Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical BHUBANESWAR MUNICIPAL CORPORATION BHUBANESWAR | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹80.9 L
EMD Value
₹81,000
Closing Date
17 Sept 2026, 5:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Construction of Public Toilet at Mali Sahi in Ward No. 41, Bhubaneswar
2026_ORULB_139703_2
BMC-EE-Tender Cell-57/2026-27 dt. 28.08.2026
Open Tender
Civil Works - Others
Percentage
120 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹81,000
Yes
Office Chamber of EE(Central Tender Cell)
18 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
17 Sept 2026
31 Aug 2026
31 Aug 2026 - 8 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork by using hydraulic excavator of 1 cum bucket and depositing the excavated materials, including loading and unloading with all cost conveyance T&P sundries etc. complete as per direction of Engineer-in-Charge. | 125.78 | Cum | 209.95 | ₹26,407.76 |
| 2 | Supplying, filling foundation & plinth with sand including watering, ramming, cost, conveyance, royalty, taxes of all materials and labour (T&P) etc. complete. | 198.16 | Cum | 588.9 | ₹1,16,695.89 |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal | 59.32 | Cum | 5,204.95 | ₹3,08,736.86 |
| 4 | R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. I. Below Foundation= A. Footing | 18.31 | Cum | 7,139.23 | ₹1,30,722.85 |
| 4.01 | b) Column Up to Plinth Beam Top C1-26 | 2.57 | Cum | 18,985.27 | ₹48,868.08 |
| 4.02 | c) Plinth beam | 21.91 | Cum | 8,033.23 | ₹1,76,008.08 |
| 4.03 | II. Ground Floor= a) Column | 4.86 | Cum | 18,985.27 | ₹92,268.39 |
| 4.04 | b) Beam | 7.11 | Cum | 18,985.27 | ₹1,35,008.03 |
| 4.05 | C) Slab | 10.84 | Cum | 14,451.48 | ₹1,56,601.41 |
| 5 | Providing HYSD reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | 64.9 | cum | 8,989.27 | ₹5,83,372.09 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
DTCN_57.pdf
Tender Documents • 0.94 MB
BOQ_607504.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .