| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance | ₹14.8 L | L1 | Accepted-Finance Accepted due to lowest rate |
| 2 | L2₹15.4 LRejected-Finance | ₹15.4 L | L2 | Rejected-Finance being high rate |
| 3 | L3₹16.1 LRejected-Finance | ₹16.1 L | L3 | Rejected-Finance being high rate |
| 4 | L4₹17.3 LRejected-Finance | ₹17.3 L | L4 | Rejected-Finance being high rate |
| 5 | L5₹17.4 LRejected-Finance 596 549 ADARSH NAGAR MALPUR LUCKNOW U P | LUCKNOW | UTTAR PRADESH | 226001 | ₹17.4 L | L5 | Rejected-Finance being high rate |
Tender Value
₹23.9 L
EMD Value
₹2.4 L
Closing Date
27 Mar 2026, 12:00 pmClosed
E.E. Maintenance Division No 1(Civil), PWD, Lko
OFFICE OF Executive Engineer, Maintenance Division No.-1 (Civil), PWD, Lucknow
Repair painting and other civil works of the outer surface of the Research building located in the E.N.C office
2026_PWDBL_1128786_1
631/Tender Notice/2026 Date. 19.03.2026
Open Tender
Civil Works - Buildings
180 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.4 L
Yes
E.E. Maintenance Division No 1(Civil), PWD, Lko
15 Apr 2026
21 Mar 2026
27 Mar 2026
21 Mar 2026
27 Mar 2026
21 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and fixing double scaffolding system (cup lock type) on the exterior side up to seven story height made with 40 mm dia M.S. tubes 1.5 m centre to centre, horizontal & vertical tubes jointing with cup & lock system with M.S. tube challies M.S. clamps and M.S. staircase system in the scafolding for working plateform etc. And maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracing, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational aria of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing iten to be done.(DSR No-14.72) | |||||
| 2Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. Complete. (DSR- 13.88) | |||||
| 3Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.CH-17, (DSR-15.56) | |||||
| 4Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (DSR- 13.80) | |||||
| 5Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface (DSR No. 13.111.1) | |||||
| 6Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work (DSR- 13.99.1) | |||||
| 7Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. (DSR- 15.3) | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. (DSR- 5.9.3) | |||||
| 915mm cement plaster on rough side of single of half brick wall mix: 1:4 (1 cement : 4 coarse sand) (DSR No-13.5.1) | |||||
| 10Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chanas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources. (DSR- 5.3) | |||||
stage.html
html • 0.04 MB
techsummary_2105318.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
T1.pdf
Tender Documents • 0.96 MB
BOQ_2105318.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid