| 1 | L1₹5.8 CrAccepted-AOC D 123 SECTOR 7 NOIDA UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹5.8 Cr Quoted ₹5.9 Cr | L1 | Accepted-AOC Tender Allotted |
| 2 | L2₹6.5 Cr+₹58.5 L (9.90%)Rejected-AOC H NO 30 SECTOR 17 PANCHKULA 2022R6473 | PANCHKULA | PANCHKULA | HARYANA | 2022 | ₹6.5 Cr+₹58.5 L (9.90%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹6.8 Cr+₹88.5 L (15.0%)Rejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹6.8 Cr+₹88.5 L (15.0%) | L3 | Rejected-AOC 3rd Lowest |
| 4 | L4₹7.2 Cr+₹1.2 Cr (20.9%)Rejected-AOC 2 HOUSE NO 214 FRIENDS COLONY RAJIV NAGAR MANDI DABWALI 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | ₹7.2 Cr+₹1.2 Cr (20.9%) | L4 | Rejected-AOC 4th Lowest |
| 5 | Not Admitted-Fee/PreQual/Technical HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.0 Cr
EMD Value
₹12.1 L
Closing Date
1 May 2023, 5:00 pmClosed
DIPENDRA RAJ SINGH
EE PHE Division No. 2 Palwal (P)
Upgradation of existing 4.50 MLD STP based on MBBR technology with anoxic Tank, activated suldge tank i.e competion of tetiary treatement plant Hathin Distt. Palwal and all other works contingent thereto
2023_HRY_270102_1
202309DBBC1D 25AE 4A18 A745 A09E2A48EF96559PUH
Open Tender
Civil Works
Works
365 days
Hathin
As per approved DNIT
2 documents required · 2 mandatory
₹20,000
₹12.1 L
Yes
12 Sept 2023
31 Mar 2023
2 May 2023
31 Mar 2023
1 May 2023
31 Mar 2023
Amount
Up gradation and commissioning after conversion of existing 4.50 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Anoxic Tank, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set and transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Hathin town Distt. Palwal. (a) Entire Civil works as per DNIT (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
Up gradation and commissioning after conversion of existing 4.50 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Anoxic Tank, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set and transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Hathin town Distt. Palwal. (b) Entire mechanical, electric and instrumentation works as per DNIT – Existing mechanical equipment, Electric and instrumentation any other works contingent thereto (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
(c) Repair of existing structures (As per Annexure – I) (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
HL HANDA AND CO
RAJEEV KUMAR GOEL CONTRACTORS
M/s Sourabh Construction Pvt. Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .