Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.0 LAccepted-AOC 119 120 120A ELECTRICAL ELECTRONICS INDUSTRIAL ESTATE PERUNGUDI CHENNAI KANCHEEPURAM INDIA | L1 | Accepted-AOC L1 | |
| 2 | L2₹91.8 L+₹47.0 L (104.7%)Rejected-AOC BENGALURU KARNATAKA | BENGALURU | KARNATAKA | L2 | Rejected-AOC L2 | |
| 3 | L3₹60.9 L+₹16.0 L (35.7%)Rejected-AOC B 14 1 GIDC ELECTRONIC ZONE SECTOR 25 GHANDINAGAR 382 044 | GHANDINAGAR | GANDHINAGAR | GUJARAT | 382044 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical BEGUSARAI | KHAGARIA | BIHAR | 848201 | - | Rejected-Technical IOCL WOs 24287249 and 24287249 dtd 05.11.2014 submitted with completion in Mar 15 as per SAP. The above WOs are not considered for evaluation as the orders were not executed in the last 5 years as per tender conditions, hence technically rejected. |
Tender Value
Refer Docs
EMD Value
₹69,162
Closing Date
11 Sept 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM MATERIALS
Bongaigaon Refinery, Assam
Supply, Installation, Testing and Commissioning of UPS and PWCAMC Charges for three years with buy back option
2020_BGR_121537_1
E6SG20028
Open Tender
Electrical - All
Supply
180 days
Bongaigaon Refinery
Please refer Tender documents.
6 documents required · 6 mandatory
₹69,162
Yes
22 Jan 2021
6 Aug 2020
12 Sept 2020
6 Aug 2020
11 Sept 2020
7 Aug 2020
120 days
Amount
List of item(s) / work(s) as per tender documents
Supply of the following 3 Nos. of Uninterruptible Power System (UPS) Panels to Bongaigaon refinery including its Testing and Commissioning along with supervision of installation of all UPS & allied equipments as per technical terms and conditions mentioned in tender document: ITEM 10.10 - 2X25 KVA Parallel redundant UPS for STG DAVR without Battery bank and ACDB (Buy-back - applicable) ITEM 10.20 - 2X15 KVA Parallel redundant UPS for N2 PLANT without Battery bank and ACDB (Buy-back - applicable) ITEM 10.30 - 2X25 KVA Parallel redundant UPS for S/S-31 with Ni-Cd Battery bank and ACDB (Buy-back - NOT applicable)
Post Warranty Non-comprehensive AMC of 3 Nos. above UPS Systems FOR A PERIOD OF THREE YEARS as per detailed scope of work mentioned in Annexure- 1, 10, 11 & 12 of tender document
Noncmp AMC 2nos. 25KVA UPS for 1st year
Noncmp AMC 2nos. 25KVA UPS for 2nd year
Noncmp AMC 2nos. 25KVA UPS for 3rd year
Noncmp AMC 1no. 15KVA UPS for 1st year
Noncmp AMC 1no. 15KVA UPS for 2nd year
Noncmp AMC 1no. 15KVA UPS for 3rd year
Buy back of existing UPS System
Hitachi Hirel Power Electronics Pvt. Ltd.
DUBAS ENGINEERING PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .