Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC 102 114 MOHADDIPUR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹2.7 Cr | L1 | Accepted-AOC aoc |
| 2 | L2₹3.1 CrRejected-Finance | ₹3.1 Cr | L2 | Rejected-Finance R |
| 3 | L3₹3.2 CrRejected-Finance GONDA | UTTAR PRADESH | 271305 | ₹3.2 Cr | L3 | Rejected-Finance R |
| 4 | Rejected-Technical | - | - | Rejected-Technical R |
| 5 | Rejected-Technical | - | - | Rejected-Technical R |
Updated dates
Tender Value
₹3.3 Cr
EMD Value
₹18.3 L
Closing Date
19 Mar 2026, 12:00 pmClosed
BASTI CIRCLE
BASTI CIRCLE
JANPAD SIDDHARTHNAGAR ME BANSI NANDAUR KHALILABAD MARG ( RAJYA MARG SANKHYA-88) KE KM-14 PAR DALDALA NALE PAR 5 INTO 6 SPAN KI RCC BOX LAGHU SETU KA NIRMAN KARYA
2026_CEUBZ_1123519_1
1238/4E-NIVIDA-BASTI CIRCLE/25-26 DATED-26-02-2026
Open Tender
Civil Works
270 days
BASTI CIRCLE
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹18.3 L
Yes
BASTI CIRCLE
16 May 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
13 Mar 2026
Dismantling of brick work or stone work in lime or cement mortar and including stacking of materials as directed by engineer in charge with a distance of 60 meter as per SI no-692 (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Brick on edge pavement on road with bricks laid dry, joints filled with local sand including preparation of base to proper slope and its ramming spreading a layer of 1 cm (3/8") depth of local sand over the sub grade and including supply of all material labour and T & P etc. required for proper completion of the work. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
supply of hume pipe np3-900mm (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Laying of hume pipe np3-900mm (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
(M-15) concrete with 40mm gauge stone ballast cement sand and approved grit in foundation including supply of all material labour tools and plants etc requider for completetion of the work. with proper curing (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects.
M-25 Class R.C.C. work with cement approved course sand 2CM gauge approved stone abllast in lintals bed block and Deks slab & Approved slab including cost of suttering but excluding steel etc. complete with proper curing (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications with proper curing (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation/Sub structure/ Super structure complete as per drawing and technical specifications. (Rate are Excluding G.S.T. but including All Taxes Royality, Labour Cess, Material & T&P) with all aspects.
Providing weep holes in reinforceed concerete abutment. Wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structure slope of 1(V)20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 (including cost of materials) (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Proving of pumping set with insulation for dewatering of seapage in foundation with all materials labour tools and plants etc required for proper complete work. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC with 1% cement and 3.5% SS2 Emlusion. in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing and applying tack coat with Bitumen grade (VG-10) using bitumen pressure distributor at the rate of 2.50 kg per 10 sqm on the prepared granular surfaces treated with primer & Cleaned with Hydraulic broom as per Technical Specification Clause 503. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing and laying dense graded bituminous macadam with 50mm thickness 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing and laying bituminous concrete with 30mm thickness 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing and laying Back Filling behind abutment wing wall and behind retuirn wall using GSB as material complete as per drawing and technical specification. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Providing and laying boulders apron on river bed for protection against scour with stone boulder weighing not less than 40 kg eathc completes as per drawing and technical specification. (Rate are Excluding G.S.T. but including All Taxes Labour Cess, Material & T&P) with all aspects.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
T2.pdf
Additional Documents • 1.93 MB
BOQ_2093039.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid