,500 | 1,105 ₹18,785 |
Tender Value
₹5.6 L
EMD Value
₹5,600
Closing Date
30 Jun 2026, 2:00 pmClosed
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_681230_1
OT-003/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Gummidipoondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,600
Yes
27 Aug 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for dismantling of Reinforced Cement Concrete using deploying machineris including all materials, labour, transport, lead and lift etc., complete as directed by the department engineer at site. | 6 | M3 | - | - |
| 2 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 19 | M3 | - | - |
| 3 | Providing M sand filling in foundation including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 4 | M3 | - | - |
| 4 | Plain Cement Concrete 1:4:8 using 40 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | 4 | M3 | - | - |
| 5 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 5 | M3 | - | - |
| 6 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 560 | Kgs. | - | - |
| 7 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 3 | M3 | - | - |
| 8 | Providing and laying P:C:C 1:2:4 using 20mm HBG metal including cost of all materials, curing,labour, lead, Lift, labour for laying concrete etc., complete as per standard specification and as directed by the department engineer at site. without form work | 5.5 | M3 | - | - |
| 9 | Providing and laying P:C:C 1:2:4 using 12 to 20mm HBG metal for Transformer plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 6 | M3 | - | - |
| 10 | Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site. | 17 | Nos. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_818648.xls
BOQ • 0.27 MB
OT003.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].