| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC AS PER TCR | |
| 2 | L2₹4.3 L+₹20,305.04 (5.00%)Rejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance AS PER TCR |
Tender Value
₹4.1 L
EMD Value
₹5,100
Closing Date
12 Jul 2022, 4:00 pmClosed
GM, BANKOLA AREA
OFFICE OF THE GM, BANKOLA AREA, UKHRA, PIN-713363
Installation of underground sub station at 17L/9ED at Shyamsundarpur Colliery under Bankola Area
2022_ECL_248078_1
ECL/GM/BA/E TENDER/22-23/Enm/29 23.06.2022
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
BANKOLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,100
18 Oct 2022
27 Jun 2022
13 Jul 2022
27 Jun 2022
12 Jul 2022
28 Jun 2022
27 Jun 2022 - 1 Jul 2022
Amount
Item Description/ Heading
Collection of trolley from CM section and loading of TSU and its breaker and Prabhu make VCB from 30L/2ED to 30L/1ED and loading on trackline .
Transportation of TSUand its breaker and the prabhu make VCB from 30L/1ED to 24L/3ED by manually pulling over trackline then from 24L/3EDto 13L/3ED by haulage and then manually pulling over floor from 13L/10ED to 17L/9ED
One number of 3.3KV /630A Prabhu make VCB transportation fropm surface to 17L/9ED
Two station of 3.3KV /630A Prabhu make VCB transportation from 28L/22ED substation to 17L/9ED.
Lowering of PVC armoured cable of 95/120sqmm of length 600 meter ( tree rolls ) from surface to pit bottom and then transportation from pit bottom to 12L/3ED by haulage
Unrelling thr three rolls at 12L/3ED and then manually carrying the cable over shoulder and laying from 12L/1WD substation to 17L/9ED and then hanging the cable .
Transportation of two nos of ACB 30L/2ED substation to 17L/9ED
Unloading of TSU and its breaker and 4 nos of Prabhu make VCB at 17L/9ED and assembling of break and its TSU and placing the VCB .
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .