| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.4 LAccepted-AOC AT KHAIRBANI PO KUMBHARMUNDHAKATA PS BANGIRIPOSI DIST MAYURBHANJ ODISHA 757081 | BANGIRIPOSI | MAYURBHANJ | ODISHA | 757081 | ₹42.4 L | L1 | Accepted-AOC Awarded through transparent lottery system |
| 2 | L1₹42.4 LRejected-AOC AT MADHUBAN W NO 07 BARIPADA DIST MAYURBHANJ PIN 757001 | BARIPADA | MAYURBHANJ | ODISHA | 757001 | ₹42.4 L | L1 | Rejected-AOC Not Qualified in transparent lottery system |
| 3 | L1₹42.4 LRejected-AOC | ₹42.4 L | L1 | Rejected-AOC Not Qualified in transparent lottery system |
| 4 | L1₹42.4 LRejected-AOC | ₹42.4 L | L1 | Rejected-AOC Not Qualified in transparent lottery system |
| 5 | L1₹42.4 LRejected-AOC AT CHHOTARAIPUR PO MUKTAPUR DIST MAYURBHANJ PIN 757100 | CHHOTARAIPUR | MAYURBHANJ | ODISHA | 757100 | ₹42.4 L | L1 | Rejected-AOC Not Qualified in transparent lottery system |
Tender Value
₹49.8 L
EMD Value
₹49,900
Closing Date
22 Oct 2025, 5:30 pmClosed
PA ITDA BARIPADA
MURGABAADI
Market Cultural Development Yard for Tribal (NH side) at Jharpokharia under Saraskana Block.
2025_STSCD_118691_23
ITDABPD-02/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
BARIPADA
B
2 documents required · 2 mandatory
₹6,000
₹49,900
Yes
21 Jan 2026
26 Sept 2025
23 Oct 2025
26 Sept 2025
22 Oct 2025
26 Sept 2025
Dismantling brick or stone masonary in lime or cement mortar under 3 mtr height including stacking the useful materials for reuse and removing the debris within 50m lead.
GROUND FLOOR
FIRST FLOOR
Removing old lime or cement plaster from walls including raking out joints 12mm deep and removing the debris within 50m lead
GROUND FLOOR
FIRST FLOOR
Dismantaling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead.
GROUND FLOOR
FIRST FLOOR
Earth work in excavation of foundation in hard soil within initial lead and lift
GROUND FLOOR
Sand filling in foundation and plinth with well waterd and rammed etc. complete. Saraskana Block..xlsx]BOQ 2'!$B$16
Ground Floor
Cement concrete in cm(1:3:6) using 4cm size H.G metel with all cost, conveyancy etc. complete.
GROUND FLOOR
Plain cement concrete (1:2:4) nominal mix as per Drawing and Technical
GROUND FLOOR
Fly Ash brick masonry in cm(1:6) for super structure in foundation and plinth with all cost, Carriage, Royality etc. complete.
GROUND FLOOR
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc. including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge
Column Base
Plinth Band
Column in Super Structure
GROUND FLOOR
FIRST FLOOR
All Kind of Beam
GROUND FLOOR
Lintel
GROUND FLOOR
Roof Slab
GROUND FLOOR
Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.
GROUND FLOOR
FIRST FLOOR
Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 Kg/cm2 to 149 kg/cm2 in cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
GROUND FLOOR
FIRST FLOOR
2.5cm thick A.S floring in cement concre in morter (1.2.4) using 12mm size h.g,c.b chips including punning with all cost, conveyance, Royality etc. complete.
GROUND FLOOR
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
GROUND FLOOR
FIRST FLOOR
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
GROUND FLOOR
FIRST FLOOR
12mm thick Cement Plaster (1:4) over Brick Masonry finished with cement punning for skirting.
GROUND FLOOR
6mm thick C.P in cm (1:4) over Concrete work with all cost, carriage,Royality etc. complete.
GROUND FLOOR
Factory made 30mm/32mm flush door shutter (nonsal hard wood framefixed with 4mm BWR ply on both side of frame) with all labour, iron fittings, and wooden hinged cleats etc fitted and fixed complete in all respect
GROUND FLOOR
Providing Aluminium composite pannel made out of Aluminium section No.B9835 as horizontal and vertical member placed spacing 2'-0'' c/c and 3mm thic ACP including cost of all materials labour T&P etc. complete.
GROUND FLOOR
Supplying of MS Door, windows with Grills, Grills, Collapsible gates made out of M.S Angle frame, M.S Flat Sheet etc. of approved section and design, Electrically Welding Properly with all necessary locking arrangement and one coat redoxide Primer including cost of all materials, labour, T&P, carraiga of Materials to site etc. complete as per the direction of the Engineer-in-charge.
GROUND FLOOR
Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90 mtrs C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc with coist, conveyance, taxes of all materials, labour and T&P required for the work all complete in all respect
GROUND FLOOR
Supplying, fitting & fixing of 10 mm thick & size of 600x600 mm Vitrified floor tiles with water absorption limit between 0.08% to 3% and conforming to IS : 15622:2006 (Group B Ib). laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge (for New Work only )
GROUND FLOOR
FIRST FLOOR
Supplying, fitting & fixing of 10 mm thick & size of 600x600 mm Vitrified Dado
GROUND FLOOR
FIRST FLOOR
Supplying, fitting & fixing of Ceramic Floor tiles (30x30,40x40) with water absorption limit between 0.08% to 3% and conforming to IS : 15622:2006 (Group B Ib). laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge (for New Work only )
GROUND FLOOR
Supplying, fitting & fixing of Ceramic wall tiles of having thickness 6.5mm to 6.7mm confirming to IS 13753 in dadoes, skirting and risers of steps laid on 12 mm thick cement mortar (1:3) (1 cement : 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge
GROUND FLOOR
FIRST FLOOR
Supplying, fitting and fixing of Truss etc. complete.
FIRST FLOOR
Hoisting joists and trusses and placing in position
FIRST FLOOR
Providing and fixing of G.C.I sheet on roof drilling holes fixing wind ties including fixing of Ridges, with cost of all labour ,all materials etc. complete.
FIRST FLOOR
Providing fitting fixing of false ceiling with Aluminium anodised T section No.3215 with 2'0" center to center, L section No.1705 on 4 walls to be fixed by means of steel screw and P.V.C. plug and the Aluminium grid 2'0"x2'0" with 9 mm thick Prelaminated particle board (Novapan standard type) (I.S.I.) suspended from ceiling including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-charge
FIRST FLOOR
Finishing surface of walls with cement based wall putty (water based) of approved
GROUND FLOOR
Painting 2 coats with synthetic enamal paint on new wood work or steel work.
GROUND FLOOR
Wall Painting two coats with approved Plastic Emulsion Paint over a coat of Water Bound Wall cement Primer on Plastered Surface or as per direction of the Engineer-in-charge.
GROUND FLOOR
FIRST FLOOR
Distempering 2 coats with distemper with approved shade including cost of
GROUND FLOOR
Providing weather coat ( two coats ) to puter surface of the structure or as per direction of the Engineer-in-charge.
GROUND FLOOR
FIRST FLOOR
Providing ACP wall panneling to the out side of the structure as per direction of the Engineer-in-charge.
GROUND FLOOR
FIRST FLOOR
stage.html
html • 0.15 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.72 MB
23_DTCN.pdf
Tender Documents • 2.79 MB
BOQ_554292.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .