| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC 10 877 B PUDHU COLONY ANGALAKURICHI POST POLLACHI TALUK 642007 | POLLACHI | COIMBATORE | TAMIL NADU | 642007 | ₹13.8 L | L1 | Accepted-AOC LI |
| 2 | L2₹15.6 LRejected-AOC | ₹15.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹17.3 LRejected-AOC | ₹17.3 L | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical BQR condition not satisfied |
| 5 | Rejected-Technical | - | - | Rejected-Technical BQR condition not satisfied |
| Sl No | Description | Qty | Unit | m/s madhankumar construction L1 | M/s.Modern Construction Chemicals L3 | Sathish Kumar & Co L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling one course of pressed tiles at the existing roof finished with cement mortar and removing debris from the site including cost of all materials, lead ,lift ,labour charges etc., complete. | 491 | SQM | 36 ₹17,676 | 31 ₹15,221 | 20 ₹9,820 |
| 2.00 | Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. A.UP TO 3M HEIGHT | 59 | SQM | 472 ₹27,848 | 410 ₹24,190 | 350 ₹20,650 |
| 3.00 | Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. B.UP TO 6M HEIGHT | 44 | SQM | 474 ₹20,856 | 410 ₹18,040 | 400 ₹17,600 |
| 4.00 | Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. C.UP TO 9M HEIGHT | 30 | SQM | 475 ₹14,250 | 410 ₹12,300 | 425 ₹12,750 |
| 5.00 | Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. D.UP TO 12M HEIGHT | 39 | SQM | 475.5 ₹18,544.50 | 410 ₹15,990 | 475.5 ₹18,544.50 |
| 6.00 | Providing screening concrete by providing PCC 1:11/2:3 ratio using 6 mm to 10 mm thick downgraded machine crushed metal with 2% weight of cement of water proofing compound with average thickness of 75mm with proper slope on the roof including cost of all material, lead, lift, labour charges, curing etc., complete. A. 9M Lifting | 11 | CUM | 6,900 ₹75,900 | 8,700 ₹95,700 | 9,000 ₹99,000 |
| 7.00 | Providing screening concrete by providing PCC 1:11/2:3 ratio using 6 mm to 10 mm thick downgraded machine crushed metal with 2% weight of cement of water proofing compound with average thickness of 75mm with proper slope on the roof including cost of all material, lead, lift, labour charges, curing etc., complete. A. 18M Lifting | 26.5 | CUM | 7,100 ₹1.9 L | 8,700 ₹2.3 L | 9,500 ₹2.5 L |
| 8.00 | Dismantling existing stone ware /PVC pipe, wall, sunshade and Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessary PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the center of the pipe line in addition to those for more than 3m length, etc., complete complying with standard specification. | 145 | RM | 600 ₹87,000 | 650 ₹94,250 | 700 ₹1.0 L |
| 9.00 | Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and color laid in Cement mortar 1:3 (One cement and three sand) mixed with crude oil at 10% by weight of cement and pointing with same oiled mortar, labour charges for applying water proof component and epoxy packing for tiles joint over roof including cost of all materials, lead, lift, labour charges etc., complete. | 491 | SQM | 1,450 ₹7.1 L | 1,950 ₹9.6 L | 1,600 ₹7.9 L |
| 10.00 | Supplying and fixing in position of Bitumen pad -12mm thick for expansion joint including cost of materials, labour, lead ,lift etc., complete complying with standard specification. | 6.5 | SQM | 1,091 ₹7,091.50 | 890 ₹5,785 | 1,050 ₹6,825 |
Tender Value
Refer Docs
EMD Value
₹19,780
Closing Date
29 Oct 2025, 2:00 pmClosed
SE/Kadamparai GC
SE/Kadamparai GC,Minparai
Sholayar Power House 2 Roof leakage works
2025_EB_614540_1
SE/KGC/MIN/TS/CIVIL/04/25-26
Open Tender
Civil Works
180 days
Sholayar Power House 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,780
Yes
17 Mar 2026
15 Oct 2025
30 Oct 2025
15 Oct 2025
29 Oct 2025
15 Oct 2025
15 Oct 2025 - 27 Oct 2025
Amount
Dismantling one course of pressed tiles at the existing roof finished with cement mortar and removing debris from the site including cost of all materials, lead ,lift ,labour charges etc., complete.
Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. A.UP TO 3M HEIGHT
Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. B.UP TO 6M HEIGHT
Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. C.UP TO 9M HEIGHT
Chipping and roughening existing surface and Plastering with Cement Mortar 1:3 - 12mm thick mixed with water proofing compound including finishing, cost of all materials, lead, lift, curing , Labour charges etc., complete. D.UP TO 12M HEIGHT
Providing screening concrete by providing PCC 1:11/2:3 ratio using 6 mm to 10 mm thick downgraded machine crushed metal with 2% weight of cement of water proofing compound with average thickness of 75mm with proper slope on the roof including cost of all material, lead, lift, labour charges, curing etc., complete. A. 9M Lifting
Providing screening concrete by providing PCC 1:11/2:3 ratio using 6 mm to 10 mm thick downgraded machine crushed metal with 2% weight of cement of water proofing compound with average thickness of 75mm with proper slope on the roof including cost of all material, lead, lift, labour charges, curing etc., complete. A. 18M Lifting
Dismantling existing stone ware /PVC pipe, wall, sunshade and Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessary PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the center of the pipe line in addition to those for more than 3m length, etc., complete complying with standard specification.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and color laid in Cement mortar 1:3 (One cement and three sand) mixed with crude oil at 10% by weight of cement and pointing with same oiled mortar, labour charges for applying water proof component and epoxy packing for tiles joint over roof including cost of all materials, lead, lift, labour charges etc., complete.
Supplying and fixing in position of Bitumen pad -12mm thick for expansion joint including cost of materials, labour, lead ,lift etc., complete complying with standard specification.
GST in percentage @18%
Sathish Kumar & Co (BID ID -1498544)
M/s.Modern Construction Chemicals (BID ID -1498480)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid