Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 LRejected-AOC | ₹3.0 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-cancel |
| Sl No | Description | Qty | Unit | ABDUL HAKEEM L2 | DEVA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 13.35 | cum | 270 ₹3,604.50 | 250 ₹3,337.50 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.14 | cum | 5,550.44 ₹11,877.94 | 5,250.43 ₹11,235.92 |
| 3.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 20.13 | cum | 6,183.02 ₹1.2 L | 6,183.02 ₹1.2 L |
| 4.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 73.8 | cum | 547.5 ₹40,405.50 | 547.5 ₹40,405.50 |
| 5.00 | Supplying and fabricating and placing in position MS or RTS reinforcement works | 397.61 | sqm | 91.88 ₹36,532.41 | 91.88 ₹36,532.41 |
| 6.00 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly | 3.6 | sqm | 9,287.83 ₹33,436.19 | 9,287.83 ₹33,436.19 |
| 7.00 | GST 18% | 1 | No | 45,057.73 ₹45,057.73 | 44,894.11 ₹44,894.11 |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
5 Mar 2026, 3:00 pmClosed
The Block Development officer Arcot
The Block Development office Arcot
Construction of Culvert and Retaining wall at OHT tank JJ nagar Thennandhiyalam H/O Nandhiyalam Panchayat
2026_RDTN_667648_1
A1/1606/2022
Open Tender
Civil Works
30 days
The Block Development office Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
22 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete
Supplying and fabricating and placing in position MS or RTS reinforcement works
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_802069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_802069.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid