Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.3 Cr+₹12.6 L (10.8%)Rejected-Finance 102 1 SN BANERJEE ROAD KOLKATA 700014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | L2 | Rejected-Finance Quoted rate higher than L1 | |
| 3 | L3₹1.5 Cr+₹30.9 L (26.4%)Rejected-Finance | L3 | Rejected-Finance Quoted rate higher than L1 |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
11 Mar 2021, 2:00 pmClosed
Executive Engineer, Howrah Division, PWD
Howrah Division, PWD, Onkermal Jetia Road, Howrah 711 103
Cons of temp Pandal, temp strucs and other infrastl arrang including supply of diff decor items in c/w WBLAE 2021 for 174 Sankrail A.C at Seacom Engg College Sankrail and for 175 Panchla AC at Nayachak Jadunath High School Panchla How during 20_21
2021_WBPWD_329913_6
WBPWD/EE/HD/NIeQ3/2020-21
Open Tender
CIVIL WORKS
Item Rate
10 days
Howrah
Please refer Tender documents.
4 documents required · 4 mandatory
₹70,000
1 Sept 2021
5 Mar 2021
13 Mar 2021
6 Mar 2021
11 Mar 2021
6 Mar 2021
Amount
Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah and bamboo using alternatively post as per direction including maintenance as required (upto 12'0" minimum. ht.) roof should be projected upto 2'0" from all walling for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C including restoration of damages of the ground to its original condition as per direction of E.I.C after removing the shed. (measurement will be made as per floor area).
For additional holding beyond 7 days
Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 12'0" ht. Minimum.) as per direction. Roof should be projected upto 2'0" from all walling for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C including restoration of damages of the ground to its original condition as per direction of E.I.C after removing the shed. (Payment will be made as per floor area). (Payment will be made as per floor area).
For additional holding beyond 7 days
Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete.for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective walling area).
For additional holding beyond 7 days
Inside walling and ceiling with clean white or different colour for different A.C washed cloth with bamboo/ sal framing and post complete (Restricted item) for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective walling area).
Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0" to 10'0" ht.) for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective length).
For additional holding beyond 7 days
Fitting, fixing in position of collapsible gate (on hire basis) for any hight as per direction. (Payment will be made as per opening length) minimum 15 days holding period after completion of the workfor a period work to the satisfaction of E.I.C.
For additional holding beyond 15 days
Hire and labour charges for bamboo barricading with sal post of 4" dia @4' c/c including necessary frame works complete upto 3'0" to 4'0" hight with 3 rows.for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective length).
For additional holding beyond 7 days
Making of wooden platform upto 3'-0" ht. including supply of wooden planks and necessary frame works with post (2ft centre to centre) as per direction (Restricted item) for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective area).
Supplying and laying of tarpaulin (on hire basis) as per direction.for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective area).
Supplying and laying of Carpet (good quality on hire basis) as per direction.for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective area).
Making of square or hexagonal mesh netting with wooden frame and bamboo / wooden post as per direction upto 9'0" ht.for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective length).
For additional holding beyond 7 days
Gap covering with wooden planks including framing works complete as per direction for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Making of watch tower at counting venues as per drawing attached with all materials and labour complete for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
Making and fixing in position of door/window curtain (on hire basis) for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective no).
For additional holding beyond 7 days
Making of EVM racks for width 2'-6" x 2'-6" (3 tier rack system) centre to centre vertical post , runner, plank as per direction by E.I.C including hiring charges of local woods supplying of all other necessary materials and labour complete for a period minimum 15 days holding period after completion of the workto the satisfaction of E.I.C (Payment will be made as per effective length).
For additional holding beyond 15 days
Making kuccha drain of 12" width 24" depth in any place as per requirement as directed by the E.I.C. & maintaining for a period minimum 7days including restoration of damages of the ground to its original condition as per direction of E.I.C (Payment will be made as per effective length).
Hire and labour charges for providing 'Drop Gate' with 15cm Dia. salbullah of length not less than 8 mtr. including hoisting and fitting fixing with bolts and nuts to vertical post (100 mm dia 2 nos. of each flank embedded 750 mm below ground level) and providing counter load of concrete or stone or iron block at the fulcrum end including painting 2 coats in alternate band providing 'stop' plate, jute rope of necessary length etc. complete including dismantling and remove as per direction.for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective no).
For additional holding beyond 7 days
Making of display board with local wood and ply board of size 4'-0" x 3'-0" with display matters.
With Stand for a period minimum 15 days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective no).
For additional holding beyond 15 days
Without Stand for a period minimum 15 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 15 days
Hire charges of wooden table on hire basis of size 5'-0" x 3'-0" for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of wooden table on hire basis of size 4'-0" x 2'-6" for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of wooden table on hire basis of size 3'-0" x 2'-6" for a period minimum 15days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective no).
For additional holding beyond 15 days
Hire charges of Row table with sun mica top of 6'-0" length on hire basis for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective walling area).
For additional holding beyond 7 days
Hire charges of Cushion chair for a period minimum 15 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
Hire charges of Garden chair for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
Hire charges of Polythene chair for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of Sataranchi (Dori) on hire basis on standard size 15'-0"x12'-0".for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of clean and washed Polythene drum with cover for drinking water for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of Polythene jug for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of Polythene glass for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of single Sofa for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of double Sofa for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of Centre table of standard size for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of folding cot with bed roll on hire basis for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of clean white table cloth for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of Ceramic flower vase for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of wooden low bench for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of plastic bucket with lid for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of bed roll with toshak, pillow and bed sheet for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Hire charges of big size polythene drum for making waste paper basket for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
For additional holding beyond 7 days
Construction of temporary Booth covered with waterproof tarpaulin/ corroguted (G.C.I.) shed with over roof with strong bamboo/sal bullah frame resting over strong sal bullah post including necessary lighting arrangement etc. as per direction of E.I.C. for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C. (Payment will be made as per effective area). [ List of Booths are Annexed]
Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed. (Specific permission of Engineer-in-Charge priorto execution will be necessary). (Payment to be made on area cleared)
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges,complete including cost of sand and gunny bags.
Supplying labours for the cleaning the inside the Building, shifting of all materials & other works as per direction maintaining minimum wages to the labour as per the existing labour act. (Labours to be engaged as when necessary)
Making of wooden/steel platform upto 15'-0" ht. including supply of wooden planks and necessary frame works with using approved stout props/ sal bullah with wooden planks / ply wood / steel sheet plate post as per direction (Restricted item) for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective area).
Hire charges of alluminium / wooden step ladder with dimention open - length : 19.5" width: 50" hight : 72" close length: 19.5" with 6 steps for carring capacity 150kg for a period minimum 7 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
Hire charges of white board of size 3' x 4'(magnetic) with marker as per requirement by occupying department for a period minimum 7days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
Making & fixing of tower for lighting arrangement upto height 25' from ground level at diffrent location as per requirement occupying department and as per direction of electrical department including with all materials and labour complete.for a period minimum 15 days holding period after completion of the work to the satisfaction of E.I.C (Payment will be made as per effective no).
Hire & Labour charges for view cutter made with tarpulin or cloth on 3/4 " plywood panel/ rope pully/ motor drive etc. fitted on 80 mm dia bamboo railing on jhaubullah / eucalyptus bullah post 1.40 m above G.L. & 60 mm below G.L. tied strongly with bamboo railing with coir rope digging hole for posts in any sort of soil at 1.80 m apart including the cost of all matriels and Labour complete including the cost of restoration of the ground as per direction of the Engineer - In - Charge.
For additional holding beyond 7 days
The Holy Decorators
M/S DAW AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .