| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.3 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹52.9 L+₹13.6 L (34.6%)Rejected-Finance | 2 | Rejected-Finance Reject |
Tender Value
₹40.2 L
EMD Value
₹80,436
Closing Date
25 Apr 2024, 11:00 amClosed
Executive Engineer (Electrical)
Paryatan Bhavan Panaji
Provision of Election Infrastructure Setup at Damodar College Margao for Election Infrastructure SH Providing of CCTV Surveillance Data Telephone and PA system
2024_GTDCL_15521_1
GTDC/PC/EE(E)/2024-25/e-02
Limited
Security System
Works
10 days
damdodar college margao
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,000
₹80,436
9 May 2024
22 Apr 2024
25 Apr 2024
22 Apr 2024
25 Apr 2024
22 Apr 2024
Amount
Supply, Installation, Testing and Commissioning after 4th June of 1000 VA UPS WITH INTERNAL BATTERIES - 7 AH -2 NOS NOS TO GIVE 20 MINS BACKUP.make FUJI ELECTRIC / VERTIC as required as directed by Engineer in-charge
Carrying out Servicing of DG set from 250 kVA with AMF Panel of make- Koel Green manufactured by Kala Geneset Pvt. Ltd.Model No-KGI.250 W52 to ensure smooth running of DG set for 30 mins. Checking for abnormal sound and leakages, Carry out visual inspection of all moving parts, oil levels, oil filters, fuel filters, air filters and clean them properly, rectify the minor leakages if any. Inspect alternator, stator and rotor for normal speed & proper frequency, Examine battery charging with monitoring system and recording voltages, checking battery cells gravity and topping up with Distilled water, Checking V belts with necessary adjustment, Checking and retightening of nut bolts including coupling bolts of engine and alternator, Checking & cleaning of radiator and leakage testing Checking of radiator & fuel supply hose pipes, Checking of AVR, excitation diodes, its connections confirming proper output voltage. Checking & resetting of valve tappets, Cleaning of DG set internally using blower, cleaning radiator, and Submit the servicing report to engineer in charge.(Non Comprehensive) as per specification.
Supply, Installation, Testing and commissioning of of 0.5 HP pump for filling diesel. Make kirloskar/ Koyal green as required as directed by Engineer in-charge
Supply installation testing and commission of extension board 4 Way 6A Socket with Single Switch , 4 Way Extension Board with 5Mtr Extension Cord,Multi Plug Socket for Home Wall, Office Laptop (22047)
Procurment and Filling of 400 ltrs of diesel in 250kva Diesel generator located at Damodar college of Commerce and Arts from nearby petrol pump in Margao by arranging transport and barrel of 230ltrs for storing diesel.
Supply, Installation, Testing, commissioning and dismantaling after 4th June of LED video walls of size 2.5mtr x 2 mtr on rent for 2 days. as required as directed by Engineer in-charge. Make LG/VU/Samsung.
Supply, Installation, Testing, commissioning and Dismantaling of Smart Television of 55 inches with floor mounted stand on rent for 2 days as required as directed by engineer in - charge.Make LG/VU/ Samsung.
Supply, installation, Testing, Commissioning & dismantling after 4th June of 6U Rack of Dimension of 300x600x400mm, including installaion of Switches and CAT6 Cables, terminations, required accessories, PDU, and UPS complete as required as directed by Engineer Incharge of Make Dlink/Netrack/Valrack.
Supply, installation & dismantling after 4th June of 22U Floor Rack of Dimension of 1200x600x800mm, including installaion of Switches, NVR, OFC and Cat6Cables for Terminations, Included Accessories, PDU, and UPS complete as required as directed by Engineer in-charge. Make Dlink/Netrack/Valrack.
Supply, installation & dismantling after 4th June of NVR with 64 Channel havng capacity of 30 days Recording, 8 fps, 24 hour by 30 days, complete as required as directed by Engineer In-charge Make: CP Plus/Hikvision/Dahua/TP Link.
Supply, installation, testing, commissioning and dismantling after 4th June of Fixed Box Camera (outdoor/Indoor), 1/4" or 1/3" interlaced / progressive (CCD / CMOS), Resolustion 1280 x 720 , 0.5 Lux color/ 0.5 Lux mono, verifocal lense 5-50-mm 4x digital zoom and H.264 video compression standards, 25 fps frame rate under high motion, operating temperature -10°C to +60°C, 12V/24V AC/DC as per the specifications compelete with mounting and all accessories including Junction Box and Protection Devices complete in all respect. All outdoor devices shall be as per IP 66 protection. The cost include the cost of power supply as required. (Note:- Camera type will be confirm by client). As required as directed by engineer in- charge. Make CP Plus/Hikvision/Dahua/TP Link
Supply and installation testing, commissioning and dismantling after 4th June of 24 Port Core Switch L3 switch with all accessories in complete.Three hot-swappable fan trays with airflow control provide N+1 cooling redundancy Attain up to 480G stacking bandwidth with four devices functioning together as one/Three Color Marker/Congestion Control complete as required as directed by Engineer In-charge. Make: Dlink/Digisol/TP Link
Supply, installation, Testing, Commissioning & dismantling after 4th June of HDD no Raid For 30 Days of Continious Recording as required as directed by the engineer in-charge. Make WD/Seagate/ Toshiba
Supply, Installation, Testing, commissioning and Dismantaling of Smart Television of 32 inches with floor mounted stand on rent for 2 days as required as directed by engineer in - charge.Make LG/VU/ Samsung.
Supply, laying & disassembly of 4 Core Outdoor OM3 Multimode Fiber Optic Cable as required as directed by the engineer in-charge. Make Dlink/Commscope/Digisol
Supply, Installation, Testing, Commissioning, Dismantaling and laying after 4th june of Cat - 6 UTP, 4 pair annealed tinned copper conductor PVC insulated, PVC sheathed, unarmoured data cable in existing surface/recessed steel/PVC conduit of appropriate size including connection, etc. complete as required Make Dlink/Commscope/Digisol
Supply, Installation, Testing Commissioning and dismantaling after 4th June of 55" LED TV as required as directed by the engineer in-charge. Make LG/VU/Samsung
Supply, installation, testing, commissioning and dismantaling after 4th June of EPABX System along with 30 nos analog phones all accessories in complete. For Internal Communincation between Floors as required as directed by the Engineer in- charge. Make Dinstar/Matrix
Supply, installation, testing, commissioning and dismantaling after 4th June of Microphone System along all accessories in complete. For Internal Communincation between Floors as required as directed by the Engineer in- charge. Make Ahuja/Yamaha/Matantz
Supply, installation, testing, commissioning and dismantaling after 4th June of Speakers for Announcement across the premises Professional 2-way speaker system with exceptional efficiency, long throw and unmatched intelligibility of sound. It consists of two 38.1cm (15”) high performance full range dual cone speakers and a High frequency compression driver. The speaker system is housed in an acoustically treated Bass Reflex Trapezoidal with durable paint finish enclosure. The cabinet has been fitted with heavy-duty handles to allow ease of transportation and a strong steel grille for speaker protection. Ideal for both indoor and outdoor sound reinforcement applications. Specially designed for Auditoriums and DJs. as required as directed by the Engineer in-chage. Make Ahuja/Yamaha/Matantz
Supply, installation, testing commissioningand dismantaling after 4th June of Speakers for Announcement across the premises 1000+1000 WATTS 8Ω : 400W + 400W RMS, 4Ω : 700W + 700W RMS, 2Ω : 1000W + 1000W RMS as required as directed by the Engineer in-chage. Make Ahuja/Yamaha/Matantz
Providing Internet connection of Gwave Enterprise, BSNL, ETHERNET OR equivalent for the period of 1 month at Damodar College Margao with 100 mbps speed.
Supply, Installation, Testing and Commissioning of Fire Extinguisher ABC type 4 kg as required as directed by the Engineer in-charge.
Supply, Installation, Testing and Commissioning of of Fire Extinguisher CO2 type 4.5 kg as required as directed by the Engineer in-charge.
Cost for scrapping Section A -Arrangement of Power Back up
Cost for scrapping Section-D Telephone System
Cost for scrapping Section-E Public Address System
Technology Inc
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .