Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-Finance AT POST SONAJ TAL MALEGAON DIST NASHIK | MALEGAON | NASHIK | MAHARASHTRA | L1 | Accepted-Finance Being Lowest (L1) | |
| 2 | L2₹36.0 L+₹3.6 L (11.3%)Rejected-Finance | L2 | Rejected-Finance Not Being Lowest | |
| 3 | L3₹36.2 L+₹3.9 L (12.1%)Rejected-Finance | L3 | Rejected-Finance Not Being Lowest | |
| 4 | L4₹37.4 L+₹5.1 L (15.8%)Rejected-Finance 26 8 2 PUNE MUMBAI ROAD OPP B U BHANDARI SHOWROOM EKTA PARK SOCIETY WAKDEWADI PUNE 411 003 | PUNE | MAHARASHTRA | 411003 | L4 | Rejected-Finance Not Being Lowest | |
| 5 | L5₹37.6 L+₹5.3 L (16.3%)Rejected-Finance FLAT NO 8 205 SNO 296 2 DIVINE HOMES PORWAL ROAD KSHEGAON PUNE 411 047 | PUNE | PUNE | MAHARASHTRA | 411047 | L5 | Rejected-Finance Not Being Lowest |
| Sl No | Description | Qty | Unit | vishalconstruction L4 | M/s Raghav Traders L2 | Aakar Construction L8 | Decent Decorators L7 | MAHESH DADAJI BACHHAV L1 | G B INFRASTRUCTURES L9 | M/s Khan Construction L6 | SHRI VINAYAK CONSTRUCTION COMPANY L3 | BSK Construction L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss effloerent salts and treading oil and greasy spots and applying one coat of white (lime) wash complete all as specified and directed by Engineer-in-Charge | 1,200 | Sqm | 22 ₹26,400 | 15 ₹18,000 | 15 ₹18,000 | 19 ₹22,800 | 10 ₹12,000 Lowest | 15 ₹18,000 | 20 ₹24,000 | 17 ₹20,400 | 10 ₹12,000 Lowest |
| 2.00 | All as specified in Item No 1 above but applying one coat of white wash on ceiling. | 2,000 | Sqm | 23 ₹46,000 | 17 ₹34,000 | 20 ₹40,000 | 19 ₹38,000 | 12 ₹24,000 Lowest | 19 ₹38,000 | 25 ₹50,000 | 19 ₹38,000 | 12 ₹24,000 Lowest |
| 3.00 | All as specified in item No 1 above but applying one coat of Oil Bound distemper on walls complete | 10,470 | Sqm | 35 ₹3,66,450 | 59 ₹6,17,730 | 50 ₹5,23,500 | 50 ₹5,23,500 | 30 ₹3,14,100 Lowest | 65 ₹6,80,550 | 60 ₹6,28,200 | 55 ₹5,75,850 | 40 ₹4,18,800 |
| 4.00 | M & L for complete scraping down of old decorative surface of walls with steel wire brushes of smoke spots, moulds, moss efflorecent salts and applying two coats of Oil bound distemper over layer of 1.5 mm Thick wall care putty all as specified and directed by Engineer-in-Charge. | 9,500 | sqm | 88 ₹8,36,000 | 80 ₹7,60,000 | 80 ₹7,60,000 | 80 ₹7,60,000 | 90 ₹8,55,000 | 110 ₹10,45,000 | 78 ₹7,41,000 | 77 ₹7,31,500 Lowest | 120 ₹11,40,000 |
| 5.00 | M & L for preparation of old surface of ceiling and applying one coat of oil bound distemper complete all as specified and directed. | 3,200 | Sqm | 36 ₹1,15,200 Lowest | 49 ₹1,56,800 | 48 ₹1,53,600 | 50 ₹1,60,000 | 40 ₹1,28,000 | 60 ₹1,92,000 | 52 ₹1,66,400 | 49 ₹1,56,800 | 50 ₹1,60,000 |
| 6.00 | M & L for one coat of synthetic enamel paint over wooden surfaces including preparation of old surfaces over 10cm width or girth all as specified and directed | 5,000 | Sqm | 66 ₹3,30,000 | 70 ₹3,50,000 | 65 ₹3,25,000 | 70 ₹3,50,000 | 45 ₹2,25,000 Lowest | 65 ₹3,25,000 | 80 ₹4,00,000 | 70 ₹3,50,000 | 65 ₹3,25,000 |
| 7.00 | M & L for painting one coat synthetic enamel paint on steel surface including preparation of old surface of any description , over 10 cm width or girth not otherwise described all as specified and directed | 2,500 | Sqm | 66 ₹1,65,000 | 70 ₹1,75,000 | 65 ₹1,62,500 | 70 ₹1,75,000 | 50 ₹1,25,000 Lowest | 80 ₹2,00,000 | 80 ₹2,00,000 | 80 ₹2,00,000 | 75 ₹1,87,500 |
| 8.00 | Taking down cement plaster on brick or stone walls or concrete surface etc including raking out joints, hacking for key scrubbing down with water all as specified and directed. | 900 | Sqm | 25 ₹22,500 Lowest | 37 ₹33,300 | 100 ₹90,000 | 105 ₹94,500 | 40 ₹36,000 | 66 ₹59,400 | 40 ₹36,000 | 37 ₹33,300 | 80 ₹72,000 |
| 9.00 | M&L 10 mm thick cement plastering on brick /concrete surfaces in CM (1:4) finishing surfaces even and fair without using extra cement over and including 10mm thick dubbing out on irregular face of wall in CM 1: 6 of any description complete all as specified. | 600 | Sqm | 250 ₹1,50,000 | 250 ₹1,50,000 | 300 ₹1,80,000 | 305 ₹1,83,000 | 240 ₹1,44,000 Lowest | 350 ₹2,10,000 | 300 ₹1,80,000 | 270 ₹1,62,000 | 250 ₹1,50,000 |
| 10.00 | M&L preparing newly plastered surfaces of wall and applying complete wall with 2mm POP/Birla putty and making smooth surfaces and applying two coats of Oil bound distemper over a coat of primer all as specified and directed by Engineer-in-Charge. | 500 | Sqm | 110 ₹55,000 | 60 ₹30,000 Lowest | 90 ₹45,000 | 115 ₹57,500 | 120 ₹60,000 | 110 ₹55,000 | 70 ₹35,000 | 60 ₹30,000 Lowest | 150 ₹75,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
12 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri Vikas Tanwar, IDSE, GE (CME) Khadki
Garrison Engineer (CME) Khadki, Phugewadi, Dapodi, Pune
PERIODICAL SERVICES AND WELCOME MAINT TO OFFRS ACCN AT CME UNDER GE (CME) KHADKI
2025_MES_745671_1
8675/E8
Open Tender
Civil Works
Item Rate
210 days
Garrison Engineer (CME) Khadki, Phugewadi, Dapodi
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Garrison Engineer (CME) Khadki
₹90,000
Yes
22 Jan 2026
22 Dec 2025
14 Jan 2026
22 Dec 2025
12 Jan 2026
6 Jan 2026
23 Dec 2025 - 5 Jan 2026
M & L for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss effloerent salts and treading oil and greasy spots and applying one coat of white (lime) wash complete all as specified and directed by Engineer-in-Charge
All as specified in Item No 1 above but applying one coat of white wash on ceiling.
All as specified in item No 1 above but applying one coat of Oil Bound distemper on walls complete
M & L for complete scraping down of old decorative surface of walls with steel wire brushes of smoke spots, moulds, moss efflorecent salts and applying two coats of Oil bound distemper over layer of 1.5 mm Thick wall care putty all as specified and directed by Engineer-in-Charge.
M & L for preparation of old surface of ceiling and applying one coat of oil bound distemper complete all as specified and directed.
M & L for one coat of synthetic enamel paint over wooden surfaces including preparation of old surfaces over 10cm width or girth all as specified and directed
M & L for painting one coat synthetic enamel paint on steel surface including preparation of old surface of any description , over 10 cm width or girth not otherwise described all as specified and directed
Taking down cement plaster on brick or stone walls or concrete surface etc including raking out joints, hacking for key scrubbing down with water all as specified and directed.
M&L 10 mm thick cement plastering on brick /concrete surfaces in CM (1:4) finishing surfaces even and fair without using extra cement over and including 10mm thick dubbing out on irregular face of wall in CM 1: 6 of any description complete all as specified.
M&L preparing newly plastered surfaces of wall and applying complete wall with 2mm POP/Birla putty and making smooth surfaces and applying two coats of Oil bound distemper over a coat of primer all as specified and directed by Engineer-in-Charge.
M&L rendering 5mm thick on concrete surfaces in CM 1:3 on ceiling, finished even and smooth with sagol all as specified and directed.
M&L for preparation of newly plastered surfaces ceiling and applying complete ceiling with 2 mm POP/Birla putty and making smooth surface and applying three coats of white wash over POP/Birla putty all as specified and directed.
S&F in repair stainless Steel Wire Cloth, 0.36mm nominal dia of Wire and average width of aperture 1.4 mm and fixed with Tinned Tacks of Mild Steel Wire Stapes, fixing and repair etc, complete all as specified and as directed.
M&L cover fillet (lipping) of tempered hard board 40mm wide, 6mm thick and fixing with screw complete all as specified and directed.
M&L for plain fillets,square, rectangular or triangular in section, clean sawn, secured with nails or brads, exc 13 & n. exc 25 sq. cm second class H/W complete all as specified
S&F fixed in repairs aluminium sheet 0.56 mm th fixed to door shutters with nails all as specified and directed
S&F in repair curtain rods, 25mm dia, rails, mild steel, chromium plated incl fixing brackets, stops, rollers etc.
M & L for Cleaning of shrubs growth on bldgs wall, chajja, and making good the damaged protion in CM 1:3 and match the existing surface complete all as specified and as directed.
M & L for jet washing (90 to 150 bars as required) rubbing down and stopping of old paint and scales over surfaces and applying two coats of 100% premium acrylic emulsion paint ( Apex ultima or equivalent) having voc less than 50 gm/litre and UV resistance as per IS 15489 : 2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/10 Sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 Sqm over old and new surfaces. Note :- 1. Tri party MOU shall be signed between MES, contractor and paint manufacturing company for pre , during an post work completion site inspetion. 2. The quantity compress for Bldg of height upto G+4 and over head reservior of any height and capacity incl required necessary scaffolding and safety precaution.
M & L for preparation of old surfaces and applying one coats of 100% premium acrylic emulsion paint ( Apex ultima or equivalent) having voc less than 50 gm/litre and UV resistance as per IS 15489 : 2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/10 Sqm over complete all as specified and directed
(Applicable for above all items) (a) Contrator has to employ skilled/unskilled tradesman with adequate experience & required documents to be submitted to office , The rate shall be quotted by the contractor including scaffolding to carry out the work for height more than 10.00 mtrs. ( For item No 1 to 21 ) (b). Labour should wear contractors uniform with firm logo, failing which recovery should be made. (c). Contractor has to complete welcome maints in all aspects witin time limit as per Officer Quarter allotment letter, failing which recovery will be initiated (d). Minimum of 02 x teams of each trades shall be available for maint of urgent nature whenever called upon of any trade, failing which recovery will be initiated for not employing adequate labour at site. (e) Site clearance shall be done by contractor after finishing work.
(f) All Scarps will be done with mechanical scaper (g) Mechanical scaper should be deposit in our store at the time of sample approval (h) The rates includes (Ser No 1 to 3 and 5) (i) Contractor has to procure and deposit total quantity of material as per manufacturer instruction and sample approved by GE, the quantity of material calculated as per CA is then kept under the safe custody of Engr In charge. (j) 2 mm thick POP/Birla putty shall be done by contractor whereever reqd and as directed by Engr-in-Charge
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_834959.xls
BOQ • 0.40 MB
8675TENDER.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .