| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.5 LAccepted-AOC | 1 | Accepted-AOC Tenderer coated as per Estimate Amount | |
| 2 | 2₹13.6 L+₹7,068.19 (0.52%)Rejected-Finance TAMIL NADU TN | 2 | Rejected-Finance Tenderer coated Above Estimate Amount |
| Sl No | Description | Qty | Unit | BHAVANI AMMAN ENTERPRISES L2 | M JAYAPRAKASH L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 139.2 | CUM | 265 ₹36,888 | 263 ₹36,609.6 Lowest |
| 2.00 | Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete. | 13.92 | CUM | 1,745.6 ₹24,298.75 | 1,736.5 ₹24,172.08 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete | 20.88 | CUM | 5,469.6 ₹1,14,205.25 | 5,442.2 ₹1,13,633.14 Lowest |
| 4.00 | Centering charges for all CC items of works including all labour charges etc., complete. | 403.58 | SQM | 275 ₹1,10,984.5 | 273.5 ₹1,10,379.13 Lowest |
| 5.00 | Supplying and fabrication of steel including cost and conveyance and all other labour charges etc complete. | 2.21 | MT | 92,318 ₹2,04,299.73 | 91,858 ₹2,03,281.75 Lowest |
| 6.00 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyance and all other labour charges etc complete. | 63.78 | CUM | 9,373 ₹5,97,809.94 | 9,326 ₹5,94,812.28 Lowest |
| 7.00 | Earthwork Excavation for 63mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B (in Rm) | 190 | RM | 195 ₹37,050 | 194 ₹36,860 Lowest |
| 8.00 | Supply & Delivery of 63mm OD PVC Pipe as per IS 4985/2000 6.00 kg per Sqcm including cost & Conveyance of all materials & all Labour charges etc complete | 190 | RM | 74 ₹14,060 | 73.5 ₹13,965 Lowest |
| 9.00 | Lowering and Laying the PVC 63mm Pipes and Specials to Trench, Laying to Proper Grade and Alignment, Jointing with PVC Coupler and Specials etc completed | 190 | RM | 22 ₹4,180 Lowest | 22 ₹4,180 Lowest |
| 10.00 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. 1x0.60x1.05=0.378 | 190 | RM | 27 ₹5,130 | 26.5 ₹5,035 Lowest |
Tender Value
₹13.7 L
EMD Value
₹14,000
Closing Date
24 Sept 2025, 3:00 pmClosed
The Block Developement Office (BP)
St Thomas Mount Panchayat union
CONSTRUCTION OF RCC STORM WATER DRAIN FROM GANDHI STREET TO LAL BHADUR SHASTRI STREET IN MUDICHUR PANCHAYAT ST THOMAS MOUNT PANCHAYAT UNOIN. SCHEME OF PUGF 2025 - 2026 ESTIMATE AMOUNT RS.13.65 LAKHS
2025_RDTN_604786_1
2584/2024/A2, dt. 09.09.2025,
Open Tender
Civil Works - Water Works
Item Rate
120 days
MUDICHUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹14,000
Yes
9 Oct 2025
16 Sept 2025
24 Sept 2025
16 Sept 2025
24 Sept 2025
16 Sept 2025
Amount
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete.
Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete
Centering charges for all CC items of works including all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance and all other labour charges etc complete.
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyance and all other labour charges etc complete.
Earthwork Excavation for 63mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B (in Rm)
Supply & Delivery of 63mm OD PVC Pipe as per IS 4985/2000 6.00 kg per Sqcm including cost & Conveyance of all materials & all Labour charges etc complete
Lowering and Laying the PVC 63mm Pipes and Specials to Trench, Laying to Proper Grade and Alignment, Jointing with PVC Coupler and Specials etc completed
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. 1x0.60x1.05=0.378
Supply and Fixing of 50mm Dia GM Gate Valve including cost and coveyance of all Materials & all Labour Charges etc completed
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
BHAVANI AMMAN ENTERPRISES (BID ID -1470470)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_722888.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .