| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAccepted-Finance 0 JANAI JANAI CHANDITALA HOOGHLY WEST BENGAL 712304 UDYAM WB 07 0059321 | HOOGHLY | WEST BENGAL | 712304 | ₹8.2 Cr | L1 | Accepted-Finance 1ST LOWEST |
| 2 | L2₹10.4 CrRejected-Finance GANESHUPUR 3RD GHERI KAKDWIP SOUTH 24 PARGANAS PIN 743347 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | ₹10.4 Cr | L2 | Rejected-Finance MORE THAN 1ST LOWEST |
| 3 | L3₹10.8 CrRejected-Finance | ₹10.8 Cr | L3 | Rejected-Finance MORE THAN 1ST LOWEST |
| 4 | L4₹10.9 CrRejected-Finance SAINPALA KHAN BAHADUR ROAD P O P S BASIRHAT NORTH 24 PARGANAS PIN 743411 | 24 PARAGANAS NORTH | WEST BENGAL | 743411 | ₹10.9 Cr | L4 | Rejected-Finance MORE THAN 1ST LOWEST |
Tender Value
₹8.7 Cr
EMD Value
₹10 L
Closing Date
28 Jan 2026, 3:00 pmClosed
SE/CTU
Central Tender Unit Jalasampad Bhawan, 8thFloor, Salt Lake, Kolkata-700091
Construction of Dwarf Embankment at Dussaspur circuit Embankment from ch. 28.00 Km to Ch. 30.25Km for a length of 2250 meter at Mouzas Daksin Dhankhal, Kirtibaspur, Poshtanka in BlockDaspur I, P.S Daspur and Dist. Paschim Medinipur in connection
2026_IWD_983561_2
WBIW/CTU/CE(SW) /e-NIT- 28 (e)/2025-26
Open Tender
CIVIL WORKS
730 days
Kirtibaspur
Please refer Tender documents.
6 documents required · 6 mandatory
₹10 L
Yes
Central Tender Unit Jalasampad Bhawan, 8thFloor, S
5 Mar 2026
7 Jan 2026
29 Jan 2026
7 Jan 2026
28 Jan 2026
7 Jan 2026
14 Jan 2026
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (i) With pumping out water including shoring as required.
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. Note: 1. Labour rate per m³ is provided; Cost of sand is to be added to arrive at the complete item rate.2. Compaction factor of dry clean sand is 0.835. Estimate Item Note: 1. Labour rate per m³ is provided; Cost of sand is to be added to arrive at the complete item rate.2. Compaction factor of dry clean sand is 0.835.
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Plain / Reinforced Cement Concrete in Open foundation with or without Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. a) Pakur Variety Note:1) For thin concrete members upto a thickness of 65mm involving shuttering and scaffolding rate of concrete enhanced by 150% of rate by volume (Cost of shuttering & reinforcement excluded). 2) For tall structure like overhead reservoir on R.C .frame, the ground floor equivalent height shall be taken as 4m. Every 4m or part there of above 4 m shall be taken as each additional floor for purpose of this item. 3) For item nos. 4(a), 5(i), 6(i), 7(i), 8, 9, 10(i), 12 to 21of subhead B construction wings to add cost & carriage (including loading & unloading) of Coarse Aggregate only to arrive at consolidated rate)
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel JSN/JSPL/SHYAM/SRMB/BMASL/ELECTROSTEEL/SSL
Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).) (a) Jhama ballast
Providing and laying pre-cast brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster , curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport. The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is1:4)
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. A) Beyond 500 metre and upto 1.00 km
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. B) Beyond 1.00 km and upto 2.00 km
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. C) Beyond 2.00 km and upto 3.00 km
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. D) Beyond 3.00 km and upto 4.00 km
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. E) Beyond 4.00 km and upto 5.00 km
Supplying & laying of bi-axial extruded high modulus polypropylene geogrid coforming to MORTH SPECIFICATION for base/sub-base reinforcement having minimum tensile strength 15kN/m in the longitudinal and transverse direction, with 5kN/m and 7kN/m tensile strength at 2% and 5% strain respectively in the longitudinal and transverse direction, junction efficiency not less than 95% and with 38mm X 38mm mesh opening
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Compacting earthwork in embankment in layers of 25 cm. by power roller or by any other mechanical means, like tractor driven sheep foot roller/ vibrating plate compactor earth rammer etc., (not at OMC) including necessary watering, labour charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as per direction of the Engineer-in-charge. (Payment will be made on the basis of Pre-work & Post-work level)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BARCHART2.pdf
Tender Documents • 0.86 MB
DRAWING2.pdf
Tender Documents • 5.09 MB
BOQ_2399964.xls
BOQ • 0.33 MB
WB2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid