| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹45.2 LAccepted-AOC SAHEBGANG | GODDA | JHARKHAND | 813208 | ₹45.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹46.0 L+₹79,698.61 (1.76%)Rejected-Finance DUMKA | DUMKA | DUMKA | JHARKHAND | ₹46.0 L+₹79,698.61 (1.76%) | 2 | Rejected-Finance L2 |
Tender Value
₹51.8 L
EMD Value
₹1.0 L
Closing Date
18 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
R.D SPL DIVISION, GODDA.
CONSTRUCTION OF BLOCK PUBLIC HEALTH UNIT UNDER BLOCK GODDA DISTRICT GODDA.
2026_RDSPL_111431_1
RWD/SD/GODDA/13/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
GODDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.0 L
18 Jul 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 130.5 | CUM | 151.82 | ₹19,812.51 |
| 2 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 91.7 | CUM | 55.28 | ₹5,069.18 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 19.73 | CUM | 3,751.64 | ₹74,019.86 |
| 4 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | 25 | SQM | 278.35 | ₹6,958.75 |
| 5 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 61.2 | SQM | 351.75 | ₹21,527.1 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 32.31 | CUM | 5,218 | ₹1,68,593.58 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 8.51 | CUM | 6,082.45 | ₹51,731.24 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 34.24 | CUM | 6,308.87 | ₹2,16,015.71 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 12.38 | CUM | 6,308.87 | ₹78,103.81 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 18 | SQM | 194.5 | ₹3,501 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.97 MB
BOQ_150470.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .