Tender Value
Refer Docs
Closing Date
28 Jul 2021, 11:00 amClosed
Deputy General Manager/ Dy. Manager (CS-G3)
Deputy General Manager/ Dy. Manager (CS-G3), Power Grid Corporation of India Limited, Saudamini, 3rd Floor, Plot No.-2, Sector-29, Gurgaon (Haryana) - 122001 ; Mobile: 0091-(0) 9971399078/9599814157
NIT - 4025 - Transmission line package TW02 for diversion of following Transmission Lines: - (1) 500kV HVDC Ballia-Bhiwadi line; (2) 800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
CC-CS/1090-NR3/TW-4252/3/G3
Open
Power/Energy Projects/Products
Works
Uttar Pradesh
15 Nov 2021
15 Jun 2021
28 Jul 2021
15 Jun 2021
28 Jul 2021
15 Jun 2021
29 Jun 2021
Name of Package : Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Package No : TW02
Specification No. : CC-CS/1090-NR3/TW-4252/3/G3
Completion Period 9.0
: Attachments: General guidelines for filling up the Attachments
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Specification No.: CC-CS/1090-NR3/TW-4252/3/G3
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 4, 4(A), 4(B), 5, 5(A), 5(B), 6, 7, 9, 10, 11, 12, 13,14, 14-IP, 15, 16, 17, 19, 20 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : Not Applicable
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment-3 (QR Schedule) : Format attached in Volume-III of Bidding Documents.
6 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
7 Attachment 18 Safety Pact : To be submitted as per ITB Clause No. 9.3(s) and as per remarks in the safety pact.
8 Attachment-21 to 28: To be submitted as perproforma provided in the bidding document.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] 0
Specify type of Bidder [Select from drop down menu] SOLE BIDDER 2 2 0
JOINT VENTURE (JV)
Name of Lead Partner
Address of Lead Partner
Name of other Partner - 2 (More, if any)
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-3(JV) 0 TW02
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services 2
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 9
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 ATTACHMENT-3 (QR)
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Qualifying Requirement Data)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name: Power Grid Corporation of India Ltd.,
Address: "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Attachment-3 (QR Schedule) is attached.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-4
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-4(A)
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-4(B)
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-5
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 ATTACHMENT-5A
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. 2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
CC-CS/1090-NR3/TW-4252/3/G3 ATTACHMENT-5A
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Declaration to source material/equipment and services from within Arunachal Pradesh)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
In line with ITB Clause 9.3 (e), we intend to supply following items which are to be manufactured within Arunachal Pradesh. We further declare that we would source material / services for atleast 30% of the Installation Price of Second /Services contract from within Arunachal Pradesh.
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details / write-up to engage the Locals sub-contractor/sub-vendor
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-6
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-7
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Details of Alternative Bid)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Work Completion Schedule)
Bidder’s Name and Address :
JOINT VENTURE (JV) OF &
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA). for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of contract
Tower Package – TW02
1 Detailed Engineering and drawing submission
a) commencement
2 Procurement of equipment/ components & assembly
a) commencement
a) commencement
4 Manufacturing
a) commencement
5 Shipments & Delivery
a) commencement
6 Establishment of site office
7 Installation at Site
a) commencement
8 Testing & Pre-commissioning
a) commencement
9 Trial Operation
a) commencement
Date : Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-10
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Guarantee Declaration)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that the equipments offered shall have minimum (or a muximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-11
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-11
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-11
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-12
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Price Adjustment Data)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).The necessary documentary evidence are enclosed :
Sl. No. Name of Materials Value of co-efficient Name of the published index Value of index
A For Fabricated Tower Parts (including bolts & nuts)
a Steel Blooms, co-efficient a = IEEMA
b. Electrolytic High Grade Zinc, co-efficient b = IEEMA
c. Labour, Co-efficient l= 0.85 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
Invalid Entry !
Coefficient ‘a’ shall be between 0.51 to 0.57 and coefficient ‘b’ shall be between 0.08 to 0.10 and coefficient ‘l’ shall be between 0.20 to 0.24 and sum of Coefficients ‘a’, ‘b’ and ‘l’ shall be 0.85
a EC grade aluminium ingots, co-eifciant a = 0.65 IEEMA
High Tensile Galvanised Steel wires , co-efficient b = 0.15 IEEMA FALSE FALSE
IEEMA High Carbon Steel Rods , co-efficient b = High Tensile Galvanised Steel wires , co-efficient b =
High Grade Electrolytic Zinc , co-efficient c =
c Labour, Co-efficient l= 0.05 Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
C. For Erection Price Component : FIRM
B.1 Hardware Fittings
i) Raw Material
a EC Grade Aluminium Ingots, coefficient a = IEEMA
b Electrolytic High Grade Zinc, coefficient b = IEEMA
c Manufacture of Basic Metals, coefficient c= Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’, ‘b’, ‘c’ and ‘l’ shall be 0.80
B.2 Conductor Accessories
(a) Mid Span Compression Joint for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = IEEMA
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
(b) Repair Sleeve for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = IEEMA
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
(c) Vibration damper for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = IEEMA
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
d) Flexible Copper Bond shall be on FIRM PRICE BASIS
C. For Erection Price Component
1 Installation Price Component {including civil works but excluding ‘supply & placement of reinforcement steel’, ‘concreting’, survey, soil investigation and aviation signal for river crossing towers(if any)}
A HSD, coefficient a = Wholesale Price Index Number for ‘HSD’ (Individual commodity) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.20 to 0.24 and coefficient ‘l’ shall be between 0.56 to 0.60 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
2 Supply & Placement of Reinforcement Steel
A HSD, coefficient a = Wholesale Price Index Number for ‘HSD’ (Individual commodity) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
B Manufacture of Basic Metals, coefficient b = 0.80 Wholesale Price Index Number for ‘Manufacture of Basic Metals’ (Group Item) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Coefficient ‘a’ shall be between 0.09 to 0.11 and coefficient ‘b’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.04 to 0.06 and sum of Coefficients ‘a’, ’b’ and ‘l’ shall be 0.80
3 For Concreting
A HSD, coefficient a = Wholesale Price Index Number for ‘HSD’ (Individual commodity) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
B Manufacture of Cement, Lime & Plaster, coefficient b = Wholesale Price Index Number for ‘Manufacture of Cement, Lime & Plaster’ (Group Item) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
C Cutting, Shaping and finishing of stone, coefficient c = 0.80 Wholesale Price Index Number for ‘Cutting, Shaping and finishing of stone’ (Group Item) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Coefficient ‘a’ shall be between 0.18 to 0.22 and coefficient ‘b’ shall be between 0.25 to 0.35 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’, ’b’, 'c' and ‘l’ shall be 0.80
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-13
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Declaration regarding Social Accountability)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-14
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Integrity Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (o).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
having its Registered Office at
having its Registered Office at FALSE
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 1 of 8
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA). Package and Specification Number CC-CS/1090-NR3/TW-4252/3/G3
POWERGRID values full compliance with all relevant laws of the land, rules, regulations, economic use of resources, and of fairness / transparency in its relations with its Bidders/ Contractors."
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles
(a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to
(b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution
(c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personal interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles during its participation in the tender process and during the contract execution:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 2 of 8
(a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract
(b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
(c ) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
(d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
(e ) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
(f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID
(g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 4 of 8
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or its subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter
(10) The word ‘IEM’ would include both singular and plural
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of JOINT VENTURE (JV) OF &
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Integrity Pact Page 8 of 8
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-15
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
Bidder’s Name and Address : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No)
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-16
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Additional Information)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of Bidder (Lead Partner)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-17
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-17
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-17
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-18
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-19
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Attachment-20
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address : To:
JOINT VENTURE (JV) OF & Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
S N FY Value of Total Sales (including Taxes and Duties)(T)
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
S N Value of Balance Works (B1) against the Contracts awarded by Employer Value of Balance Works (B2) against the Contracts awarded by Utilities other than Employer Total value of Balance Works (B){B=B1+B2}
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is 15th June 2016, the Balance bid capacity as on 01st April 2016 is to be declared)]
6***. Our/Our proposed manufacturer’s annual manufacturing capacity as certified by a Chartered Engineer or similar Professional/ Professional body/Govt Agencies is:
MT/annum (for tower/tower parts)
[Certificate from Chartered Engineer or similar Professional/ Professional body/Govt Agencies in the country of the bidder/proposed manufacturer is to be enclosed along with this Attachment. Annual manufacturing capacity of all the manufacturers to be furnished separately] ***(Applicable only in case of Tower packages with scope for tower supply)
7. Notwithstanding above, we also understand that the Bid Capacity/Manufacturing Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Date : Printed Name :
Place : Designation :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Specification No. :CC-CS/1090-NR3/TW-4252/3/G3 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract Services 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
"Saudamini", Plot No. 2, Sector 29 11 eleven 11 th 11 November
Gurgaon (Haryana) - 122001 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA). 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Pay Order 19 nineteen 19 th
(a) Attachment 1(TW02) : Not Applicable Banks certified Cheque Zero 20 twenty 20 th
(b) Attachment 2(TW02) : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3(TW02) : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). 0 Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 0 Not Applicable 24 th
(d) Attachment 4(TW02) : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5(TW02) : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A(TW02) : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6(TW02) : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7(TW02) : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8(TW02) : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9(TW02) : Work Completion Schedule. 31 st
(k) Attachment 10(TW02) : Guarantee Declaration.
(l) Attachment 11(TW02) : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12(TW02) : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13(TW02) : Declaration regarding Social Accountability.
(o) Attachment 14(TW02) : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15(TW02) : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16(TW02) : Additional Information.
(r) Attachment 17(TW02) : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18(TW02) : Safety Pact
(t) Attachment 19 (TW02) : Declaration.
(u) Attachment 20 (TW02) : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 (TW02) : Authorization certificate issued by Domestic Manufacturer for selling Domestically Manufactured Iron &Steel Products
(w) Attachment 22 (TW02) : Affidavit of Self Certification regarding Domestic Value Addition in Iron & Steel Products
(x) Attachment 23 (TW02) : Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII Order and MoP Order, if applicable
(y) Attachment 24 (TW02) : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII Order and MoP Order, if applicable
(z) Attachment 25 (TW02) : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
(aa) Attachment 26 (TW02) : Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1 (All partners of the Joint Venture in case of Joint Venture bids)
(bb) Attachment 27 (TW02) : Certification by the Bidder per DoE Order in line with ITB Clause 2.1 (In case of a Joint Venture bid, the declaration shall be given by all partners of the Joint Venture)
(cc) Attachment 28 (TW02) : Bid Securing Declaration to be submitted by the Bidder
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020 and 26/06/2020 read in conjunction with related notifications issued from time to time for such enterprises. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c) GCC 5.7 Contractors Responsibility
(d) GCC 8 Terms of Payment
(e) GCC 9.3 Performance Security
(f) GCC 10 Taxes and Duties
(g) GCC 21.2 Completion Time Guarantee
(h) GCC 22 Defect Liability
(i) GCC 23 Functional Guarantee
(j) GCC 25 Patent Indemnity
(k) GCC 26 Limitation of Liability
(l) GCC 38 Settlement of Disputes
(m) GCC 39 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and Address of Agent Amount and Currency Purpose of Commission or Gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(TW02) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(TW02) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Package Name Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
Package Code TW02 Bought-out
Specification No. SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-5, Sch-7 and Bid Form 2nd Envelope.
2 All the cells in Sch-4 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● Fill up applicable rate of Excise Duty. The amount of Excise Duty on the items mentioned as Direct in the mode of transaction in Schedule-1 shall be calculated automatically at the rate mentioned by the bidder here.
● Segregate and fill up the amount on which Sales Tax shall be applicable out of Ex-works supply items mentioned as direct in the mode of transaction in Schedule-1. Applicable Excise Duty on this amount will be calculated automatically at the rate mentioned by the bidder. Further, fill up the rate of applicable Sales Tax. Amount of Sales Tax shall be automatically calculated on the amount mentioned by the bidder as subjected to Sales Tax plus applicable Excise Duty at the rate mentioned by the Bidder.
● Difference of total amount quoted by the bidder as Direct Transaction and the amount mentioned by him subjected to Sales Tax shall be considered as the amount on which VAT shall become applicable and the same shall be calculated & displayed automatically. Applicable Excise Duty on this amount at the rate mentioned by the bidder shall also be calculated & displayed automatically. Fill up the rate of applicable VAT. The amount of VAT shall be calculated automatically on the amount considered to be subjected to VAT plus applicable Excise Duty at the rate mentioned by the bidder here.
● Amount as per details filled up by the bidder in the work sheets Entry Tax, Octroi and other Taxes & Duties shall be displayed in this work sheet Sch-5 but will not be added to the grand total and shall be considered as applicable.
● Click at the links to go to the work sheets Entry Tax, Octroi and other Taxes & Duties one by one.
● Fill the description, amount and rate of applicable Entry Tax. Total of this worksheet shall be displayed in Sch -5 (Taxes & Duties)
● Click at the link to go back to Sch-5.
● Fill the description, amount and rate of applicable Octroi. Total of this worksheet shall be displayed in Sch -5 (Taxes & Duties)
● Click at the link to go back to Sch-5.
Other Taxes & Duties :
● Fill the description, amount and rate of applicable Other Taxes & Duties. Total of this worksheet shall be displayed in Sch -5 (Taxes & Duties)
● Click at the link to go back to Sch-5.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid form 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Sole Bidder 1
JV (Joint Venture) Other Partner
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] 2 0
Name of Lead Partner
Address of Lead Partner
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule-1
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(SCHEDULE OF RATES AND PRICES)
JOINT VENTURE OF 0 & 0 To: 2
Bidder’s Name and Address (Lead Partner) : Contract Services 0
Name : Power Grid Corporation of India Ltd., 0
Address : "Saudamini", Plot No.-2 JOINT VENTURE OF 0 & 0
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted.
(All Prices are in Indian Rupees)
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘6’ is confirmed. If not indicate applicable the HSN code # Rate of GST applicable ( in %) Whether rate of GST in column ‘8’ is confirmed. If not indicate applicable rate of GST # Item Description Unit Qty. Unit Ex-Works Price (excluding GST) Total Ex-Works Price (excluding GST)
I Diversion of +/-500kV HVDC Ballia-Bhiwadi line
1 7000014230 10 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 110.989 INCLUDED 0 0 0.00 0.00 0.00 0.00
2 7000014230 20 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 165.295 INCLUDED 0 0 0.00 0.00 0.00 0.00
3 7000014230 30 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 6.566 INCLUDED 0 0 0.00 0.00 0.00 0.00
4 7000014230 40 FABRICATION AND SUPPLY OF TOWER 1000015276 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 0.835 INCLUDED 0 0 0.00 0.00 0.00 0.00
5 7000014230 50 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 11.852 INCLUDED 0 0 0.00 0.00 0.00 0.00
6 7000014230 60 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.136 INCLUDED 0 0 0.00 0.00 0.00 0.00
7 7000014230 70 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 11 INCLUDED 0 0 0.00 0.00 0.00 0.00
8 7000014230 80 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 11 INCLUDED 0 0 0.00 0.00 0.00 0.00
9 7000014230 90 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
10 7000014230 110 SUPPLY OF TOWER ACCESSORIES 1000010540 73082011 18 Danger Plate for 500kV EA 11 INCLUDED 0 0 0.00 0.00 0.00 0.00
11 7000014230 120 SUPPLY OF TOWER ACCESSORIES 1000032851 73082011 18 NUMBER PLATE FOR 500KV HVDC LINE EA 11 INCLUDED 0 0 0.00 0.00 0.00 0.00
12 7000014230 130 SUPPLY OF TOWER ACCESSORIES 1000017671 73082011 18 Supply of Pole Plate (Set of two) SET 11 INCLUDED 0 0 0.00 0.00 0.00 0.00
13 7000014230 100 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 11 INCLUDED 0 0 0.00 0.00 0.00 0.00
14 7000014230 140 SUPPLY OF TOWER ACCESSORIES 1000007737 73082011 18 Bird Guard (for V string) SET 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
15 7000014230 150 SUPPLY OF CONDUCTOR 1000030752 76141000 18 ACSR LAPWING CONDUCTOR KM 33.12 INCLUDED 0 0 0.00 0.00 0.00 0.00
16 7000014230 160 SUPPLY OF EARTHWIRE 1000030841 73121020 18 7/3.66 G.S. EARTHWIRE KM 8.278 INCLUDED 0 0 0.00 0.00 0.00 0.00
17 7000014230 170 SUPPLY OF INSULATOR 1000009318 85469090 18 Composite long rod Insulators for 500kV HVDC Transmission Line-210 KN EA 312 INCLUDED 0 0 0.00 0.00 0.00 0.00
18 7000014230 180 SUPPLY OF HARDWARE FITTINGS 1000017985 73082011 18 Hardware Fittings for 500kV HVDC with Quad ACSR Lapwing-Quad TensionString SET 36 INCLUDED 0 0 0.00 0.00 0.00 0.00
19 7000014230 190 SUPPLY OF HARDWARE FITTINGS 1000019842 73082011 18 Hardware Fittings for 500kV HVDC with Quad ACSR Lapwing-Single VSuspension String SET 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
20 7000014230 250 SUPPLY OF COND. & EW ACCESSORIES 1000015513 76169990 18 MID SPAN COMP JOINT-ACSR LAPWING EA 18 INCLUDED 0 0 0.00 0.00 0.00 0.00
21 7000014230 260 SUPPLY OF COND. & EW ACCESSORIES 1000018442 76169990 18 Repair Sleeve for Conductor-ACSR Lapwing EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
22 7000014230 280 SUPPLY OF COND. & EW ACCESSORIES 1000047986 76169990 18 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRLAPWING CONDUCTOR EA 164 INCLUDED 0 0 0.00 0.00 0.00 0.00
23 7000014230 270 SUPPLY OF COND. & EW ACCESSORIES 1000018558 76169990 18 Rigid Spacer for Jumper-ACSR Lapwing EA 100 INCLUDED 0 0 0.00 0.00 0.00 0.00
24 7000014230 200 SUPPLY OF COND. & EW ACCESSORIES 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
25 7000014230 210 SUPPLY OF COND. & EW ACCESSORIES 1000034136 76169990 18 FLEXIBLE ALUMUNIUM BOND EA 42 INCLUDED 0 0 0.00 0.00 0.00 0.00
26 7000014230 220 SUPPLY OF COND. & EW ACCESSORIES 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 84 INCLUDED 0 0 0.00 0.00 0.00 0.00
27 7000014230 230 SUPPLY OF COND. & EW ACCESSORIES 1000020447 73082011 18 Suspension clamp assembly -7/3.66mm Earth Wire EA 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
28 7000014230 240 SUPPLY OF COND. & EW ACCESSORIES 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 36 INCLUDED 0 0 0.00 0.00 0.00 0.00
II Diversion of +/-800kV HVDC BNC-Agra line
29 7000014230 360 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 391.505 INCLUDED 0 0 0.00 0.00 0.00 0.00
30 7000014230 370 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 362.129 INCLUDED 0 0 0.00 0.00 0.00 0.00
31 7000014230 380 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 12.463 INCLUDED 0 0 0.00 0.00 0.00 0.00
32 7000014230 390 FABRICATION AND SUPPLY OF TOWER 1000015276 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 1.718 INCLUDED 0 0 0.00 0.00 0.00 0.00
33 7000014230 400 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 29.114 INCLUDED 0 0 0.00 0.00 0.00 0.00
34 7000014230 410 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.362 INCLUDED 0 0 0.00 0.00 0.00 0.00
35 7000014230 420 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
36 7000014230 430 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
37 7000014230 440 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
38 7000014230 480 SUPPLY OF TOWER ACCESSORIES 1000010542 73082011 18 Supply of Danger Plate for 800kV EA 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
39 7000014230 490 SUPPLY OF TOWER ACCESSORIES 1000027464 73082011 18 Supply of Number Plate for 800kV EA 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
40 7000014230 460 SUPPLY OF TOWER ACCESSORIES 1000017671 73082011 18 Supply of Pole Plate (Set of two) SET 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
41 7000014230 450 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
42 7000014230 470 SUPPLY OF TOWER ACCESSORIES 1000027427 73082011 18 Bird Guard (Set of Two) SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
43 7000014230 500 SUPPLY OF CONDUCTOR 1000030752 76141000 18 ACSR LAPWING CONDUCTOR KM 42.456 INCLUDED 0 0 0.00 0.00 0.00 0.00
44 7000014230 2750 SUPPLY OF EARTHWIRE 1000030753 73121020 18 DESIGN , MANUFACTURING AND SUPPLY OF 7/4.5 G.S. EARTHWIRE KM 3.538 INCLUDED 0 0 0.00 0.00 0.00 0.00
45 7000014230 520 SUPPLY OF INSULATOR 1000009319 85469090 18 Composite long rod Insulators for 800kV HVDC Transmission Line-420 KN EA 372 INCLUDED 0 0 0.00 0.00 0.00 0.00
46 7000014230 530 SUPPLY OF HARDWARE FITTINGS 1000019844 73082011 18 Hardware Fittings for 800kV HVDC with Hexagonal ACSR Lapwing-Single"Y" Suspension String SET 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
47 7000014230 540 SUPPLY OF HARDWARE FITTINGS 1000021944 73082011 18 Hardware Fittings for 800kV HVDC with Hexagonal ACSR Lapwing-TripleTension String SET 40 INCLUDED 0 0 0.00 0.00 0.00 0.00
48 7000014230 600 SUPPLY OF COND. & EW ACCESSORIES 1000015513 76169990 18 MID SPAN COMP JOINT-ACSR LAPWING EA 24 INCLUDED 0 0 0.00 0.00 0.00 0.00
49 7000014230 610 SUPPLY OF COND. & EW ACCESSORIES 1000018442 76169990 18 Repair Sleeve for Conductor-ACSR Lapwing EA 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
50 7000014230 620 SUPPLY OF COND. & EW ACCESSORIES 1000038531 76169990 18 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR HEXA ACSRLAPWING CONDUCTOR EA 154 INCLUDED 0 0 0.00 0.00 0.00 0.00
51 7000014230 630 SUPPLY OF COND. & EW ACCESSORIES 1000028089 76169990 18 Rigid Spacer for Jumper-Hex ACSR Lapwing EA 198 INCLUDED 0 0 0.00 0.00 0.00 0.00
52 7000014230 2760 SUPPLY OF COND. & EW ACCESSORIES 1000015506 73082011 18 Mid Span Compression Joint -7/4.5mm Earth Wire EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
53 7000014230 560 SUPPLY OF COND. & EW ACCESSORIES 1000034136 76169990 18 FLEXIBLE ALUMUNIUM BOND EA 21 INCLUDED 0 0 0.00 0.00 0.00 0.00
54 7000014230 2770 SUPPLY OF COND. & EW ACCESSORIES 1000022421 73082011 18 Vibration damper -7/4.5mm Earth Wire EA 42 INCLUDED 0 0 0.00 0.00 0.00 0.00
55 7000014230 2780 SUPPLY OF COND. & EW ACCESSORIES 1000020449 73082011 18 Suspension clamp -7/4.5mm Earth Wire EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
56 7000014230 2790 SUPPLY OF COND. & EW ACCESSORIES 1000020992 73082011 18 Tension clamp -7/4.5mm Earth Wire EA 20 INCLUDED 0 0 0.00 0.00 0.00 0.00
57 7000014230 710 OPGW Supply 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 3.833 INCLUDED 0 0 0.00 0.00 0.00 0.00
58 7000014230 720 OPGW Supply 1000020444 82057000 18 Suspension clamp assembly for 24 fibre OPGW EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
59 7000014230 730 OPGW Supply 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
60 7000014230 740 OPGW Supply 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 9 INCLUDED 0 0 0.00 0.00 0.00 0.00
61 7000014230 750 OPGW Supply 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 46 INCLUDED 0 0 0.00 0.00 0.00 0.00
62 7000014230 760 OPGW Supply 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 123 INCLUDED 0 0 0.00 0.00 0.00 0.00
63 7000014230 770 OPGW Supply 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
64 7000014230 790 OPGW spares 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 0.134 INCLUDED 0 0 0.00 0.00 0.00 0.00
65 7000014230 800 OPGW spares 1000020444 82057000 18 Suspension clamp assembly for 24 fibre OPGW EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
66 7000014230 810 OPGW spares 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
67 7000014230 820 OPGW spares 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
68 7000014230 830 OPGW spares 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
69 7000014230 840 OPGW spares 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
70 7000014230 850 OPGW spares 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
III Diversion of 765kV S/C Sasaram-Fatehpur line
71 7000014230 860 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 170.137 INCLUDED 0 0 0.00 0.00 0.00 0.00
72 7000014230 870 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 199.397 INCLUDED 0 0 0.00 0.00 0.00 0.00
73 7000014230 880 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 9.134 INCLUDED 0 0 0.00 0.00 0.00 0.00
74 7000014230 890 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 14.753 INCLUDED 0 0 0.00 0.00 0.00 0.00
75 7000014230 900 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.153 INCLUDED 0 0 0.00 0.00 0.00 0.00
76 7000014230 910 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
77 7000014230 920 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
78 7000014230 930 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
79 7000014230 960 SUPPLY OF TOWER ACCESSORIES 1000010541 73082011 18 Danger Plate for 765kV EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
80 7000014230 970 SUPPLY OF TOWER ACCESSORIES 1000015972 73082011 18 Number Plate for 765kV EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
81 7000014230 940 SUPPLY OF TOWER ACCESSORIES 1000017508 73082011 18 Phase Plate (Set of three) SET 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
82 7000014230 950 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
83 7000014230 980 SUPPLY OF CONDUCTOR 1000030856 76141000 18 ACSR BERSIMIS CONDUCTOR KM 33.73 INCLUDED 0 0 0.00 0.00 0.00 0.00
84 7000014230 990 SUPPLY OF EARTHWIRE 1000030841 73121020 18 7/3.66 G.S. EARTHWIRE KM 5.622 INCLUDED 0 0 0.00 0.00 0.00 0.00
85 7000014230 1000 SUPPLY OF INSULATOR 1000009331 85469090 18 Composite long rod Insulators for 765kV Transmission Line-120 KN (Length-2900 mm, Creepage-12400 mm) EA 44 INCLUDED 0 0 0.00 0.00 0.00 0.00
86 7000014230 1010 SUPPLY OF INSULATOR 1000009333 85469090 18 Composite long rod Insulators for 765kV Transmission Line-210 KN (Length-2975 mm, Creepage-12400 mm) EA 384 INCLUDED 0 0 0.00 0.00 0.00 0.00
87 7000014230 1050 SUPPLY OF HARDWARE FITTINGS 1000010812 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Double V Suspension String SET 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
88 7000014230 1020 SUPPLY OF HARDWARE FITTINGS 1000019791 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single I Suspension String (Pilot) SET 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
89 7000014230 1040 SUPPLY OF HARDWARE FITTINGS 1000019835 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single V Suspension String (Pilot) SET 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
90 7000014230 1030 SUPPLY OF HARDWARE FITTINGS 1000017987 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR Bersimis Conductor-QuadTension String SET 42 INCLUDED 0 0 0.00 0.00 0.00 0.00
91 7000014230 1100 SUPPLY OF COND. & EW ACCESSORIES 1000015502 76169990 18 Mid Span Compression Joint for Conductor-ACSR Bersimis EA 14 INCLUDED 0 0 0.00 0.00 0.00 0.00
92 7000014230 1110 SUPPLY OF COND. & EW ACCESSORIES 1000018440 76169990 18 Repair Sleeve for Conductor-ACSR Bersimis EA 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
93 7000014230 1130 SUPPLY OF COND. & EW ACCESSORIES 1000047985 76169990 18 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRBERSIMIS CONDUCTOR EA 168 INCLUDED 0 0 0.00 0.00 0.00 0.00
94 7000014230 1120 SUPPLY OF COND. & EW ACCESSORIES 1000017977 76169990 18 Quad Rigid Spacer for Jumper-ACSR Bersimis EA 120 INCLUDED 0 0 0.00 0.00 0.00 0.00
95 7000014230 1060 SUPPLY OF COND. & EW ACCESSORIES 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 3 INCLUDED 0 0 0.00 0.00 0.00 0.00
96 7000014230 1070 SUPPLY OF COND. & EW ACCESSORIES 1000034136 76169990 18 FLEXIBLE ALUMUNIUM BOND EA 36 INCLUDED 0 0 0.00 0.00 0.00 0.00
97 7000014230 1080 SUPPLY OF COND. & EW ACCESSORIES 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 72 INCLUDED 0 0 0.00 0.00 0.00 0.00
98 7000014230 1090 SUPPLY OF COND. & EW ACCESSORIES 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 36 INCLUDED 0 0 0.00 0.00 0.00 0.00
IV Diversion of 765kV S/C Varanasi-Fatehpur line
99 7000014230 1210 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 117.434 INCLUDED 0 0 0.00 0.00 0.00 0.00
100 7000014230 1220 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 137.218 INCLUDED 0 0 0.00 0.00 0.00 0.00
101 7000014230 1230 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 6.233 INCLUDED 0 0 0.00 0.00 0.00 0.00
102 7000014230 1240 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 9.91 INCLUDED 0 0 0.00 0.00 0.00 0.00
103 7000014230 1250 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.104 INCLUDED 0 0 0.00 0.00 0.00 0.00
104 7000014230 1260 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
105 7000014230 1270 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
106 7000014230 1280 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
107 7000014230 1310 SUPPLY OF TOWER ACCESSORIES 1000010541 73082011 18 Danger Plate for 765kV EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
108 7000014230 1320 SUPPLY OF TOWER ACCESSORIES 1000015972 73082011 18 Number Plate for 765kV EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
109 7000014230 1290 SUPPLY OF TOWER ACCESSORIES 1000017508 73082011 18 Phase Plate (Set of three) SET 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
110 7000014230 1300 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
111 7000014230 1330 SUPPLY OF CONDUCTOR 1000030856 76141000 18 ACSR BERSIMIS CONDUCTOR KM 18.277 INCLUDED 0 0 0.00 0.00 0.00 0.00
112 7000014230 1340 SUPPLY OF EARTHWIRE 1000030841 73121020 18 7/3.66 G.S. EARTHWIRE KM 3.046 INCLUDED 0 0 0.00 0.00 0.00 0.00
113 7000014230 1350 SUPPLY OF INSULATOR 1000009331 85469090 18 Composite long rod Insulators for 765kV Transmission Line-120 KN (Length-2900 mm, Creepage-12400 mm) EA 38 INCLUDED 0 0 0.00 0.00 0.00 0.00
114 7000014230 1360 SUPPLY OF INSULATOR 1000009333 85469090 18 Composite long rod Insulators for 765kV Transmission Line-210 KN (Length-2975 mm, Creepage-12400 mm) EA 288 INCLUDED 0 0 0.00 0.00 0.00 0.00
115 7000014230 1370 SUPPLY OF HARDWARE FITTINGS 1000019791 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single I Suspension String (Pilot) SET 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
116 7000014230 1390 SUPPLY OF HARDWARE FITTINGS 1000019835 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single V Suspension String (Pilot) SET 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
117 7000014230 1380 SUPPLY OF HARDWARE FITTINGS 1000017987 73082011 18 Hardware Fittings for 765kV AC with Quad ACSR Bersimis Conductor-QuadTension String SET 36 INCLUDED 0 0 0.00 0.00 0.00 0.00
118 7000014230 1440 SUPPLY OF COND. & EW ACCESSORIES 1000015502 76169990 18 Mid Span Compression Joint for Conductor-ACSR Bersimis EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
119 7000014230 1450 SUPPLY OF COND. & EW ACCESSORIES 1000018440 76169990 18 Repair Sleeve for Conductor-ACSR Bersimis EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
120 7000014230 1470 SUPPLY OF COND. & EW ACCESSORIES 1000047985 76169990 18 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRBERSIMIS CONDUCTOR EA 126 INCLUDED 0 0 0.00 0.00 0.00 0.00
121 7000014230 1460 SUPPLY OF COND. & EW ACCESSORIES 1000017977 76169990 18 Quad Rigid Spacer for Jumper-ACSR Bersimis EA 105 INCLUDED 0 0 0.00 0.00 0.00 0.00
122 7000014230 1400 SUPPLY OF COND. & EW ACCESSORIES 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
123 7000014230 1410 SUPPLY OF COND. & EW ACCESSORIES 1000034136 76169990 18 FLEXIBLE ALUMUNIUM BOND EA 24 INCLUDED 0 0 0.00 0.00 0.00 0.00
124 7000014230 1420 SUPPLY OF COND. & EW ACCESSORIES 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 48 INCLUDED 0 0 0.00 0.00 0.00 0.00
125 7000014230 1430 SUPPLY OF COND. & EW ACCESSORIES 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 24 INCLUDED 0 0 0.00 0.00 0.00 0.00
V Diversion of 400kV D/C Kanpur-Lucknow line
126 7000014230 1540 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 92.267 INCLUDED 0 0 0.00 0.00 0.00 0.00
127 7000014230 1550 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 89.98 INCLUDED 0 0 0.00 0.00 0.00 0.00
128 7000014230 1560 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 2.065 INCLUDED 0 0 0.00 0.00 0.00 0.00
129 7000014230 1570 FABRICATION AND SUPPLY OF TOWER 1000015276 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 4.659 INCLUDED 0 0 0.00 0.00 0.00 0.00
130 7000014230 1580 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 6.158 INCLUDED 0 0 0.00 0.00 0.00 0.00
131 7000014230 1590 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.169 INCLUDED 0 0 0.00 0.00 0.00 0.00
132 7000014230 1600 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
133 7000014230 1610 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
134 7000014230 1620 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
135 7000014230 1660 SUPPLY OF TOWER ACCESSORIES 1000010539 73082011 18 Danger Plate for 400kV EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
136 7000014230 1670 SUPPLY OF TOWER ACCESSORIES 1000015971 73082011 18 Number Plate for 400kV EA 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
137 7000014230 1630 SUPPLY OF TOWER ACCESSORIES 1000017508 73082011 18 Phase Plate (Set of three) SET 10 INCLUDED 0 0 0.00 0.00 0.00 0.00
138 7000014230 1640 SUPPLY OF TOWER ACCESSORIES 1000009119 73082011 18 Circuit Plate (Set of two) SET 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
139 7000014230 1650 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
140 7000014230 1680 SUPPLY OF CONDUCTOR 1000030860 76141000 18 ACSR MOOSE CONDUCTOR KM 15.695 INCLUDED 0 0 0.00 0.00 0.00 0.00
141 7000014230 1690 SUPPLY OF EARTHWIRE 1000030841 73121020 18 7/3.66 G.S. EARTHWIRE KM 1.308 INCLUDED 0 0 0.00 0.00 0.00 0.00
142 7000014230 1700 SUPPLY OF INSULATOR 1000009325 85469090 18 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
143 7000014230 1710 SUPPLY OF INSULATOR 1000009328 85469090 18 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 144 INCLUDED 0 0 0.00 0.00 0.00 0.00
144 7000014230 1720 SUPPLY OF HARDWARE FITTINGS 1000019788 73082011 18 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-Single ISuspension String (Pilot) SET 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
145 7000014230 1730 SUPPLY OF HARDWARE FITTINGS 1000010800 73082011 18 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-DoubleTension String SET 72 INCLUDED 0 0 0.00 0.00 0.00 0.00
146 7000014230 1780 SUPPLY OF COND. & EW ACCESSORIES 1000015503 76169990 18 Mid Span Compression Joint for Conductor-ACSR Moose EA 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
147 7000014230 1790 SUPPLY OF COND. & EW ACCESSORIES 1000018443 76169990 18 Repair Sleeve for Conductor-ACSR Moose EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
148 7000014230 1800 SUPPLY OF COND. & EW ACCESSORIES 1000022431 73082011 18 Vibration Damper for Conductor-ACSR Moose EA 288 INCLUDED 0 0 0.00 0.00 0.00 0.00
149 7000014230 1810 SUPPLY OF COND. & EW ACCESSORIES 1000007935 76169990 18 Bundle Spacer for Conductor-Twin ACSR Moose EA 252 INCLUDED 0 0 0.00 0.00 0.00 0.00
150 7000014230 1820 SUPPLY OF COND. & EW ACCESSORIES 1000018559 76169990 18 Rigid Spacer for Jumper-Twin ACSR Moose EA 144 INCLUDED 0 0 0.00 0.00 0.00 0.00
151 7000014230 1740 SUPPLY OF COND. & EW ACCESSORIES 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
152 7000014230 1750 SUPPLY OF COND. & EW ACCESSORIES 1000034136 76169990 18 FLEXIBLE ALUMUNIUM BOND EA 12 INCLUDED 0 0 0.00 0.00 0.00 0.00
153 7000014230 1760 SUPPLY OF COND. & EW ACCESSORIES 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 24 INCLUDED 0 0 0.00 0.00 0.00 0.00
154 7000014230 1770 SUPPLY OF COND. & EW ACCESSORIES 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 12 INCLUDED 0 0 0.00 0.00 0.00 0.00
155 7000014230 1890 OPGW Supply 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 1.491 INCLUDED 0 0 0.00 0.00 0.00 0.00
156 7000014230 1900 OPGW Supply 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
157 7000014230 1910 OPGW Supply 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
158 7000014230 1920 OPGW Supply 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 28 INCLUDED 0 0 0.00 0.00 0.00 0.00
159 7000014230 1930 OPGW Supply 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 61 INCLUDED 0 0 0.00 0.00 0.00 0.00
160 7000014230 1940 OPGW Supply 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
161 7000014230 1960 OPGW spares 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 0.05 INCLUDED 0 0 0.00 0.00 0.00 0.00
162 7000014230 1970 OPGW spares 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
163 7000014230 1980 OPGW spares 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
164 7000014230 1990 OPGW spares 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
165 7000014230 2000 OPGW spares 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
166 7000014230 2010 OPGW spares 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
VI Diversion of 400kV D/C Lucknow-Unnao line 0 0 0.00 0.00 0.00 0.00
167 7000014230 2020 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 74.666 INCLUDED 0 0 0.00 0.00 0.00 0.00
168 7000014230 2030 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 74.686 INCLUDED 0 0 0.00 0.00 0.00 0.00
169 7000014230 2040 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 2.737 INCLUDED 0 0 0.00 0.00 0.00 0.00
170 7000014230 2050 FABRICATION AND SUPPLY OF TOWER 1000015276 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 2.33 INCLUDED 0 0 0.00 0.00 0.00 0.00
171 7000014230 2060 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
172 7000014230 2070 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.115 INCLUDED 0 0 0.00 0.00 0.00 0.00
173 7000014230 2080 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
174 7000014230 2090 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
175 7000014230 2100 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
176 7000014230 2140 SUPPLY OF TOWER ACCESSORIES 1000010539 73082011 18 Danger Plate for 400kV EA 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
177 7000014230 2150 SUPPLY OF TOWER ACCESSORIES 1000015971 73082011 18 Number Plate for 400kV EA 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
178 7000014230 2110 SUPPLY OF TOWER ACCESSORIES 1000017508 73082011 18 Phase Plate (Set of three) SET 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
179 7000014230 2120 SUPPLY OF TOWER ACCESSORIES 1000009119 73082011 18 Circuit Plate (Set of two) SET 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
180 7000014230 2130 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 4 INCLUDED 0 0 0.00 0.00 0.00 0.00
181 7000014230 2160 SUPPLY OF CONDUCTOR 1000030860 76141000 18 ACSR MOOSE CONDUCTOR KM 16.204 INCLUDED 0 0 0.00 0.00 0.00 0.00
182 7000014230 2170 SUPPLY OF EARTHWIRE 1000030841 73121020 18 7/3.66 G.S. EARTHWIRE KM 2.701 INCLUDED 0 0 0.00 0.00 0.00 0.00
183 7000014230 2180 SUPPLY OF INSULATOR 1000009325 85469090 18 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 3 INCLUDED 0 0 0.00 0.00 0.00 0.00
184 7000014230 2190 SUPPLY OF INSULATOR 1000009328 85469090 18 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 120 INCLUDED 0 0 0.00 0.00 0.00 0.00
185 7000014230 2200 SUPPLY OF HARDWARE FITTINGS 1000019788 73082011 18 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-Single ISuspension String (Pilot) SET 3 INCLUDED 0 0 0.00 0.00 0.00 0.00
186 7000014230 2210 SUPPLY OF HARDWARE FITTINGS 1000010800 73082011 18 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-DoubleTension String SET 60 INCLUDED 0 0 0.00 0.00 0.00 0.00
187 7000014230 2260 SUPPLY OF COND. & EW ACCESSORIES 1000015503 76169990 18 Mid Span Compression Joint for Conductor-ACSR Moose EA 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
188 7000014230 2270 SUPPLY OF COND. & EW ACCESSORIES 1000018443 76169990 18 Repair Sleeve for Conductor-ACSR Moose EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
189 7000014230 2280 SUPPLY OF COND. & EW ACCESSORIES 1000022431 73082011 18 Vibration Damper for Conductor-ACSR Moose EA 240 INCLUDED 0 0 0.00 0.00 0.00 0.00
190 7000014230 2290 SUPPLY OF COND. & EW ACCESSORIES 1000007935 76169990 18 Bundle Spacer for Conductor-Twin ACSR Moose EA 210 INCLUDED 0 0 0.00 0.00 0.00 0.00
191 7000014230 2300 SUPPLY OF COND. & EW ACCESSORIES 1000018559 76169990 18 Rigid Spacer for Jumper-Twin ACSR Moose EA 108 INCLUDED 0 0 0.00 0.00 0.00 0.00
192 7000014230 2220 SUPPLY OF COND. & EW ACCESSORIES 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
193 7000014230 2230 SUPPLY OF COND. & EW ACCESSORIES 1000034136 76169990 18 FLEXIBLE ALUMUNIUM BOND EA 20 INCLUDED 0 0 0.00 0.00 0.00 0.00
194 7000014230 2240 SUPPLY OF COND. & EW ACCESSORIES 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 40 INCLUDED 0 0 0.00 0.00 0.00 0.00
195 7000014230 2250 SUPPLY OF COND. & EW ACCESSORIES 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 20 INCLUDED 0 0 0.00 0.00 0.00 0.00
VII Diversion of 220kV S/C Unchahar-Raebareilly Line 0 0 0.00 0.00 0.00 0.00
196 7000014230 2370 FABRICATION AND SUPPLY OF TOWER 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 30.102 INCLUDED 0 0 0.00 0.00 0.00 0.00
197 7000014230 2380 FABRICATION AND SUPPLY OF TOWER 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 52.859 INCLUDED 0 0 0.00 0.00 0.00 0.00
198 7000014230 2390 FABRICATION AND SUPPLY OF TOWER 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 2.613 INCLUDED 0 0 0.00 0.00 0.00 0.00
199 7000014230 2400 FABRICATION AND SUPPLY OF TOWER 1000015276 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 0.184 INCLUDED 0 0 0.00 0.00 0.00 0.00
200 7000014230 2410 FABRICATION AND SUPPLY OF TOWER 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 3.503 INCLUDED 0 0 0.00 0.00 0.00 0.00
201 7000014230 2420 FABRICATION AND SUPPLY OF TOWER 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.041 INCLUDED 0 0 0.00 0.00 0.00 0.00
202 7000014230 2430 SUPPLY OF EARTHING OF TOWERS 1000017587 73082011 18 Supply of Pipe Type Earthing EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
203 7000014230 2440 SUPPLY OF EARTHING OF TOWERS 1000038340 73082011 18 ROD TYPE EARTHING EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
204 7000014230 2450 SUPPLY OF EARTHING OF TOWERS 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
205 7000014230 2480 SUPPLY OF TOWER ACCESSORIES 1000010538 73082011 18 Danger Plate for 220kV EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
206 7000014230 2490 SUPPLY OF TOWER ACCESSORIES 1000015970 73082011 18 Number Plate for 220kV EA 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
207 7000014230 2460 SUPPLY OF TOWER ACCESSORIES 1000017508 73082011 18 Phase Plate (Set of three) SET 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
208 7000014230 2470 SUPPLY OF TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
209 7000014230 2500 SUPPLY OF CONDUCTOR 1000030868 76141000 18 ACSR ZEBRA CONDUCTOR KM 7.445 INCLUDED 0 0 0.00 0.00 0.00 0.00
210 7000014230 2510 SUPPLY OF INSULATOR 1000009322 85469090 18 Composite long rod Insulators for 220kV Transmission Line-120 KN (Length-2175 mm, Creepage-7595 mm) EA 54 INCLUDED 0 0 0.00 0.00 0.00 0.00
211 7000014230 2520 SUPPLY OF HARDWARE FITTINGS 1000019817 73082011 18 Hardware Fittings for 220kV AC with ACSR Zebra Conductor-SingleTension SET 54 INCLUDED 0 0 0.00 0.00 0.00 0.00
212 7000014230 2530 SUPPLY OF COND. & EW ACCESSORIES 1000015507 76169990 18 Mid Span Compression Joint for Conductor ACSR singleZebra EA 3 INCLUDED 0 0 0.00 0.00 0.00 0.00
213 7000014230 2540 SUPPLY OF COND. & EW ACCESSORIES 1000018431 76169990 18 Repair Sleeve for Conductor ACSR single Zebra EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
214 7000014230 2550 SUPPLY OF COND. & EW ACCESSORIES 1000022416 73082011 18 Vibration Damper for Conductor ACSR single Zebra EA 108 INCLUDED 0 0 0.00 0.00 0.00 0.00
215 7000014230 2620 OPGW Supply 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 2.711 INCLUDED 0 0 0.00 0.00 0.00 0.00
216 7000014230 2630 OPGW Supply 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
217 7000014230 2640 OPGW Supply 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 8 INCLUDED 0 0 0.00 0.00 0.00 0.00
218 7000014230 2650 OPGW Supply 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 40 INCLUDED 0 0 0.00 0.00 0.00 0.00
219 7000014230 2660 OPGW Supply 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 53 INCLUDED 0 0 0.00 0.00 0.00 0.00
220 7000014230 2670 OPGW Supply 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
221 7000014230 2690 OPGW spares 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 0.1 INCLUDED 0 0 0.00 0.00 0.00 0.00
222 7000014230 2700 OPGW spares 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
223 7000014230 2710 OPGW spares 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
224 7000014230 2720 OPGW spares 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
225 7000014230 2730 OPGW spares 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 2 INCLUDED 0 0 0.00 0.00 0.00 0.00
226 7000014230 2740 OPGW spares 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
Total Ex-Works Price 0.00 0.00 0.00 0.00 0.00
Total Type Test charges as per Schedule-7 Not Applicable
Total Ex-Works Price including Type Test charges 0.00
# In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date Printed Name
Place Designation
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 2
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(SCHEDULE OF RATES AND PRICES)
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Local Transportation, In-transit Insurance, Loading and Unloading
(All Prices are in Indian Rupees)
SI. No. PR No PR Line Item No Activity Description Material Code Description Unit Quantity Unit Freight, In-transit Insurance, loading & Unloading Charges Total Freight, In-transit Insurance, loading & Unloading Charges
I Diversion of +/-500kV HVDC Ballia-Bhiwadi line
1 7000014230 10 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 110.989 INCLUDED
2 7000014230 20 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 165.295 INCLUDED
3 7000014230 30 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 6.566 INCLUDED
4 7000014230 40 FABRICATION AND SUPPLY OF TOWER 1000015276 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 0.835 INCLUDED
5 7000014230 50 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 11.852 INCLUDED
6 7000014230 60 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.136 INCLUDED
7 7000014230 70 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 11 INCLUDED
8 7000014230 80 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 11 INCLUDED
9 7000014230 90 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
10 7000014230 110 SUPPLY OF TOWER ACCESSORIES 1000010540 Danger Plate for 500kV EA 11 INCLUDED
11 7000014230 120 SUPPLY OF TOWER ACCESSORIES 1000032851 NUMBER PLATE FOR 500KV HVDC LINE EA 11 INCLUDED
12 7000014230 130 SUPPLY OF TOWER ACCESSORIES 1000017671 Supply of Pole Plate (Set of two) SET 11 INCLUDED
13 7000014230 100 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 11 INCLUDED
14 7000014230 140 SUPPLY OF TOWER ACCESSORIES 1000007737 Bird Guard (for V string) SET 6 INCLUDED
15 7000014230 150 SUPPLY OF CONDUCTOR 1000030752 ACSR LAPWING CONDUCTOR KM 33.12 INCLUDED
16 7000014230 160 SUPPLY OF EARTHWIRE 1000030841 7/3.66 G.S. EARTHWIRE KM 8.278 INCLUDED
17 7000014230 170 SUPPLY OF INSULATOR 1000009318 Composite long rod Insulators for 500kV HVDC Transmission Line-210 KN EA 312 INCLUDED
18 7000014230 180 SUPPLY OF HARDWARE FITTINGS 1000017985 Hardware Fittings for 500kV HVDC with Quad ACSR Lapwing-Quad TensionString SET 36 INCLUDED
19 7000014230 190 SUPPLY OF HARDWARE FITTINGS 1000019842 Hardware Fittings for 500kV HVDC with Quad ACSR Lapwing-Single VSuspension String SET 6 INCLUDED
20 7000014230 250 SUPPLY OF COND. & EW ACCESSORIES 1000015513 MID SPAN COMP JOINT-ACSR LAPWING EA 18 INCLUDED
21 7000014230 260 SUPPLY OF COND. & EW ACCESSORIES 1000018442 Repair Sleeve for Conductor-ACSR Lapwing EA 5 INCLUDED
22 7000014230 280 SUPPLY OF COND. & EW ACCESSORIES 1000047986 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRLAPWING CONDUCTOR EA 164 INCLUDED
23 7000014230 270 SUPPLY OF COND. & EW ACCESSORIES 1000018558 Rigid Spacer for Jumper-ACSR Lapwing EA 100 INCLUDED
24 7000014230 200 SUPPLY OF COND. & EW ACCESSORIES 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 2 INCLUDED
25 7000014230 210 SUPPLY OF COND. & EW ACCESSORIES 1000034136 FLEXIBLE ALUMUNIUM BOND EA 42 INCLUDED
26 7000014230 220 SUPPLY OF COND. & EW ACCESSORIES 1000022420 Vibration damper -7/3.66mm Earth Wire EA 84 INCLUDED
27 7000014230 230 SUPPLY OF COND. & EW ACCESSORIES 1000020447 Suspension clamp assembly -7/3.66mm Earth Wire EA 6 INCLUDED
28 7000014230 240 SUPPLY OF COND. & EW ACCESSORIES 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 36 INCLUDED
II Diversion of +/-800kV HVDC BNC-Agra line
29 7000014230 360 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 391.505 INCLUDED
30 7000014230 370 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 362.129 INCLUDED
31 7000014230 380 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 12.463 INCLUDED
32 7000014230 390 FABRICATION AND SUPPLY OF TOWER 1000015276 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 1.718 INCLUDED
33 7000014230 400 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 29.114 INCLUDED
34 7000014230 410 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.362 INCLUDED
35 7000014230 420 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 10 INCLUDED
36 7000014230 430 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 10 INCLUDED
37 7000014230 440 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
38 7000014230 480 SUPPLY OF TOWER ACCESSORIES 1000010542 Supply of Danger Plate for 800kV EA 10 INCLUDED
39 7000014230 490 SUPPLY OF TOWER ACCESSORIES 1000027464 Supply of Number Plate for 800kV EA 10 INCLUDED
40 7000014230 460 SUPPLY OF TOWER ACCESSORIES 1000017671 Supply of Pole Plate (Set of two) SET 10 INCLUDED
41 7000014230 450 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 10 INCLUDED
42 7000014230 470 SUPPLY OF TOWER ACCESSORIES 1000027427 Bird Guard (Set of Two) SET 1 INCLUDED
43 7000014230 500 SUPPLY OF CONDUCTOR 1000030752 ACSR LAPWING CONDUCTOR KM 42.456 INCLUDED
44 7000014230 2750 SUPPLY OF EARTHWIRE 1000030753 DESIGN , MANUFACTURING AND SUPPLY OF 7/4.5 G.S. EARTHWIRE KM 3.538 INCLUDED
45 7000014230 520 SUPPLY OF INSULATOR 1000009319 Composite long rod Insulators for 800kV HVDC Transmission Line-420 KN EA 372 INCLUDED
46 7000014230 530 SUPPLY OF HARDWARE FITTINGS 1000019844 Hardware Fittings for 800kV HVDC with Hexagonal ACSR Lapwing-Single"Y" Suspension String SET 2 INCLUDED
47 7000014230 540 SUPPLY OF HARDWARE FITTINGS 1000021944 Hardware Fittings for 800kV HVDC with Hexagonal ACSR Lapwing-TripleTension String SET 40 INCLUDED
48 7000014230 600 SUPPLY OF COND. & EW ACCESSORIES 1000015513 MID SPAN COMP JOINT-ACSR LAPWING EA 24 INCLUDED
49 7000014230 610 SUPPLY OF COND. & EW ACCESSORIES 1000018442 Repair Sleeve for Conductor-ACSR Lapwing EA 7 INCLUDED
50 7000014230 620 SUPPLY OF COND. & EW ACCESSORIES 1000038531 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR HEXA ACSRLAPWING CONDUCTOR EA 154 INCLUDED
51 7000014230 630 SUPPLY OF COND. & EW ACCESSORIES 1000028089 Rigid Spacer for Jumper-Hex ACSR Lapwing EA 198 INCLUDED
52 7000014230 2760 SUPPLY OF COND. & EW ACCESSORIES 1000015506 Mid Span Compression Joint -7/4.5mm Earth Wire EA 1 INCLUDED
53 7000014230 560 SUPPLY OF COND. & EW ACCESSORIES 1000034136 FLEXIBLE ALUMUNIUM BOND EA 21 INCLUDED
54 7000014230 2770 SUPPLY OF COND. & EW ACCESSORIES 1000022421 Vibration damper -7/4.5mm Earth Wire EA 42 INCLUDED
55 7000014230 2780 SUPPLY OF COND. & EW ACCESSORIES 1000020449 Suspension clamp -7/4.5mm Earth Wire EA 1 INCLUDED
56 7000014230 2790 SUPPLY OF COND. & EW ACCESSORIES 1000020992 Tension clamp -7/4.5mm Earth Wire EA 20 INCLUDED
57 7000014230 710 OPGW Supply 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 3.833 INCLUDED
58 7000014230 720 OPGW Supply 1000020444 Suspension clamp assembly for 24 fibre OPGW EA 1 INCLUDED
59 7000014230 730 OPGW Supply 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 2 INCLUDED
60 7000014230 740 OPGW Supply 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 9 INCLUDED
61 7000014230 750 OPGW Supply 1000022417 Vibration Damper for 24 fibre OPGW EA 46 INCLUDED
62 7000014230 760 OPGW Supply 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 123 INCLUDED
63 7000014230 770 OPGW Supply 1000014198 Joint Box for 24 fibre OPGW EA 2 INCLUDED
64 7000014230 790 OPGW spares 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 0.134 INCLUDED
65 7000014230 800 OPGW spares 1000020444 Suspension clamp assembly for 24 fibre OPGW EA 1 INCLUDED
66 7000014230 810 OPGW spares 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED
67 7000014230 820 OPGW spares 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 1 INCLUDED
68 7000014230 830 OPGW spares 1000022417 Vibration Damper for 24 fibre OPGW EA 2 INCLUDED
69 7000014230 840 OPGW spares 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 2 INCLUDED
70 7000014230 850 OPGW spares 1000014198 Joint Box for 24 fibre OPGW EA 1 INCLUDED
III Diversion of 765kV S/C Sasaram-Fatehpur line
71 7000014230 860 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 170.137 INCLUDED
72 7000014230 870 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 199.397 INCLUDED
73 7000014230 880 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 9.134 INCLUDED
74 7000014230 890 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 14.753 INCLUDED
75 7000014230 900 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.153 INCLUDED
76 7000014230 910 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 8 INCLUDED
77 7000014230 920 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 8 INCLUDED
78 7000014230 930 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
79 7000014230 960 SUPPLY OF TOWER ACCESSORIES 1000010541 Danger Plate for 765kV EA 8 INCLUDED
80 7000014230 970 SUPPLY OF TOWER ACCESSORIES 1000015972 Number Plate for 765kV EA 8 INCLUDED
81 7000014230 940 SUPPLY OF TOWER ACCESSORIES 1000017508 Phase Plate (Set of three) SET 8 INCLUDED
82 7000014230 950 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 8 INCLUDED
83 7000014230 980 SUPPLY OF CONDUCTOR 1000030856 ACSR BERSIMIS CONDUCTOR KM 33.73 INCLUDED
84 7000014230 990 SUPPLY OF EARTHWIRE 1000030841 7/3.66 G.S. EARTHWIRE KM 5.622 INCLUDED
85 7000014230 1000 SUPPLY OF INSULATOR 1000009331 Composite long rod Insulators for 765kV Transmission Line-120 KN (Length-2900 mm, Creepage-12400 mm) EA 44 INCLUDED
86 7000014230 1010 SUPPLY OF INSULATOR 1000009333 Composite long rod Insulators for 765kV Transmission Line-210 KN (Length-2975 mm, Creepage-12400 mm) EA 384 INCLUDED
87 7000014230 1050 SUPPLY OF HARDWARE FITTINGS 1000010812 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Double V Suspension String SET 6 INCLUDED
88 7000014230 1020 SUPPLY OF HARDWARE FITTINGS 1000019791 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single I Suspension String (Pilot) SET 7 INCLUDED
89 7000014230 1040 SUPPLY OF HARDWARE FITTINGS 1000019835 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single V Suspension String (Pilot) SET 7 INCLUDED
90 7000014230 1030 SUPPLY OF HARDWARE FITTINGS 1000017987 Hardware Fittings for 765kV AC with Quad ACSR Bersimis Conductor-QuadTension String SET 42 INCLUDED
91 7000014230 1100 SUPPLY OF COND. & EW ACCESSORIES 1000015502 Mid Span Compression Joint for Conductor-ACSR Bersimis EA 14 INCLUDED
92 7000014230 1110 SUPPLY OF COND. & EW ACCESSORIES 1000018440 Repair Sleeve for Conductor-ACSR Bersimis EA 4 INCLUDED
93 7000014230 1130 SUPPLY OF COND. & EW ACCESSORIES 1000047985 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRBERSIMIS CONDUCTOR EA 168 INCLUDED
94 7000014230 1120 SUPPLY OF COND. & EW ACCESSORIES 1000017977 Quad Rigid Spacer for Jumper-ACSR Bersimis EA 120 INCLUDED
95 7000014230 1060 SUPPLY OF COND. & EW ACCESSORIES 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 3 INCLUDED
96 7000014230 1070 SUPPLY OF COND. & EW ACCESSORIES 1000034136 FLEXIBLE ALUMUNIUM BOND EA 36 INCLUDED
97 7000014230 1080 SUPPLY OF COND. & EW ACCESSORIES 1000022420 Vibration damper -7/3.66mm Earth Wire EA 72 INCLUDED
98 7000014230 1090 SUPPLY OF COND. & EW ACCESSORIES 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 36 INCLUDED
IV Diversion of 765kV S/C Varanasi-Fatehpur line
99 7000014230 1210 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 117.434 INCLUDED
100 7000014230 1220 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 137.218 INCLUDED
101 7000014230 1230 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 6.233 INCLUDED
102 7000014230 1240 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 9.91 INCLUDED
103 7000014230 1250 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.104 INCLUDED
104 7000014230 1260 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 5 INCLUDED
105 7000014230 1270 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 5 INCLUDED
106 7000014230 1280 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
107 7000014230 1310 SUPPLY OF TOWER ACCESSORIES 1000010541 Danger Plate for 765kV EA 5 INCLUDED
108 7000014230 1320 SUPPLY OF TOWER ACCESSORIES 1000015972 Number Plate for 765kV EA 5 INCLUDED
109 7000014230 1290 SUPPLY OF TOWER ACCESSORIES 1000017508 Phase Plate (Set of three) SET 5 INCLUDED
110 7000014230 1300 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 5 INCLUDED
111 7000014230 1330 SUPPLY OF CONDUCTOR 1000030856 ACSR BERSIMIS CONDUCTOR KM 18.277 INCLUDED
112 7000014230 1340 SUPPLY OF EARTHWIRE 1000030841 7/3.66 G.S. EARTHWIRE KM 3.046 INCLUDED
113 7000014230 1350 SUPPLY OF INSULATOR 1000009331 Composite long rod Insulators for 765kV Transmission Line-120 KN (Length-2900 mm, Creepage-12400 mm) EA 38 INCLUDED
114 7000014230 1360 SUPPLY OF INSULATOR 1000009333 Composite long rod Insulators for 765kV Transmission Line-210 KN (Length-2975 mm, Creepage-12400 mm) EA 288 INCLUDED
115 7000014230 1370 SUPPLY OF HARDWARE FITTINGS 1000019791 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single I Suspension String (Pilot) SET 7 INCLUDED
116 7000014230 1390 SUPPLY OF HARDWARE FITTINGS 1000019835 Hardware Fittings for 765kV AC with Quad ACSR BersimisConductor-Single V Suspension String (Pilot) SET 7 INCLUDED
117 7000014230 1380 SUPPLY OF HARDWARE FITTINGS 1000017987 Hardware Fittings for 765kV AC with Quad ACSR Bersimis Conductor-QuadTension String SET 36 INCLUDED
118 7000014230 1440 SUPPLY OF COND. & EW ACCESSORIES 1000015502 Mid Span Compression Joint for Conductor-ACSR Bersimis EA 8 INCLUDED
119 7000014230 1450 SUPPLY OF COND. & EW ACCESSORIES 1000018440 Repair Sleeve for Conductor-ACSR Bersimis EA 2 INCLUDED
120 7000014230 1470 SUPPLY OF COND. & EW ACCESSORIES 1000047985 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRBERSIMIS CONDUCTOR EA 126 INCLUDED
121 7000014230 1460 SUPPLY OF COND. & EW ACCESSORIES 1000017977 Quad Rigid Spacer for Jumper-ACSR Bersimis EA 105 INCLUDED
122 7000014230 1400 SUPPLY OF COND. & EW ACCESSORIES 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 2 INCLUDED
123 7000014230 1410 SUPPLY OF COND. & EW ACCESSORIES 1000034136 FLEXIBLE ALUMUNIUM BOND EA 24 INCLUDED
124 7000014230 1420 SUPPLY OF COND. & EW ACCESSORIES 1000022420 Vibration damper -7/3.66mm Earth Wire EA 48 INCLUDED
125 7000014230 1430 SUPPLY OF COND. & EW ACCESSORIES 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 24 INCLUDED
V Diversion of 400kV D/C Kanpur-Lucknow line
126 7000014230 1540 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 92.267 INCLUDED
127 7000014230 1550 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 89.98 INCLUDED
128 7000014230 1560 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 2.065 INCLUDED
129 7000014230 1570 FABRICATION AND SUPPLY OF TOWER 1000015276 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 4.659 INCLUDED
130 7000014230 1580 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 6.158 INCLUDED
131 7000014230 1590 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.169 INCLUDED
132 7000014230 1600 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 5 INCLUDED
133 7000014230 1610 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 5 INCLUDED
134 7000014230 1620 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
135 7000014230 1660 SUPPLY OF TOWER ACCESSORIES 1000010539 Danger Plate for 400kV EA 5 INCLUDED
136 7000014230 1670 SUPPLY OF TOWER ACCESSORIES 1000015971 Number Plate for 400kV EA 5 INCLUDED
137 7000014230 1630 SUPPLY OF TOWER ACCESSORIES 1000017508 Phase Plate (Set of three) SET 10 INCLUDED
138 7000014230 1640 SUPPLY OF TOWER ACCESSORIES 1000009119 Circuit Plate (Set of two) SET 5 INCLUDED
139 7000014230 1650 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 5 INCLUDED
140 7000014230 1680 SUPPLY OF CONDUCTOR 1000030860 ACSR MOOSE CONDUCTOR KM 15.695 INCLUDED
141 7000014230 1690 SUPPLY OF EARTHWIRE 1000030841 7/3.66 G.S. EARTHWIRE KM 1.308 INCLUDED
142 7000014230 1700 SUPPLY OF INSULATOR 1000009325 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 6 INCLUDED
143 7000014230 1710 SUPPLY OF INSULATOR 1000009328 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 144 INCLUDED
144 7000014230 1720 SUPPLY OF HARDWARE FITTINGS 1000019788 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-Single ISuspension String (Pilot) SET 6 INCLUDED
145 7000014230 1730 SUPPLY OF HARDWARE FITTINGS 1000010800 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-DoubleTension String SET 72 INCLUDED
146 7000014230 1780 SUPPLY OF COND. & EW ACCESSORIES 1000015503 Mid Span Compression Joint for Conductor-ACSR Moose EA 7 INCLUDED
147 7000014230 1790 SUPPLY OF COND. & EW ACCESSORIES 1000018443 Repair Sleeve for Conductor-ACSR Moose EA 2 INCLUDED
148 7000014230 1800 SUPPLY OF COND. & EW ACCESSORIES 1000022431 Vibration Damper for Conductor-ACSR Moose EA 288 INCLUDED
149 7000014230 1810 SUPPLY OF COND. & EW ACCESSORIES 1000007935 Bundle Spacer for Conductor-Twin ACSR Moose EA 252 INCLUDED
150 7000014230 1820 SUPPLY OF COND. & EW ACCESSORIES 1000018559 Rigid Spacer for Jumper-Twin ACSR Moose EA 144 INCLUDED
151 7000014230 1740 SUPPLY OF COND. & EW ACCESSORIES 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 1 INCLUDED
152 7000014230 1750 SUPPLY OF COND. & EW ACCESSORIES 1000034136 FLEXIBLE ALUMUNIUM BOND EA 12 INCLUDED
153 7000014230 1760 SUPPLY OF COND. & EW ACCESSORIES 1000022420 Vibration damper -7/3.66mm Earth Wire EA 24 INCLUDED
154 7000014230 1770 SUPPLY OF COND. & EW ACCESSORIES 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 12 INCLUDED
155 7000014230 1890 OPGW Supply 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 1.491 INCLUDED
156 7000014230 1900 OPGW Supply 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 2 INCLUDED
157 7000014230 1910 OPGW Supply 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 5 INCLUDED
158 7000014230 1920 OPGW Supply 1000022417 Vibration Damper for 24 fibre OPGW EA 28 INCLUDED
159 7000014230 1930 OPGW Supply 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 61 INCLUDED
160 7000014230 1940 OPGW Supply 1000014198 Joint Box for 24 fibre OPGW EA 2 INCLUDED
161 7000014230 1960 OPGW spares 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 0.05 INCLUDED
162 7000014230 1970 OPGW spares 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED
163 7000014230 1980 OPGW spares 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 1 INCLUDED
164 7000014230 1990 OPGW spares 1000022417 Vibration Damper for 24 fibre OPGW EA 2 INCLUDED
165 7000014230 2000 OPGW spares 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 2 INCLUDED
166 7000014230 2010 OPGW spares 1000014198 Joint Box for 24 fibre OPGW EA 1 INCLUDED
VI Diversion of 400kV D/C Lucknow-Unnao line
167 7000014230 2020 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 74.666 INCLUDED
168 7000014230 2030 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 74.686 INCLUDED
169 7000014230 2040 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 2.737 INCLUDED
170 7000014230 2050 FABRICATION AND SUPPLY OF TOWER 1000015276 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 2.33 INCLUDED
171 7000014230 2060 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 5 INCLUDED
172 7000014230 2070 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.115 INCLUDED
173 7000014230 2080 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 4 INCLUDED
174 7000014230 2090 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 4 INCLUDED
175 7000014230 2100 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
176 7000014230 2140 SUPPLY OF TOWER ACCESSORIES 1000010539 Danger Plate for 400kV EA 4 INCLUDED
177 7000014230 2150 SUPPLY OF TOWER ACCESSORIES 1000015971 Number Plate for 400kV EA 4 INCLUDED
178 7000014230 2110 SUPPLY OF TOWER ACCESSORIES 1000017508 Phase Plate (Set of three) SET 8 INCLUDED
179 7000014230 2120 SUPPLY OF TOWER ACCESSORIES 1000009119 Circuit Plate (Set of two) SET 4 INCLUDED
180 7000014230 2130 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 4 INCLUDED
181 7000014230 2160 SUPPLY OF CONDUCTOR 1000030860 ACSR MOOSE CONDUCTOR KM 16.204 INCLUDED
182 7000014230 2170 SUPPLY OF EARTHWIRE 1000030841 7/3.66 G.S. EARTHWIRE KM 2.701 INCLUDED
183 7000014230 2180 SUPPLY OF INSULATOR 1000009325 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 3 INCLUDED
184 7000014230 2190 SUPPLY OF INSULATOR 1000009328 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 120 INCLUDED
185 7000014230 2200 SUPPLY OF HARDWARE FITTINGS 1000019788 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-Single ISuspension String (Pilot) SET 3 INCLUDED
186 7000014230 2210 SUPPLY OF HARDWARE FITTINGS 1000010800 Hardware Fittings for 400kV AC with Twin ACSR Moose Conductor-DoubleTension String SET 60 INCLUDED
187 7000014230 2260 SUPPLY OF COND. & EW ACCESSORIES 1000015503 Mid Span Compression Joint for Conductor-ACSR Moose EA 7 INCLUDED
188 7000014230 2270 SUPPLY OF COND. & EW ACCESSORIES 1000018443 Repair Sleeve for Conductor-ACSR Moose EA 2 INCLUDED
189 7000014230 2280 SUPPLY OF COND. & EW ACCESSORIES 1000022431 Vibration Damper for Conductor-ACSR Moose EA 240 INCLUDED
190 7000014230 2290 SUPPLY OF COND. & EW ACCESSORIES 1000007935 Bundle Spacer for Conductor-Twin ACSR Moose EA 210 INCLUDED
191 7000014230 2300 SUPPLY OF COND. & EW ACCESSORIES 1000018559 Rigid Spacer for Jumper-Twin ACSR Moose EA 108 INCLUDED
192 7000014230 2220 SUPPLY OF COND. & EW ACCESSORIES 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 1 INCLUDED
193 7000014230 2230 SUPPLY OF COND. & EW ACCESSORIES 1000034136 FLEXIBLE ALUMUNIUM BOND EA 20 INCLUDED
194 7000014230 2240 SUPPLY OF COND. & EW ACCESSORIES 1000022420 Vibration damper -7/3.66mm Earth Wire EA 40 INCLUDED
195 7000014230 2250 SUPPLY OF COND. & EW ACCESSORIES 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 20 INCLUDED
VII Diversion of 220kV S/C Unchahar-Raebareilly Line
196 7000014230 2370 FABRICATION AND SUPPLY OF TOWER 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 30.102 INCLUDED
197 7000014230 2380 FABRICATION AND SUPPLY OF TOWER 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 52.859 INCLUDED
198 7000014230 2390 FABRICATION AND SUPPLY OF TOWER 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 2.613 INCLUDED
199 7000014230 2400 FABRICATION AND SUPPLY OF TOWER 1000015276 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-MS Steel for Normal Towers MT 0.184 INCLUDED
200 7000014230 2410 FABRICATION AND SUPPLY OF TOWER 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 3.503 INCLUDED
201 7000014230 2420 FABRICATION AND SUPPLY OF TOWER 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 0.041 INCLUDED
202 7000014230 2430 SUPPLY OF EARTHING OF TOWERS 1000017587 Supply of Pipe Type Earthing EA 8 INCLUDED
203 7000014230 2440 SUPPLY OF EARTHING OF TOWERS 1000038340 ROD TYPE EARTHING EA 8 INCLUDED
204 7000014230 2450 SUPPLY OF EARTHING OF TOWERS 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 1 INCLUDED
205 7000014230 2480 SUPPLY OF TOWER ACCESSORIES 1000010538 Danger Plate for 220kV EA 8 INCLUDED
206 7000014230 2490 SUPPLY OF TOWER ACCESSORIES 1000015970 Number Plate for 220kV EA 8 INCLUDED
207 7000014230 2460 SUPPLY OF TOWER ACCESSORIES 1000017508 Phase Plate (Set of three) SET 8 INCLUDED
208 7000014230 2470 SUPPLY OF TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 8 INCLUDED
209 7000014230 2500 SUPPLY OF CONDUCTOR 1000030868 ACSR ZEBRA CONDUCTOR KM 7.445 INCLUDED
210 7000014230 2510 SUPPLY OF INSULATOR 1000009322 Composite long rod Insulators for 220kV Transmission Line-120 KN (Length-2175 mm, Creepage-7595 mm) EA 54 INCLUDED
211 7000014230 2520 SUPPLY OF HARDWARE FITTINGS 1000019817 Hardware Fittings for 220kV AC with ACSR Zebra Conductor-SingleTension SET 54 INCLUDED
212 7000014230 2530 SUPPLY OF COND. & EW ACCESSORIES 1000015507 Mid Span Compression Joint for Conductor ACSR singleZebra EA 3 INCLUDED
213 7000014230 2540 SUPPLY OF COND. & EW ACCESSORIES 1000018431 Repair Sleeve for Conductor ACSR single Zebra EA 1 INCLUDED
214 7000014230 2550 SUPPLY OF COND. & EW ACCESSORIES 1000022416 Vibration Damper for Conductor ACSR single Zebra EA 108 INCLUDED
215 7000014230 2620 OPGW Supply 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 2.711 INCLUDED
216 7000014230 2630 OPGW Supply 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 2 INCLUDED
217 7000014230 2640 OPGW Supply 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 8 INCLUDED
218 7000014230 2650 OPGW Supply 1000022417 Vibration Damper for 24 fibre OPGW EA 40 INCLUDED
219 7000014230 2660 OPGW Supply 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 53 INCLUDED
220 7000014230 2670 OPGW Supply 1000014198 Joint Box for 24 fibre OPGW EA 2 INCLUDED
221 7000014230 2690 OPGW spares 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 0.1 INCLUDED
222 7000014230 2700 OPGW spares 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 INCLUDED
223 7000014230 2710 OPGW spares 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 1 INCLUDED
224 7000014230 2720 OPGW spares 1000022417 Vibration Damper for 24 fibre OPGW EA 2 INCLUDED
225 7000014230 2730 OPGW spares 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 2 INCLUDED
226 7000014230 2740 OPGW spares 1000014198 Joint Box for 24 fibre OPGW EA 1 INCLUDED
Date Printed Name
Place Designation
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 3
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(SCHEDULE OF RATES AND PRICES )
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Installation Charges :
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column ‘8’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘10’ is confirmed. If not indicate applicable rate of GST # Description Unit Quantity Unit Erection Charges Total Erection Charges GST Before Discount Discount Total Price after discount GST After Discount
I Diversion of +/-500kV HVDC Ballia-Bhiwadi line
2 7000014230 290 90 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 4.098 INCLUDED 0 0 0.0000000000 0 0 0.00
3 7000014230 300 100 10 SOIL INVESTIGATION 100001244 998342 18 Detailed soil investigation: All kinds of soils except fissured rock and hard rock EA 1 INCLUDED 0 0 0.0000000000 0 0
4 7000014230 330 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 11 INCLUDED 0 0 0.0000000000 0 0
5 7000014230 330 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 11 INCLUDED 0 0 0.0000000000 0 0
6 7000014230 330 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
7 7000014230 340 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 11 INCLUDED 0 0 0.0000000000 0 0
8 7000014230 340 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 11 INCLUDED 0 0 0.0000000000 0 0
9 7000014230 340 120 30 INSTALLATION OF TOWER ACCESSORIES 100002534 995444 18 Installation of Pole Plate (Set of two) SET 11 INCLUDED 0 0 0.0000000000 0 0
10 7000014230 340 120 40 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 11 INCLUDED 0 0 0.0000000000 0 0
11 7000014230 340 120 50 INSTALLATION OF TOWER ACCESSORIES 100001281 995444 18 Installation of tower accessories: Bird Guard (for V String) SET 6 INCLUDED 0 0 0.0000000000 0 0
12 7000014230 320 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 288.136 INCLUDED 0 0 0.0000000000 0 0
13 7000014230 310 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 1749 INCLUDED 0 0 0.0000000000 0 0
14 7000014230 310 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 1749 INCLUDED 0 0 0.0000000000 0 0
15 7000014230 310 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 428.51 INCLUDED 0 0 0.0000000000 0 0
16 7000014230 310 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 51.78 INCLUDED 0 0 0.0000000000 0 0
17 7000014230 310 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 37.591 INCLUDED 0 0 0.0000000000 0 0
18 7000014230 310 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 7.537 INCLUDED 0 0 0.0000000000 0 0
19 7000014230 350 150 20 STRINGING 100003540 995468 18 Destringing of ±500 KV HVDC transmission line & Transportation of dismatled materials to POWERGRID store KM 3.914 INCLUDED 0 0 0.0000000000 0 0
20 7000014230 350 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 206.603 INCLUDED 0 0 0.0000000000 0 0
21 7000014230 350 150 10 STRINGING 100003539 995468 18 Installation of insulators strings complete with arcing horn and necessary hardware installation and stringing of conductorincluding fixing of conductor accessories, installation and stringing of Earth wire includung fixing of earthwire accessories forthe line-500kV HVDC line KM 4.098 INCLUDED 0 0 0.0000000000 0 0
II Diversion of +/-800kV HVDC BNC-Agra line
23 7000014230 640 90 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 3.503 INCLUDED 0 0 0.0000000000 0 0
24 7000014230 650 100 10 SOIL INVESTIGATION 100001244 998342 18 Detailed soil investigation: All kinds of soils except fissured rock and hard rock EA 1 INCLUDED 0 0 0.0000000000 0 0
25 7000014230 680 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 10 INCLUDED 0 0 0.0000000000 0 0
26 7000014230 680 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 10 INCLUDED 0 0 0.0000000000 0 0
27 7000014230 680 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
28 7000014230 690 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 10 INCLUDED 0 0 0.0000000000 0 0
29 7000014230 690 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 10 INCLUDED 0 0 0.0000000000 0 0
30 7000014230 690 120 30 INSTALLATION OF TOWER ACCESSORIES 100002534 995444 18 Installation of Pole Plate (Set of two) SET 10 INCLUDED 0 0 0.0000000000 0 0
31 7000014230 690 120 40 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 10 INCLUDED 0 0 0.0000000000 0 0
32 7000014230 690 120 50 INSTALLATION OF TOWER ACCESSORIES 100002535 995444 18 Installation of Bird Guard for HVDC bipole insulator strings (Set of two) SET 1 INCLUDED 0 0 0.0000000000 0 0
33 7000014230 670 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 782.748 INCLUDED 0 0 0.0000000000 0 0
34 7000014230 660 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 2552 INCLUDED 0 0 0.0000000000 0 0
35 7000014230 660 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 2552 INCLUDED 0 0 0.0000000000 0 0
36 7000014230 660 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 775.405 INCLUDED 0 0 0.0000000000 0 0
37 7000014230 660 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 77.476 INCLUDED 0 0 0.0000000000 0 0
38 7000014230 660 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 69.898 INCLUDED 0 0 0.0000000000 0 0
39 7000014230 660 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 14.543 INCLUDED 0 0 0.0000000000 0 0
40 7000014230 700 150 10 STRINGING 100001618 995468 18 Bipole 800kV HVDC with hexagonal bundle without metallic return conductor/ installation of insulator strings complete with arcinghorns and necessary hardware, installing and stringing of conductor including fixing of conductor accessories, installing andstringing of earthwire including fixing of earthwire accessories for the line KM 3.503 INCLUDED 0 0 0.0000000000 0 0
41 7000014230 700 150 20 STRINGING 100003544 995468 18 Destringing of ±800 KV HVDC transmission line & Transportation of dismatled materials to POWERGRID store KM 3.385 INCLUDED 0 0 0.0000000000 0 0
42 7000014230 700 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 488.687 INCLUDED 0 0 0.0000000000 0 0
43 7000014230 780 180 10 OPGW Erection 170000265 998716 18 Installation of Joint box above ground (Including Splicing & Testing) : 24 fibres EA 2 INCLUDED 0 0 0.0000000000 0 0
III Diversion of 765kV S/C Sasaram-Fatehpur line
45 7000014230 1140 90 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 2.783 INCLUDED 0 0 0.0000000000 0 0
46 7000014230 1150 100 10 SOIL INVESTIGATION 100001244 998342 18 Detailed soil investigation: All kinds of soils except fissured rock and hard rock EA 1 INCLUDED 0 0 0.0000000000 0 0
47 7000014230 1180 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 8 INCLUDED 0 0 0.0000000000 0 0
48 7000014230 1180 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 8 INCLUDED 0 0 0.0000000000 0 0
49 7000014230 1180 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
50 7000014230 1190 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 8 INCLUDED 0 0 0.0000000000 0 0
51 7000014230 1190 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 8 INCLUDED 0 0 0.0000000000 0 0
52 7000014230 1190 120 30 INSTALLATION OF TOWER ACCESSORIES 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 8 INCLUDED 0 0 0.0000000000 0 0
53 7000014230 1190 120 40 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 8 INCLUDED 0 0 0.0000000000 0 0
54 7000014230 1170 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 384.287 INCLUDED 0 0 0.0000000000 0 0
55 7000014230 1160 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 2024 INCLUDED 0 0 0.0000000000 0 0
56 7000014230 1160 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 2024 INCLUDED 0 0 0.0000000000 0 0
57 7000014230 1160 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 591.33 INCLUDED 0 0 0.0000000000 0 0
58 7000014230 1160 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 61.43 INCLUDED 0 0 0.0000000000 0 0
59 7000014230 1160 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 50.061 INCLUDED 0 0 0.0000000000 0 0
60 7000014230 1160 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 9.287 INCLUDED 0 0 0.0000000000 0 0
61 7000014230 1200 150 10 STRINGING 100001295 995468 18 765kV AC single circuit with quad bundle conductor/ installation of insulator strings complete with arcing horns and necessaryhardware, installing and stringing of conductor including fixing of conductor accessories, installing and stringing of earthwireincluding fixing of earthwire accessories for the line KM 2.783 INCLUDED 0 0 0.0000000000 0 0
62 7000014230 1200 150 20 STRINGING 100002635 995468 18 Destringing of existing 765 kV Single Circuit line including associated hardwares, insulators, line materials, etc. and returningthe dismantled material including transportation to the nearby POWERGRID store KM 2.314 INCLUDED 0 0 0.0000000000 0 0
63 7000014230 1200 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 109.957 INCLUDED 0 0 0.0000000000 0 0
IV Diversion of 765kV S/C Varanasi-Fatehpur line
65 7000014230 1480 100 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 1.508 INCLUDED 0 0 0.0000000000 0 0
66 7000014230 1510 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 5 INCLUDED 0 0 0.0000000000 0 0
67 7000014230 1510 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 5 INCLUDED 0 0 0.0000000000 0 0
68 7000014230 1510 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
69 7000014230 1520 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 5 INCLUDED 0 0 0.0000000000 0 0
70 7000014230 1520 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 5 INCLUDED 0 0 0.0000000000 0 0
71 7000014230 1520 120 30 INSTALLATION OF TOWER ACCESSORIES 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 5 INCLUDED 0 0 0.0000000000 0 0
72 7000014230 1520 120 40 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 5 INCLUDED 0 0 0.0000000000 0 0
73 7000014230 1500 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 264.562 INCLUDED 0 0 0.0000000000 0 0
74 7000014230 1490 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 1369 INCLUDED 0 0 0.0000000000 0 0
75 7000014230 1490 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 1369 INCLUDED 0 0 0.0000000000 0 0
76 7000014230 1490 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 406.31 INCLUDED 0 0 0.0000000000 0 0
77 7000014230 1490 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 41.68 INCLUDED 0 0 0.0000000000 0 0
78 7000014230 1490 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 34.37 INCLUDED 0 0 0.0000000000 0 0
79 7000014230 1490 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 6.337 INCLUDED 0 0 0.0000000000 0 0
80 7000014230 1530 150 10 STRINGING 100001295 995468 18 765kV AC single circuit with quad bundle conductor/ installation of insulator strings complete with arcing horns and necessaryhardware, installing and stringing of conductor including fixing of conductor accessories, installing and stringing of earthwireincluding fixing of earthwire accessories for the line KM 1.508 INCLUDED 0 0 0.0000000000 0 0
81 7000014230 1530 150 20 STRINGING 100002635 995468 18 Destringing of existing 765 kV Single Circuit line including associated hardwares, insulators, line materials, etc. and returningthe dismantled material including transportation to the nearby POWERGRID store KM 1.412 INCLUDED 0 0 0.0000000000 0 0
82 7000014230 1530 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 85.924 INCLUDED 0 0 0.0000000000 0 0
V Diversion of 400kV D/C Kanpur-Lucknow line
84 7000014230 1830 100 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 1.295 INCLUDED 0 0 0.0000000000 0 0
85 7000014230 1860 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 5 INCLUDED 0 0 0.0000000000 0 0
86 7000014230 1860 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 5 INCLUDED 0 0 0.0000000000 0 0
87 7000014230 1860 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
88 7000014230 1870 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 5 INCLUDED 0 0 0.0000000000 0 0
89 7000014230 1870 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 5 INCLUDED 0 0 0.0000000000 0 0
90 7000014230 1870 120 30 INSTALLATION OF TOWER ACCESSORIES 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 10 INCLUDED 0 0 0.0000000000 0 0
91 7000014230 1870 120 40 INSTALLATION OF TOWER ACCESSORIES 100001278 995444 18 Installation of tower accessories: Circuit Plate (Set of two) SET 5 INCLUDED 0 0 0.0000000000 0 0
92 7000014230 1870 120 50 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 5 INCLUDED 0 0 0.0000000000 0 0
93 7000014230 1850 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 188.405 INCLUDED 0 0 0.0000000000 0 0
94 7000014230 1840 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 1314 INCLUDED 0 0 0.0000000000 0 0
95 7000014230 1840 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 2384 INCLUDED 0 0 0.0000000000 0 0
96 7000014230 1840 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 500.76 INCLUDED 0 0 0.0000000000 0 0
97 7000014230 1840 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 57.02 INCLUDED 0 0 0.0000000000 0 0
98 7000014230 1840 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 47.069 INCLUDED 0 0 0.0000000000 0 0
99 7000014230 1840 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 6.893 INCLUDED 0 0 0.0000000000 0 0
100 7000014230 1880 150 10 STRINGING 100003658 995468 18 Installation of insulator strings complete with arcing horns and necessary hardware, installing and stringing of conductor includingfixing of conductor accessories, installing and stringing of earthwire/OPGW including fixing of earthwire/OPGW accessories for 400kV double circuit towers with twin bundle conductor. KM 1.295 INCLUDED 0 0 0.0000000000 0 0
101 7000014230 1880 150 20 STRINGING 100001308 995468 18 Destringing of existing 400kV D/C line and transportation to store KM 1.186 INCLUDED 0 0 0.0000000000 0 0
102 7000014230 1880 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 77.302 INCLUDED 0 0 0.0000000000 0 0
103 7000014230 1950 180 10 OPGW Erection 170000265 998716 18 Installation of Joint box above ground (Including Splicing & Testing) : 24 fibres EA 2 INCLUDED 0 0 0.0000000000 0 0
VI Diversion of 400kV D/C Lucknow-Unnao line
105 7000014230 2310 100 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 1.337 INCLUDED 0 0 0.0000000000 0 0
106 7000014230 2340 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 4 INCLUDED 0 0 0.0000000000 0 0
107 7000014230 2340 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 4 INCLUDED 0 0 0.0000000000 0 0
108 7000014230 2340 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
109 7000014230 2350 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 4 INCLUDED 0 0 0.0000000000 0 0
110 7000014230 2350 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 4 INCLUDED 0 0 0.0000000000 0 0
111 7000014230 2350 120 30 INSTALLATION OF TOWER ACCESSORIES 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 8 INCLUDED 0 0 0.0000000000 0 0
112 7000014230 2350 120 40 INSTALLATION OF TOWER ACCESSORIES 100001278 995444 18 Installation of tower accessories: Circuit Plate (Set of two) SET 4 INCLUDED 0 0 0.0000000000 0 0
113 7000014230 2350 120 50 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 4 INCLUDED 0 0 0.0000000000 0 0
114 7000014230 2330 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 154.352 INCLUDED 0 0 0.0000000000 0 0
115 7000014230 2320 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 1040 INCLUDED 0 0 0.0000000000 0 0
116 7000014230 2320 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 1678 INCLUDED 0 0 0.0000000000 0 0
117 7000014230 2320 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 377.394 INCLUDED 0 0 0.0000000000 0 0
118 7000014230 2320 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 41.748 INCLUDED 0 0 0.0000000000 0 0
119 7000014230 2320 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 34.52 INCLUDED 0 0 0.0000000000 0 0
120 7000014230 2320 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 5.182 INCLUDED 0 0 0.0000000000 0 0
121 7000014230 2360 150 10 STRINGING 100001291 995468 18 400kV AC double circuit with twin bundle conductor/ installation of insulator strings complete with arcing horns and necessaryhardware, installing and stringing of conductor including fixing of conductor accessories, installing and stringing of earthwireincluding fixing of earthwire accessories for the line KM 1.337 INCLUDED 0 0 0.0000000000 0 0
122 7000014230 2360 150 20 STRINGING 100001308 995468 18 Destringing of existing 400kV D/C line and transportation to store KM 1.27 INCLUDED 0 0 0.0000000000 0 0
123 7000014230 2360 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 35.683 INCLUDED 0 0 0.0000000000 0 0
VII Diversion of 220kV S/C Unchahar-Raebareilly Line
125 7000014230 2560 100 20 SURVEY 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 2.457 INCLUDED 0 0 0.0000000000 0 0
126 7000014230 2590 110 10 INSTALLATION OF EARTHING OF TOWERS 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 8 INCLUDED 0 0 0.0000000000 0 0
127 7000014230 2590 110 20 INSTALLATION OF EARTHING OF TOWERS 100004928 998731 18 ROD TYPE EARTHING EA 8 INCLUDED 0 0 0.0000000000 0 0
128 7000014230 2590 110 30 INSTALLATION OF EARTHING OF TOWERS 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 1 INCLUDED 0 0 0.0000000000 0 0
129 7000014230 2600 120 10 INSTALLATION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 8 INCLUDED 0 0 0.0000000000 0 0
130 7000014230 2600 120 20 INSTALLATION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 8 INCLUDED 0 0 0.0000000000 0 0
131 7000014230 2600 120 30 INSTALLATION OF TOWER ACCESSORIES 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 8 INCLUDED 0 0 0.0000000000 0 0
132 7000014230 2600 120 40 INSTALLATION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 8 INCLUDED 0 0 0.0000000000 0 0
133 7000014230 2580 130 10 ERECTION 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 86.464 INCLUDED 0 0 0.0000000000 0 0
134 7000014230 2570 140 10 WORK ASSOCIATED WITH TOWER FOUNDATION 100001255 995433 18 Excavation : Dry Soil M3 542 INCLUDED 0 0 0.0000000000 0 0
135 7000014230 2570 140 20 WORK ASSOCIATED WITH TOWER FOUNDATION 100001256 995433 18 Excavation: Wet Soil M3 648 INCLUDED 0 0 0.0000000000 0 0
136 7000014230 2570 140 30 WORK ASSOCIATED WITH TOWER FOUNDATION 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 125.014 INCLUDED 0 0 0.0000000000 0 0
137 7000014230 2570 140 40 WORK ASSOCIATED WITH TOWER FOUNDATION 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 16.681 INCLUDED 0 0 0.0000000000 0 0
138 7000014230 2570 140 50 WORK ASSOCIATED WITH TOWER FOUNDATION 100001262 995454 18 Reinforcement Steel : Supply and placement MT 10.903 INCLUDED 0 0 0.0000000000 0 0
139 7000014230 2570 140 60 WORK ASSOCIATED WITH TOWER FOUNDATION 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 2.838 INCLUDED 0 0 0.0000000000 0 0
140 7000014230 2610 150 30 STRINGING 100001309 995431 18 Dismantling of existing tower and transportation to stores MT 31.653 INCLUDED 0 0 0.0000000000 0 0
141 7000014230 2610 150 10 STRINGING 100003959 995468 18 Installation of insulator strings complete with arcing horns and necessary hardware, installing and stringing of single conductorincluding fixing of conductor accessories, installing and stringing of OPGW including fixing of OPGW accessories for 220kV S/C line KM 2.457 INCLUDED 0 0 0.0000000000 0 0
142 7000014230 2610 150 20 STRINGING 100006124 995468 18 Destringing of existing 220 kV Single Circuit line including associated hardwares, insulators, line materials, etc. and returningthe dismantled material including transportation to the nearby POWERGRID store KM 2.356 INCLUDED 0 0 0.0000000000 0 0
143 7000014230 2680 180 10 OPGW Erection 170000265 998716 18 Installation of Joint box above ground (Including Splicing & Testing) : 24 fibres EA 2 INCLUDED 0 0 0.0000000000 0 0
# In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date Printed Name
Place Designation
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 4
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(SCHEDULE OF RATES AND PRICES )
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Training Charges :
SI. No. PR No Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column ‘…’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘---’ is confirmed. If not indicate applicable rate of GST # Description Unit Quantity Unit Charges Total Charges
NOTE: To and fro charges and accommodation for the Instructor (Trainer) and Training material for the Trainees shall be included in the prices quoted by the bidder.
# In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank” “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder
Place Printed Name
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 5
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST on Goods 0.00 Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST on Services 0.00 Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (indentified in Schedule-3) and Training to be imparted in India (identified in Schedule-4) which are not included in the Installation and Training charges as per the provision of the Bidding Documents, as applicable #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00
Date : Printed Name :
Place : Designation :
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 5
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST on Goods 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST on Services 0.00
Total GST on Installation Services (indentified in Schedule-3) and Training to be imparted in India (identified in Schedule-4) which are not included in the Installation and Training charges as per the provision of the Bidding Documents, as applicable
GRAND TOTAL [1+2] 0.00
Date : Printed Name :
Place : Designation :
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 6
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(GRAND SUMMARY)
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading and unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 Not Applicable
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 Not Applicable
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+5]
Date : Printed Name :
Place : Designation :
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 6 After Discount
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2
Local Transportation, Insurance and other Incidental Services
3 TOTAL SCHEDULE NO. 3
Installation Charges
4 TOTAL SCHEDULE NO. 4
Training Charges
5 TOTAL SCHEDULE NO. 5
Taxes and Duties
6 TOTAL SCHEDULE NO. 7
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5]
Date : Printed Name :
Place : Designation :
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule - 6
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
(GRAND SUMMARY)
JOINT VENTURE OF 0 & 0 To:
Bidder’s Name and Address (Lead Partner) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR) From Sch-6 Discount Factors
1 TOTAL SCHEDULE NO. 1 0.00 0.00 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00 0.00 0.00
Local Transportation, In-transit Insurance, loading and unloading
3 TOTAL SCHEDULE NO. 3 0.00 0.00 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 Not Applicable
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 Not Applicable
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+5]
Date : Printed Name :
Place : Designation :
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Schedule 7
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA). As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
JOINT VENTURE OF 0 & 0
Bidder’s Name and Address (Lead Partner) : To:
Name : Contract Services
Address : Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Type tests on Earthwire, Hardwar Fittings & accessories of conductor & earthwire:
SL. NO. PR No Line Item No Code HSN of the Equipment /item for which type test is to be conducted Whether HSN in column ‘---’ is confirmed. If not indicate applicable the HSN code # Rate of GST applicable ( in %) Whether rate of GST in column ‘---’ is confirmed. If not indicate applicable rate of GST # Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
Date Printed Name
Place Designation
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3
Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA). 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Letter of Discount
LETTER OF DISCOUNT
Contract Services Schedule 1 0.00
Power Grid Corporation of India Ltd., Schedule 2 0.00
"Saudamini", Plot No.-2 Schedule 3 0.00
Sector-29, (near IFFCO Chowk) Total 0.00
Gurgaon (Haryana) - 122001
Subject : Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA).
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Sch-1 Sch-2 Sch-3
1 Discount on lum-sum basis on total price quoted by us without GST. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4 & Sch-7] In Rs. 0.00 0.00 0.00
2 Discount on percent basis on total price quoted by us without GST. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4 & Sch-7] In Percent (%) 0.00 0.00 0.00
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00
Schedule-2 : Local Transportation, In-transit Insurance, loading and unloading In Rs. 0.00
Schedule-3 : Installation Charges In Rs. 0.00
Schedule-4 : Training Charges In Rs.
Schedule-7 : Type Test Charges In Rs.
4 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00
Schedule-2 : Local Transportation, In-transit Insurance, loading and unloading In Percent (%) 0.00
Schedule-3 : Installation Charges In Percent (%) 0.00
Schedule-4 : Training Charges In Percent (%)
Schedule-7 : Type Test Charges In Percent (%)
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation. #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF!
[Discount will not be calculated authometrically. However, the same shall be considered during evaluation.]
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain, 0.00 0.00 0.00
Yours faithfully, 0.00000000 0.00000000 0.00000000 Discount Factors
For and on behalf of
Date : Printed Name : 0.00
Place : Designation : 0.00
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
SPEC. NO.: CC-CS/1090-NR3/TW-4252/3/G3 Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
0 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
"Saudamini", Plot No.-2 11 th 11 November
Sector-29, 12 th 12 December
Gurgaon (Haryana) - 122001 13 th
Name of Contract : Transmission line package TW02 for diversion of following Transmission Lines: - (1) +/-500kV HVDC Ballia-Bhiwadi line; (2) +/-800kV HVDC BNC-Agra line; (3) 765kV S/C Sasaram-Fatehpur line; (4) 765kV S/C Varanasi-Fatehpur line; (5) 400kV D/C Kanpur-Lucknow line; (6) 400kV D/C Lucknow-Unnao line and (7) 220kV S/C Unchahar-Raebareilly, including supply of towers, conductor, composite insulator, earthwire/ OPGW, hardware & associated accessories, destringing/dismantling works, etc. associated with for diversion /shifting of various Transmission Lines infringing ROW of Ganga Expressway of Uttar Pradesh Expressway Industrial Development Authority (UPEIDA). 15 th
Dear Ladies and/or Gentlemen, 16 th
1.0 In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. 0/- () or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. 17 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. Sole Bidder 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of test
Date : Printed Name : 0.00
Place : Designation : 0.00
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Total Ex-Works Price Direct 0.00
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF!
Total Ex-works Price including Type Test charges #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
^ If the item(s) quoted/considered as "Bought-out" in the bid are manufactured at Bidder's works and confirmed to be supplied under “Direct transaction” by the bidder, then the taxes and duties on such items shall be paid/reimbursed by POWERGRID in line with the provisions of Bidding Documents. For this purpose, at the time of award, the Ex-works price (exclusive of taxes & duties) shall be arrived at from the quoted Ex-works price (inclusive of taxes ad duties) by excluding taxes and duties applicable on such items, as on date of Bid opening, in case of supplies from manufacturer proposed in the bid. During contract execution, the taxes and duties on such items shall be paid/reimbursed at actuals, limited to the rates prevailing on date of Bid opening.
Place : Printed Name : --
Total F&I Price (=SUM(I16:I27))
Date : (='Sch-1'!B43)
Place : (='Sch-1'!B44) Printed Name : (='Sch-1'!E44)
Designation : (='Sch-1'!E45)
Total Installaiton Charges #REF!
Date : (='Sch-1'!B43)
Place : (='Sch-1'!B44) Printed Name : (='Sch-1'!E44)
Designation : (='Sch-1'!E45)
Date : (=IF('Sch-1'!B43=0,"", 'Sch-1'!B43)) (="Printed Name : " & IF('Sch-1'!E44=0,"",'Sch-1'!E44))
Place : (=IF('Sch-1'!B44=0,"", 'Sch-1'!B44)) (="Designation : " & IF('Sch-1'!E45=0,"",'Sch-1'!E45))
TOTAL TYPE TEST CHARGES (=SUM(I17:I18))
Date : (='Sch-1'!B43) (="Printed Name : " & 'Sch-1'!E44)
Place : (='Sch-1'!B44) (="Designation : " & 'Sch-1'!E45)
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
#REF! 0.00 #REF! 0.00 #REF!
#REF! #REF! #N/A
#REF! #REF! 0 #REF! #REF! 0
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 0 0 #REF! plus
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 0 1 #REF!
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 1 0 #REF!
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 1 1 #REF!
#REF! 0 1 0 0 #REF!
1 One 1 One 1 One 1 One #REF! 0 1 0 1 #REF!
2 Two 2 Two 2 Two 2 Two #REF! 0 1 1 0 #REF!
3 Three 3 Three 3 Three 3 Three #REF! 0 1 1 1 #REF!
4 Four 4 Four 4 Four 4 Four #REF! 1 0 0 0 #REF!
5 Five 5 Five 5 Five 5 Five #REF! 1 0 0 1 #REF!
6 Six 6 Six 6 Six 6 Six #REF! 1 0 1 0 #REF!
7 Seven 7 Seven 7 Seven 7 Seven #REF! 1 0 1 1 #REF!
8 Eight 8 Eight 8 Eight 8 Eight #REF! 1 1 0 0 #REF!
9 Nine 9 Nine 9 Nine 9 Nine #REF! 1 1 0 1 #REF!
10 Ten 10 Ten 10 Ten 10 Ten #REF! 1 1 1 0 #REF!
11 Eleven 11 Eleven 11 Eleven 11 Eleven #REF! 1 1 1 1 #REF!
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen #REF! 0 0 0 0 #REF! +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen #REF! 0 0 0 1 #REF! /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen #REF! 0 0 1 0 #REF! /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen #REF! 0 0 1 1 #REF!
20 Twenty 20 Twenty 20 Twenty 20 Twenty #REF! 0 1 0 0 #REF!
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One #REF! 0 1 0 1 #REF!
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two #REF! 0 1 1 0 #REF!
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three #REF! 0 1 1 1 #REF!
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four #REF! 1 0 0 0 #REF!
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five #REF! 1 0 0 1 #REF!
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six #REF! 1 0 1 0 #REF!
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven #REF! 1 0 1 1 #REF!
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight #REF! 1 1 0 0 #REF!
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine #REF! 1 1 0 1 #REF!
30 Thirty 30 Thirty 30 Thirty 30 Thirty #REF! 1 1 1 0 #REF!
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One #REF! 1 1 1 1 #REF!
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Vol-III_01st Envelope-Bid Form & Attachments_TW02.xls
xls • 2.39 MB
Vol-III_02_Attachment-3-QR.doc
doc • 0.13 MB
Vol-III_03-Attachment-8- Manufacturers Authorization Form_TW02.doc
doc • 0.03 MB
Vol-III_04-Attachment-18-SAFETY PACT_TW02.docx
docx • 0.03 MB
Vol-III_05-Attachment-21- Authorization Certificate issued by Domestic Manufacturer_TW02.docx
docx • 0.02 MB
Vol-III_06-Attachment-22- Affidavit for Self Certifictaion_TW02-Iron & Steel.docx
docx • 0.02 MB
Vol-III_07_Attachemnt-23- Affidavit for self-certifictaion.DOCX
docx • 0.02 MB
Vol-III_08_Attachment 24- certificate by Auditor.docx
docx • 0.02 MB
Vol-III_09-Attachment-25-Compliance to the process related to the e-RA_TW02.docx
docx • 0.02 MB
Vol-III_10-Attachment -26_Declaration regarding events encountered_TW02.docx
docx • 0.03 MB
Vol-III_11_Attachment 27- certificate by bidder.docx
docx • 0.02 MB
Vol-III_12_Attachment-28-Bid Securing Declaration .docx
docx • 0.02 MB
Vol-III_13_2nd Envelope-Price Schedule.xlsx
xlsx • 0.65 MB
Vol-III_14-Legends.pdf
pdf • 0.03 MB
132kV and 220kV Typical Tower.pdf
pdf • 0.04 MB
220 KV SISP WITH BALANCING WT Model (1).pdf
pdf • 0.08 MB
220KV DT.pdf
pdf • 0.11 MB
25_31. 765 kV SC string drgs.pdf
pdf • 0.59 MB
32. Y Suspension String.pdf
pdf • 0.18 MB
33.Triple Tension String.pdf
pdf • 0.20 MB
800kV drawings.pdf
pdf • 2.72 MB
All strings.pdf
pdf • 2.56 MB
BIRD DIVERTER DRAWING.pdf
pdf • 0.07 MB
bird gurad for V String.pdf
pdf • 0.35 MB
Chemical Counterpoise.pdf
pdf • 0.10 MB
Chemical Pipe Type.pdf
pdf • 0.10 MB
Covered grading Ring Drawing.pdf
pdf • 0.62 MB
GA_A_PROP TYPE SST Model (1).pdf
pdf • 0.17 MB
HARD ROCK EARTHING.pdf
pdf • 0.19 MB
Individual Leg SST.pdf
pdf • 0.58 MB
Insulator Packing drawing PVC type.pdf
pdf • 0.88 MB
Insulator Packing drawing.pdf
pdf • 0.09 MB
pile earthing Drawing.pdf
pdf • 0.30 MB
Appendix-A- DRS.pdf
pdf • 0.19 MB
Appendix-B.1 -Guidelines for Off Line OPGW.pdf
pdf • 0.41 MB
Appendix-B.2 - Guidelines for Live Line OPGW.pdf
pdf • 1.80 MB
Appendix-C-Splicing_guideline.pdf
pdf • 0.41 MB
Placement chart.pdf
pdf • 2.17 MB
Revised Bird Guard Sheet 1 of 2.pdf
pdf • 0.10 MB
Revised Bird Guard Sheet 2 of 2 .pdf
pdf • 0.11 MB
Rod Type Earthing.pdf
pdf • 0.15 MB
Standard Drum drawings.pdf
pdf • 0.71 MB
Thumbs.db
db • 0.28 MB
Tower & Access R1.pdf
pdf • 2.86 MB
Sec-XII FAQ.pdf
pdf • 0.37 MB
04_6_AM formats.pdf
pdf • 0.56 MB
~$ction-02.docx
docx • 0.00 MB
~$ction-03.docx
docx • 0.00 MB
~$pendix- B -Guidelines for Off Line installation.docx
docx • 0.00 MB
Appendix_D_1_ TYPE TEST OPTICAL FIBRE.pdf
pdf • 0.45 MB
Appendix_D_2_ Type Test OPGW Cable.pdf
pdf • 1.11 MB
Appendix_D_3_ TYPE TEST HARDWARE FITTINGS.pdf
pdf • 0.35 MB
Appendix_D_4 TYPE TEST VIBRATION DAMPER.pdf
pdf • 0.22 MB
Appendix_D_5 Type Test Joint Box.pdf
pdf • 0.25 MB
Appendix-E_1_ FAT OPGW.pdf
pdf • 0.52 MB
Appendix-E_2_ FAT Fitting, JB & FODP.pdf
pdf • 0.71 MB
Appendix-E_3 FAT Vibration Damper.pdf
pdf • 0.21 MB
Appendix-E_4_ FAT Approach Cable.pdf
pdf • 0.34 MB
Appendix_F_1 SAT Procedure.pdf
pdf • 1.71 MB
Section-01.pdf
pdf • 0.55 MB
Section-02.pdf
pdf • 0.70 MB
Section-03-Testing.pdf
pdf • 0.93 MB
Section-04.pdf
pdf • 0.27 MB
Thumbs_1.db
db • 0.22 MB
Standard MQP for Earthwire.pdf
pdf • 0.90 MB
06-TS(Vol-II),Sec-VI updated_Part 2 of 2.pdf
pdf • 9.11 MB
06-TS(Vol-II),Sec-VI updated_Part 1 of 2.pdf
pdf • 9.48 MB
04_1-Section 4-Rev-6 March-2018 with Mod Jan-21-updated.pdf
pdf • 0.83 MB
04_5_Annex-I_ SAT.pdf
pdf • 0.33 MB
04_7_APP-IV_List of T&P.pdf
pdf • 0.83 MB
05_Earthwire.pdf
pdf • 0.93 MB
07_Conductor.pdf
pdf • 1.16 MB
08_Insulator.pdf
pdf • 1.18 MB
Standard MQP Conductor.pdf
pdf • 4.76 MB
01-SECTION-1 revised-6 - March-2018 with Mod upto Jan-2021 (TW02).pdf
pdf • 1.82 MB
02-Section-II -Rev-6 March-2018 with Mod Aug-2020.pdf
pdf • 0.83 MB
03_1-SECTION - 3 - Rev-6 with Mod Jan-2021.pdf
pdf • 0.49 MB
03_2-Sec-III(2nd part Annex-A Format for site for Details .pdf
pdf • 1.70 MB
03_3_ TS_VOL-II_,Sec-III _2nd Part_ Annex B -C-D-E.pdf
pdf • 0.48 MB
04_2_APP-I_Precommissioning final.pdf
pdf • 1.25 MB
04_4_APP-III_SMQP Rev-5.pdf
pdf • 3.40 MB
00-Cover Page_Vol-I .doc
doc • 0.28 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
02_Section - II ITB SSTE S&I Rev 5-DCB-Mjn.pdf
pdf • 1.95 MB
03 Section - III BDS SSTE Vol-I.docx
docx • 0.07 MB
04-ANNEXURE-A (BDS).doc
doc • 0.07 MB
05_Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
06-Section - V SCC SSTE Vol-I.docx
docx • 0.05 MB
07 Annexure-I to SCC.pdf
pdf • 0.63 MB
08-Appendix-I to SCC.doc
doc • 0.24 MB
09-Section - VI Forms and Procedures Vol-I.doc
doc • 0.53 MB
4-Annexure-B to BDS.docx
docx • 0.02 MB
4-Annexure-C(BDS).docx
docx • 0.02 MB
4-Annexure-D to BDS.docx
docx • 0.03 MB
OBD_EXTN_LETTER1_.doc
doc • 0.63 MB
Vol-III_01st Envelope-Bid Form & Attachments_TW02_rev01.xls
xls • 2.42 MB
Letter to the bidders.doc
doc • 0.62 MB
01_Amendment No 1.DOC
doc • 0.05 MB
Link_for_Pre-Bid_meeting.docx
docx • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .