Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance MADHUBAN PO PARADIP DIST JAGATSINGHPUR 754 142 ODISHA | JAGATSINGHAPUR | ODISHA | 754142 | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹3.1 L (2.63%)Admitted-Finance | ₹1.2 Cr+₹3.1 L (2.63%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹6.0 L (5.17%)Admitted-Finance | ₹1.2 Cr+₹6.0 L (5.17%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹6.6 L (5.68%)Admitted-Finance | ₹1.2 Cr+₹6.6 L (5.68%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹8.7 L (7.48%)Admitted-Finance | ₹1.3 Cr+₹8.7 L (7.48%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUSANTA KUMAR SWAIN L12 | M/s.SAI SHREYASI CONSTRUCTION L11 | Gyana Ranjan Mohanty L9 | SM ENTERPRISES L3 | Ms Gangadhar Jena L13 | Aakar Engineers and Contractors L15 | M/S BHAIRAB CHARAN SWAIN L5 | Padmanav Lenka L6 | JISHU KRISHNA NAYAK L2 | M/S TRIBHUBAN DAS L1 | Kulamani Nayak L4 | M/s. P N Construction L7 | SUBRAT KUMAR BEHURA L10 | LAXMIDHAR ROUT L14 | Gyan Ranjan Swain L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, tollage etc. complete but excluding GST as directed by the Engineer-In-Charge. | 6,612 | Each Sqm | 100 ₹6,61,200 | 1.5 ₹9,918 | 2 ₹13,224 | 2 ₹13,224 | 2 ₹13,224 | 8 ₹52,896 | 1.1 ₹7,273.2 | 10 ₹66,120 | 1 ₹6,612 Lowest | 1 ₹6,612 Lowest | 1.39 ₹9,190.68 | 15 ₹99,180 | 10 ₹66,120 | 61.2 ₹4,04,654.4 | 10 ₹66,120 |
| 2.00 | Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 189 | Each Cum | 200 ₹37,800 | 150 ₹28,350 | 180 ₹34,020 | 100 ₹18,900 | 200 ₹37,800 | 200 ₹37,800 | 48 ₹9,072 Lowest | 100 ₹18,900 | 92 ₹17,388 | 100 ₹18,900 | 169 ₹31,941 | 100 ₹18,900 | 160 ₹30,240 | 306 ₹57,834 | 100 ₹18,900 |
| 3.00 | Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer Not exceed 1mtr. compacting with VRR to achive OMC etc all complete including Supply of all material , labour , T&P, hire and running charge of equipment , taxes ,tollage etc all complete but excluding GST. as directed by EIC.
NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity. | 14,546.4 | Each Cum | 290 ₹42,18,456 | 350 ₹50,91,240 | 310 ₹45,09,384 | 348 ₹50,62,147.2 | 350 ₹50,91,240 | 400 ₹58,18,560 | 290 ₹42,18,456 | 340 ₹49,45,776 | 340 ₹49,45,776 | 225 ₹32,72,940 Lowest | 267 ₹38,83,888.8 | 225 ₹32,72,940 Lowest | 250 ₹36,36,600 | 405 ₹58,91,292 | 340 ₹49,45,776 |
| 4.00 | Providing & laying quarry dust of aprroved quality as sub-base in layers watering and compacting to the required density in O.M.C with Vibratory Roller with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC . | 729.6 | Each Cum | 1,200 ₹8,75,520 | 1,250 ₹9,12,000 | 1,300 ₹9,48,480 | 975 ₹7,11,360 | 1,200 ₹8,75,520 | 1,960 ₹14,30,016 | 1,150 ₹8,39,040 | 1,050 ₹7,66,080 | 890 ₹6,49,344 | 1,300 ₹9,48,480 | 1,136 ₹8,28,825.6 | 1,200 ₹8,75,520 | 1,580 ₹11,52,768 | 1,620 ₹11,81,952 | 800 ₹5,83,680 Lowest |
| 5.00 | Providing, laying, spreading and compacting stone aggregates of IRC Gr-I(90 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC . | 1,094.4 | Each Cum | 2,000 ₹21,88,800 | 2,000 ₹21,88,800 | 2,200 ₹24,07,680 | 2,120 ₹23,20,128 | 2,500 ₹27,36,000 | 2,000 ₹21,88,800 | 2,280 ₹24,95,232 | 2,025 ₹22,16,160 | 2,100 ₹22,98,240 | 2,200 ₹24,07,680 | 2,235 ₹24,45,984 | 2,250 ₹24,62,400 | 2,400 ₹26,26,560 | 1,530 ₹16,74,432 Lowest | 2,100 ₹22,98,240 |
| 6.00 | Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(53 mm to 22.4 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC . | 1,094.4 | Each Sqm | 2,150 ₹23,52,960 | 2,200 ₹24,07,680 | 2,300 ₹25,17,120 | 2,130 ₹23,31,072 | 2,600 ₹28,45,440 | 2,000 ₹21,88,800 | 2,280 ₹24,95,232 | 2,025 ₹22,16,160 | 2,150 ₹23,52,960 | 2,300 ₹25,17,120 | 2,669 ₹29,20,953.6 | 2,450 ₹26,81,280 | 2,500 ₹27,36,000 | 1,530 ₹16,74,432 Lowest | 2,200 ₹24,07,680 |
| 7.00 | Providing & laying of moorum of approved as surface course, watering and compacting with PRR, lifting from stack with supply of all material, labour , T&P, hire and running charge of Equipments, transporatation, taxes ,tollage etc all complete but excluding GST.as directed by EIC. | 360 | Each Cum | 1,150 ₹4,14,000 | 1,100 ₹3,96,000 | 1,100 ₹3,96,000 | 850 ₹3,06,000 | 1,200 ₹4,32,000 | 740 ₹2,66,400 Lowest | 1,350 ₹4,86,000 | 1,600 ₹5,76,000 | 750 ₹2,70,000 | 1,100 ₹3,96,000 | 995 ₹3,58,200 | 2,700 ₹9,72,000 | 1,300 ₹4,68,000 | 1,800 ₹6,48,000 | 1,200 ₹4,32,000 |
| 8.00 | P.C.C(1:3:6) of using 20mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge. | 18 | Each Cum | 5,000 ₹90,000 | 4,800 ₹86,400 | 3,800 ₹68,400 | 3,500 ₹63,000 | 3,000 ₹54,000 Lowest | 5,600 ₹1,00,800 | 5,500 ₹99,000 | 3,500 ₹63,000 | 3,000 ₹54,000 Lowest | 4,500 ₹81,000 | 4,500 ₹81,000 | 4,500 ₹81,000 | 4,700 ₹84,600 | 6,300 ₹1,13,400 | 4,000 ₹72,000 |
| 9.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | 106 | Each Cum | 7,500 ₹7,95,000 | 5,800 ₹6,14,800 | 4,800 ₹5,08,800 | 5,200 ₹5,51,200 | 4,000 ₹4,24,000 Lowest | 7,500 ₹7,95,000 | 6,000 ₹6,36,000 | 5,000 ₹5,30,000 | 5,100 ₹5,40,600 | 7,500 ₹7,95,000 | 6,100 ₹6,46,600 | 6,500 ₹6,89,000 | 5,700 ₹6,04,200 | 7,200 ₹7,63,200 | 5,500 ₹5,83,000 |
| 10.00 | Supply Tor/TMT steel manufactured by SAIL/TISCON/ VIZaG Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour,materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient. | 128 | Each Qntl | 11,900 ₹15,23,200 | 7,000 ₹8,96,000 | 8,000 ₹10,24,000 | 5,600 ₹7,16,800 | 7,800 ₹9,98,400 | 8,800 ₹11,26,400 | 8,100 ₹10,36,800 | 7,000 ₹8,96,000 | 5,300 ₹6,78,400 Lowest | 8,000 ₹10,24,000 | 7,250 ₹9,28,000 | 7,500 ₹9,60,000 | 9,000 ₹11,52,000 | 8,100 ₹10,36,800 | 7,000 ₹8,96,000 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
31 Mar 2023, 5:15 pmClosed
B. Pradhan,EE, HWD-II,PPA
Office of the Harbour Works Division-II, Engineering Department, Paradip Port Authority First Floor, Administrative Building, Tele-06722-223001
Development of new plot behind CISF Office near Gate no.2 inside Harbour area.
2023_MoS_744635_1
CE/HW-II-W-04/23/54
Open Tender
Civil Works
Works
180 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD.
₹3.3 L
Yes
9 May 2023
10 Mar 2023
3 Apr 2023
10 Mar 2023
31 Mar 2023
10 Mar 2023
Amount
Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, tollage etc. complete but excluding GST as directed by the Engineer-In-Charge.
Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer Not exceed 1mtr. compacting with VRR to achive OMC etc all complete including Supply of all material , labour , T&P, hire and running charge of equipment , taxes ,tollage etc all complete but excluding GST. as directed by EIC. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity.
Providing & laying quarry dust of aprroved quality as sub-base in layers watering and compacting to the required density in O.M.C with Vibratory Roller with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC .
Providing, laying, spreading and compacting stone aggregates of IRC Gr-I(90 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC .
Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(53 mm to 22.4 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC .
Providing & laying of moorum of approved as surface course, watering and compacting with PRR, lifting from stack with supply of all material, labour , T&P, hire and running charge of Equipments, transporatation, taxes ,tollage etc all complete but excluding GST.as directed by EIC.
P.C.C(1:3:6) of using 20mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge.
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
Supply Tor/TMT steel manufactured by SAIL/TISCON/ VIZaG Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour,materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge
Engagement pay loader/ dozer for demolishing of existing damaged Building and disposal off the debris in the low laying areaand stacking the useful material and depositing the same in Central Store,PPA with hire and running charges, operator expenses,fuel,lubricants with all materials, labour, T&P, taxes, transportation charges, staging, scaffoldin but excluding GST etc all complete and as per direction of Engineer-in-charge. NB-No idle Charges shall be paid.
JISHU KRISHNA NAYAK
SM ENTERPRISES
Kulamani Nayak
M/S BHAIRAB CHARAN SWAIN
Padmanav Lenka
M/s. P N Construction
Gyan Ranjan Swain
Gyana Ranjan Mohanty
SUBRAT KUMAR BEHURA
M/s.SAI SHREYASI CONSTRUCTION
SUSANTA KUMAR SWAIN
Ms Gangadhar Jena
LAXMIDHAR ROUT
Aakar Engineers and Contractors
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_782938.xls
BOQ • 0.28 MB
T_Dev.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .