| # | Company | Status |
|---|---|---|
| 1 | Sree Renuka and Co Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
19 Feb 2021, 3:00 pmClosed
Project Director
DRDA, VPM
Strengthening of 1 Roads in Thiruvennainallur Panchayat Union in Viluppuram District under SCPAR Roads 2020-21 Package TNVPM/SCPAR20-21/047
2021_RDTN_193078_1
TNVPM/SCPAR/2021-047
Open Tender
Civil Works
Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
Yes
26 Feb 2021
31 Jan 2021
19 Feb 2021
31 Jan 2021
19 Feb 2021
4 Feb 2021
Amount
Strengthening of the road from Keerimedu to Arumpattu road Km 0/0-1/740
Clearing the scrub jungles including all labour charges for all labour charges etc complete. Km 0/0-1/740
Earthwork excavation in all classes of soils except hard rock rerqurining blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidentail charges and sheeting, shoring Km 0/0-1/740
Picking the existing BT surface upto5cmto 10cm thickness and sectioningthe road
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. For sub base
Providing and laying 75mm compacted thick WBM Gr.IIusing 1 cum of 75mm to 22.40 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
Applying prime coat over WBM/WMM surface using 7 kg of RS-1 bituminous emulsion per 10 sqm including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc, complete as per clause 503 of MOST specification.
Providing and laying Premix carpet with seal coat type 'A' for 20 mm consolidated thickness 0.18cum of 13.20 mm and 0.09 cum of 11.20 mm with 14.60 kg of 60/70 grade bitumen for pre mixing for 10 sqm for premix carpet and 0.09 cum of 6.70 mm IRC size HBG metal
Hard Bed
Earthwork excavation and deposting on bank eith an intial lead and lift in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 using 40mm ISS HBG metal including all labour charges for mixing concrete watering and laying the concrete in layers not more than 15cm thick compacting etc complete complying with standard specificiation
Cost and supply and errecting centering including conveyance and all labour charges complete complying with standard specification
Cement concrete 1:3:6 using 40mm ISS HBG metal including all labour charges for mixing concrete watering and laying the concrete in layers not more than 15cm thick compacting etc complete complying with standard specificiation
Cement concrete 1:2:4 using 40mm ISS HBG metal including all labour charges for mixing concrete watering and laying the concrete in layers not more than 15cm thick compacting etc complete complying with standard specificiation for bed block
Provision for kM Stones
Provision for HM Stones
Fixing of Name Board including cost, painting, Lettering, installation etc.
Photographic charges for taking photos in various stages before execution, during execution and after execution
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VENU SEETHARAMAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .