| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.3 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹73.4 L+₹6.1 L (8.99%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer | |
| 3 | L3₹73.6 L+₹6.3 L (9.34%)Rejected-Finance | L3 | Rejected-Finance L3 Tenderer |
Tender Value
₹77.2 L
EMD Value
₹78,000
Closing Date
27 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Strengthening of Strengthening of Elanthoppu to Thiruvadisoolam Road Km 0.0 2.00 in Thiruvadisoolam Village Panchayat in Kattankolathur Panchayat Unions of Chengalpattu District under MGSMT 2022-23 and 2023-24 25 percentage Component Having PKG No.02
2023_RDTN_330643_1
Rc.No.1380.2023.A9 Dated 12.06.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Kattankolathur Block
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹78,000
O/o The Project Director DRDA Chengalpattu
21 Aug 2023
22 Jun 2023
27 Jun 2023
22 Jun 2023
27 Jun 2023
22 Jun 2023
23 Jun 2023
Amount
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m with all leads and lifts and all other incidential charges. etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bitumenus Concrete 30mm thick using using 0.24cum of 13.2mm, 0.76 cum of 11.20mm , 6.7,6,5.6&4.75 mm 0.66 cum and 2.36 mm 0.34 cum of metal for mixing of Bitumen per 1 cum including cost and conveyance to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete PAVER FINISHER
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803
Supplying and fixing of HM stone of size 0.75x0.23x0.10 m including cost and conveyance and all other labour charges etc., complete
Supplying and fixing of KM stone of size 1.65x0.45x0.15 m including cost and conveyance and all other labour charges etc., complete
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Construction of 1.5m span RCC Slab culvert @ Km 0/880
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Deck slab bottom
wall sides
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for all RCC works
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
DSR SONS INDIA ENGINEERS PRIVATE LIMITED
A.AKBAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .