Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance NEAR BUS STAND UNCHAHAR RAEBARELI UP NEAR BUS STAND UNCHAHAR RAEBARELI UP NEAR BUS STAND UNCHAHAR RAEBARELI UP NEAR BUS STAND UNCHAHAR RAEBARELI UP | -21.56% | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹14,357 (4.16%)Admitted-Finance | -18.30% | ₹3.6 L+₹14,357 (4.16%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹42,498 (12.3%)Admitted-Finance | -11.91% | ₹3.9 L+₹42,498 (12.3%) | L3 | Admitted-Finance |
| 4 | L4₹4.1 L+₹61,039 (17.7%)Admitted-Finance 00 LALPUR KICHHA ROAD RUDRAPUR KICHHA RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263148 | UDAM SINGH NAGAR | UTTARAKHAND | 263148 | -7.70% | ₹4.1 L+₹61,039 (17.7%) | L4 | Admitted-Finance |
Tender Value
₹4.4 L
EMD Value
₹8,800
Closing Date
5 Jun 2026, 6:00 pmClosed
E.E. PWD City Dn - II,Jaipur
E.E. PWD City Dn - II,Jaipur
Replacement of Damaged Chajja and Strengthening of Damaged RCC Slab in Toilet in Sr Boys Hostel at SMS Medical College, Jaipur (Civil Work)
2026_CEPWD_562691_10
Nit No 01 of 2026-27 C-2
Open Tender
Civil Works - Buildings
Percentage
90 days
Under Jurisdiction of City Dn - II
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Through E-Grass Challan City Dn-II Office ID 9084
₹8,800
Yes
9 Jun 2026
27 May 2026
8 Jun 2026
27 May 2026
5 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Beldar | 20 | Day | 500 | ₹10,000 |
| 2 | Carriage of Material Building Rubbish Stone metal (Grit and ballast etc.) including loading and unloading with all lead | 20 | Cum | 240 | ₹4,800 |
| 3 | Grading roof for water proofing treatment with water proffing compound Cement mortar 1:3 (1 cement : 3 coarse sand) | 1.5 | Cum | 5,841 | ₹8,761.5 |
| 4 | Providing gola 75x75 mm in cement concretee 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | 40 | Mtr. | 111 | ₹4,440 |
| 5 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) | 85 | Sqm | 84 | ₹7,140 |
| 6 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding:
Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. | 30 | Sqm | 80 | ₹2,400 |
| 7 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision New Work | 85 | Sqm | 123 | ₹10,455 |
| 8 | Making holes in stone masonry wall upto 450 mm x 450 mm size and making good in CM 1:6. | 20 | Each | 182 | ₹3,640 |
| 9 | Providing and fixing double scaffolding system on the exterior side, upto five story made with 4" wooden member 1.5 m c/c horizontal and vertical direction joining with rassi, clamps, challies. The scaffolding system shall be stiffened with bracing, runner, connection of building if necessary with all essential safty features for the workmen etc complete as per direction of EI.The lavation area of the scaffolding shall be measured for payment. The payment will be made once irrespective of duration of scaffolding.
Note : This item to be used for maintence work judicially | 315 | Sqm. | 162 | ₹51,030 |
| 10 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-
i) Choping losse and cracked concretee to required depth, cleaning the exposed surface of steel and concretee with wire brush and sand papering , cleaning of concretee surface with water as necessary and getting dried.
ii) Applying Epoxy primer on the exposed steel bars.
iii) Applying Epoxy hardener and resin mix (as per manufectured's specification) on concretee and steel bars with brush.
iv) Spreading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.
v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.
vi) Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. | 30 | Sqm | 1,568 | ₹47,040 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.88 MB
Tendernotice_2.pdf
PDF • 3.22 MB
Tender_Document_01_10.pdf
Tender Documents • 7.59 MB
BOQ_1001369.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .