Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance R O PATTA PALOURA 11 BAKSHI ENCLAVE JAMMU 180002 | JAMMU | JAMMU AND KASHMIR | 180002 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance R O JIB PANCHAYAT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹30.4 L
EMD Value
₹91,200
Closing Date
5 Jun 2023, 4:00 pmClosed
Divisional Forest Officer Jammu
Divisional Forest Officer Jammu Forest Complex Dogra Hall Jammu
Erection of Chain Link Fencing with concrete Toe Wall in Co.No.21and24/Bajalta of Bajalta Forest Block, Bahu Range, Jammu Forest Division
2023_FD_212306_1
29 of 2023-24
Open Tender
Civil Works
Item Rate
90 days
Co.No.21a24/Bajalta of Bajalta Forest Block, Bahu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Divisional Forest Officer
₹91,200
Yes
8 Jun 2023
16 May 2023
6 Jun 2023
16 May 2023
5 Jun 2023
17 May 2023
Amount
Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared.
Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size), including all leads,lift and carriage complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed including all leads,lift and carriage complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 40mm nominal size) Crushed including all leads,lift and carriage complete job. Qty 70%
Dumping/Supply of stones at site, working place with hand packing including all leads,lift and carriage complete job.
Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete
Supplying at site Angle iron posts & struts of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc. complete.
Providing and fixing G. I. chain link fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per direction of Engineer-in-charge. Made of G. I. wire of dia 4mm. To be paid as per actual
Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works. To be paid as per actual
Sign board incl carriage PAINTING & WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet.
Amit Gupta
MOHD KHALID
sh. Bashir Ahmed Wani
MOHD AMIN WANI
balraj sharma Govt Contractor
ABHINANDAN SHARMA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .