Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,914
Closing Date
29 Aug 2026, 12:00 pmDue tomorrow
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
FENCING WITH 2NO GATES FOR GRAVEYARD BEIGH PORA GANASTAN-B
2026_RDPR_321757_7
NIT72
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹2,914
22 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator) in trenches for foundations/drains (≤1.5 m width, ≤10 sqm plan), dressing of sides, ramming bottoms, lift up to 1.5 m, disposal within 50 m; all kinds of soil. | 1.47 | cum | 252.2 | ₹370.73 |
| - | Supply & spreading of stone soling, hand packed complete, with 10 km lead. | 1.24 | cum | 1,200 | ₹1,488 |
| - | Cement concrete 1:3:6 (20 mm aggregate), curing included, excluding centering/shuttering. | 3.29 | cum | 5,733.6 | ₹18,863.54 |
| - | RCC 1:2:4 (20 mm aggregate) for pillars, curing included, excluding centering/shuttering. | 0.62 | cum | 7,840.75 | ₹4,861.27 |
| - | Steel reinforcement for RCC work, Fe-500D grade bars, straightening, cutting, bending, placing, binding. | 100 | kg | 123.2 | ₹12,320 |
| - | Structural steel work in single section, fixed with/without connecting plate, cutting, hoisting, fixing in position, applying primer coat. | 629.03 | kg | 116.3 | ₹73,156.19 |
| - | Providing & fixing G.I. chain link fencing, mesh size 50×50 mm, made of G.I. wire dia 4 mm. | 3.4 | sqm | 809.9 | ₹2,753.66 |
| - | Centering & shuttering for columns, pillars, piers, abutments, posts, struts. | 5.71 | sqm | 724.1 | ₹4,134.61 |
| - | Centering & shuttering for retaining walls, return walls, walls (any thickness) incl. pilasters, buttresses, plinth, string course fillets, kerbs, steps. | 19.71 | sqm | 628.95 | ₹12,396.6 |
| - | 12 mm thick cement plaster (1:4 mix). | 24.04 | sqm | 266 | ₹6,394.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1075863.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].