Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC | ₹15.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.0 L+₹83,279.40 (5.49%)Rejected-Finance SF NO 348 5 TIRUPUR TO UDUMALAI ROAD GUDIMANGALAM | ₹16.0 L+₹83,279.40 (5.49%) | L2 | Rejected-Finance L2 |
| 3 | L3₹19.5 L+₹4.3 L (28.4%)Rejected-Finance | ₹19.5 L+₹4.3 L (28.4%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-No Similar work Experience details not submitted. Not Satisfied the Pre-Qualification Conditions. Hence this bid is not eligible for price bid Opening. |
| Sl No | Description | Qty | Unit | SELVAKUMAR L2 | Karthikeyan Construction L3 | L.Arivazhagan L1 |
|---|---|---|---|---|---|---|
| 1.00Constrution of 30000 Ltr OHT at Anna nagar H/O Andihalli | ||||||
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
First depth of 2m
For foundation
For GL Brace | 46.24 | Cum | 246.52 ₹11,399.58 | 263 ₹12,161.65 | 190.53 ₹8,810.49 Lowest |
| 3.00 | Second depth of 1m
For foundation | 8.06 | Cum | 246.52 ₹1,987.94 | 263 ₹2,120.83 | 190.53 ₹1,536.43 Lowest |
| 4.00Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | ||||||
| 5.00 | For foundation | 2.3 | Cum | 1,987.23 ₹4,578.58 | 1,900 ₹4,377.6 | 1,538.93 ₹3,545.69 Lowest |
| 6.00 | For GL Landing Platform for ladder | 0.15 | Cum | 1,987.23 ₹298.08 | 1,900 ₹285 | 1,538.93 ₹230.84 Lowest |
| 7.00Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | ||||||
| 8.00 | For foundation | 3.46 | Cum | 5,543.52 ₹19,158.41 | 5,600 ₹19,353.6 | 4,293.05 ₹14,836.78 Lowest |
| 9.00 | For GL Brace | 0.18 | Cum | 5,543.52 ₹997.83 | 5,600 ₹1,008 | 4,293.05 ₹772.75 Lowest |
| 10.00Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | ||||||
Tender Value
₹19.7 L
EMD Value
₹20,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Block Development Officer(VP), Dharmapuri
Block Development Office, Dharmapuri
Constrution of 30000 Ltr OHT at Annanagar H/O Andihalli
2026_RDTN_657244_1
Roc.No. 4783/2025/E3 Dt.13.02.2026 Dharmapuri /MINES AND MINERALS FUND (2021-2022)
Open Tender
Civil Works
Item Rate
90 days
Block Development Office
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹20,000
Yes
7 Aug 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Constrution of 30000 Ltr OHT at Anna nagar H/O Andihalli | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
First depth of 2m
For foundation
For GL Brace | 1 | Cum | - | - |
| 3 | Second depth of 1m
For foundation | - | Cum | - | - |
| 4 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | - | - | - | - |
| 5 | For foundation | 1 | Cum | - | - |
| 6 | For GL Landing Platform for ladder | - | Cum | - | - |
| 7 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | - | - | - | - |
| 8 | For foundation | - | Cum | - | - |
| 9 | For GL Brace | 1 | Cum | - | - |
| 10 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Pricebid.pdf
Tender Documents • 0.32 MB
Technicalbid.pdf
Additional Documents • 0.72 MB
BOQ_788210.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .