Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-Finance | ₹1.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.0 Cr+₹14.5 L (7.86%)Rejected-Finance | ₹2.0 Cr+₹14.5 L (7.86%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.0 Cr+₹15.5 L (8.36%)Rejected-Finance KHASRA NO 974 NH 24 MEHRAULI GHAZIABAD UTTAR PRADESH | MEHRAULI | GHAZIABAD | UTTAR PRADESH | ₹2.0 Cr+₹15.5 L (8.36%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.4 Cr+₹55.5 L (30.0%)Rejected-Finance GRAM NAGLA LALE POST ALAMPUR FATEHPUR DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹2.4 Cr+₹55.5 L (30.0%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S SATISH KUMAR CONTRACTOR L4 | M/S KOSHER CONSTRUCTION PVT. LTD. L3 | kapil kumar contractor L2 | J P INFRATECH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Silt Clearence/trench digging including lift upto 1.50m and lead upto 6m , including cost of driver /assistence driver , POL, maintinence of machine, contractor profit, taxes etc but excluding levling, dressing & compaction etc. Complete. | 5,72,600 | Cum | 36 ₹2,06,13,600 | 30 ₹1,71,78,000 | 25.46 ₹1,45,78,396 | 24.15 ₹1,38,28,290 Lowest |
| 2.00 | Extra for dressing with mannual compaction including cost of all material , Lift, Labour,T&P etc for proper completion of work. | 5,72,600 | Cum | 6 ₹34,35,600 | 5 ₹28,63,000 Lowest | 9.38 ₹53,70,988 | 8.15 ₹46,66,690 |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
27 Jul 2026, 3:00 pmClosed
Superintending Engineer Drainage Circle Ghaziabad
OFFICE OF SE DRAINGE CIRCLE, GHAZIYABAD
Restoration and protection work of the internal section of the parallel Deobandh branch feeder channel
2026_UPIDC_1170818_5
04/SE/2026-27
Open Tender
Civil Works
Item Wise
30 days
ROORKEE
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.0 L
OFFICE OF SE DRAINGE CIRCLE, GHAZIYABAD
10 Sept 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt Clearence/trench digging including lift upto 1.50m and lead upto 6m , including cost of driver /assistence driver , POL, maintinence of machine, contractor profit, taxes etc but excluding levling, dressing & compaction etc. Complete. | 0.87 | Cum | - | - |
| 2 | Extra for dressing with mannual compaction including cost of all material , Lift, Labour,T&P etc for proper completion of work. | 0.87 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BookletTenderLot05.pdf
Tender Documents • 1.92 MB
BOQ_2197330.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .