| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹29.1 L+₹1,458.93 (0.05%)Rejected-AOC | L2 | Rejected-AOC L2 Tenderer Rejected |
Tender Value
₹29.5 L
EMD Value
₹30,000
Closing Date
4 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Strengthening of Sumanthirambedu Road in Katrambakkam panchayat (Km 0/0 to 0/600) at Sriperumbudur Block in Kancheepuram District having PKG No.TNKPM 16/2022-23
2023_RDTN_304051_1
DIPR/2142/Tender/2023 dt.14.04.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
Kancheepuram District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹30,000
O/o The Project Director DRDA Kancheepuram
12 Jul 2023
19 Apr 2023
4 May 2023
19 Apr 2023
4 May 2023
19 Apr 2023
25 Apr 2023
Amount
Nature of Work: Strengthening The Road From Sumanthiram Medu Road Km 0/00-0/600(R32) In Katrambakkam Panchayat cost of Construction cost Rs.27.30 Lakh & Maintenance Cost Rs.2.16 lakh
Clearing the Scrub jungle including all labour charges for burying and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees of girths up to 300mm, removal of stumps of such trees cut Earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete
Picking the worn out Bt surface inlcuding all other labour charges etc complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing & laying spreading & Compacting graded stone aggeragate to wet mix macadam specification including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in Sunbase/base course on well prepared surface & compacting with vibratory roller to achieve the desired as per MORT & H specification 406 IV Revision
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it inlcuding all other labour charges etc complete
Applying TACK COAT over Primed WMM surface at 2.50 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc. comp for base-course and side berms inlcuding all other labour charges etc complete
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for Culvert
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Below Sill
AboveSill
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall & Deck Wall
Providing and fixing kraft Paper for bearing Between Bed Block & Deck slab
Providing and fixing 20mm Bituman pad Between Bed Block & Dirt Wall
Providing weepholes in brick masonry/ stone masonry,plain/ reniforced concrete abutment,wing wall,retrun wall with 100mm dia AC pipe extending through the full width of the Structure with slope towards drawing face complete
Provision for HM Stone etc complete
Provision for 60cm Equilateral Triangle cautionary signboard
Provision for Retro reflection Board
Provision for MGSMT Board & Name Board
Provision for Cost of reflectors
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
E.SEKAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .