Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹2.3 L+₹1.2 L (110.2%)Accepted-Finance 146 4 NEW PRABHAT NAGAR JAIL CHUNGI MEERUT | L2 | Accepted-Finance Qualified |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
22 Nov 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EUDC-3 GZB
SE EUDC 3 GANDHI NAGAR GZB
Work for Replacement of PCC Pole/ST Pole and Erection of Tilted Pole UNDER EUDD-VII, GHAZIABAD in the jurisdiction of SE, EUDC-III Ghaziabad.
2021_PVVNL_638366_1
13/W/2021-22/EUDD-7/EUDC-3 GZB
Open Tender
Electrical Works
Item Rate
90 days
SE EUDC 3 GANDHI NAGAR GZB
Plz Refer Tender doc
2 documents required · 2 mandatory
₹1,180
SE EUDC-3 GZB
₹2,000
29 Nov 2021
30 Oct 2021
22 Nov 2021
30 Oct 2021
22 Nov 2021
30 Oct 2021
120 days
Amount
Removing of HT/LT Line span dog/weasel conductor on damaged PCC/ST Pole after opening of all connection & binding on insulator.
Dismantling of damaged PCC/ST Pole after removing of all fitting on pole and shifting of damaged pole newly site.
ST POLE
PCC Pole
Cartage of ST/PCC Pole from store center /JE store to site including loading and unloading at both site.
ST POLE
PCC Pole
Errection of ST/PCC Pole after digging of pits in proper size and fixing of all fitting on pole properly as per norms.
Re sagging of HT/LT Line span dog/weasel conductor on PCC/ST Pole and re-jumper & rebinding on insulator & re connection of all connection on pole properly.
Cartage of damaged ST pole from site to JE store including loading and unloading at both side.
Straitening of tilted pole ST/PCC pole after dismantling of all binding of pole and conductor relaying of conductor and rebinding on pole properly.
Grouting of stay set after digging of pits in proper size and grouting in ratio 1:4:8 with cement sand and concrete as norms of Nigam complete work in all respect as per RESPO norms.
Chopping & cutting of trees branches (in a span) touching near 11 KV & LT line to avoiding frequent breakdown & tripping for proper clearance and proper maintenance of line LT/HT Line for uninterrupted & smooth supply to the consumer
Re sagging of LT/HT line loose span conductor to avoid any B/D in this line and uninterrupted supply to the consumer properly after opening of all binding and jumper on insulator and all consumer connection. Relaying and stringing and proper sagging of LT/HT line conductors and making of all jumper and connection existing LT/HT line properly
Providing and fixing MS pole clamp for ST/PCC pole
Om Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .