Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC H N 335 SECTOR 2 M S RAM KUMAR GOVT CONTRACTOR H NO 335 SECTOR 2 URBAN ESTATE KURUKSHETRA | KURUKSHETRA | KURUKSHETRA | HARYANA | 136118 | L1 | Accepted-AOC OK | |
| 2 | L2₹1.2 L+₹2,422 (2.02%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST |
Tender Value
₹1.1 L
EMD Value
₹2,000
Closing Date
21 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Amit Malik
Executive Engineer, PD-2 Haryana PWD (B and R) Br. Kurukshetra.
Annual Repair to various Roads under Provincial Sub Division Ladwa Providing Speed Breaker)
2020_HRY_147539_1
PWD/AMB/KKR-2/110043
Open Tender
Construction Works
Works
30 days
Kurukshetra
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
E.E., Provincial Division No.2, PWD B and R Br.,
₹2,000
21 Jul 2022
13 Oct 2020
22 Oct 2020
13 Oct 2020
21 Oct 2020
13 Oct 2020
120 days
Amount
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing and Laying 50 mm thick Compacted bituminous macadam in (BM) in one layer by 100-120 TPH batch type/drum type hot mix plant and paver finisher with sensor control to the required grade as per clause No. 504 table No. 500-4 of MoRT&H specification for road and bridge works (5th Revision) of 2013 using minimum 3.4 % bitumen grade VG-30 as binder content by weight of total mix, complete in all respects i/c cost of bitumen, instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. Note: - If bitumen required is this account more than 3.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note:- Before laying BM on black top all cracks shall be sealed as MoRT&H clause No. 3004.3. which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification respectively. Proper measurement and consumption shall be entered in MB for crack sealed but no payment on this account shall be made as crack filling in incidental to work.
Providing & Laying 30mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate rollers to achieve the desired compaction as per clause No. 507 MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% to bitumen grade CRMB-55 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Where there is only BC on existing black top (without doing DBM), cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Note: In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR, the unit and nomenclature given in HSR shall be applicable.
Naresh Kumar Govt. Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .