Tender Value
Refer Docs
EMD Value
₹2.1 Cr
Closing Date
12 Aug 2026, 2:00 pm
Sandip Sundar Sahoo, Manager (CnP Projects)
Sector-1, Noida- 201301, Dist. Gautam Budh Nagar,
LAYING AND ASSOCIATED WORKS FOR CAPACITY AUGMENTATION OF DAHEJ-URAN-DABHOL-PANVEL PIPELINE (DUPL-DPPL) PROJECT
2026_GAIL_284722_1
GAIL/NOIDA/CnP/PROJ/26-28
Open Tender
Oil/Gas
Item Rate
450 days
Sector-1, Noida- 201301, Dist. Gautam Budh Nagar
Please refer Tender documents
12 documents required · 12 mandatory
₹0
₹2.1 Cr
Yes
ONLINE THROUGH VC (LINK PROVIDED IN TENDER)
22 Jul 2026
22 Jul 2026
13 Aug 2026
22 Jul 2026
12 Aug 2026
29 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION-A (MAIN LINE WORKS) | - | - | - | - |
| 2 | PIPELINE LAYING / INSTALLATION | - | - | - | - |
| 3 | Laying/ installation of coated line pipe, associated fittings and accessories, etc. as per specifications, drawings, other provisions of Contract and instructions of Engineer-in-Charge of the sizes mentioned herein, including but not limited to carrying out the following : | - | - | - | - |
| 4 | "Receiving and taking-over", handling, loading (except for cases, where loading of bare/coated line pipe is arranged by owner), transportation and unloading of Owner supplied externally corrosion coated and bare line pipes and other Owner supplied materials from Owner designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ workshop(s)/ work-site(s) including stringing on the pipeline Right-of-Use (ROU)/ Right of way (ROW); Arrangement of all additional land required for Contractor's storage, fabrication, access for construction (other than Owner provided ROU/ROW); supply of materials (except Owner supplied materials), consumables, equipment, labour, etc. and other incidental works;carrying out all temporary, ancillary, auxiliary works required to make the pipeline ready for pre-commissioning as per drawings, specifications, scope of work indicated, SCC and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works : | - | - | - | - |
| 5 | Staking and installation of temporary construction markers, clearing, grubbing & grading of Right of Use/ Right of Way; | - | - | - | - |
| 6 | Counting the number and type of trees cut in presence of DFO/concerned authorities and keeping record thereof; shifting of all obstruction within the ROU / pipeline route alignment viz. electrical line / pole, telephone line (poles), foreign pipeline; coordination with concerned authorities and obtaining work permits/ NOC from these authorities. | - | - | - | - |
| 7 | Trenching to all depths and to a width to accommodate the pipeline and 2 (two) no./ runs of optical fiber cables/cable ducts/ conduits during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc. by excavation in all types of soils (including soft/hard rock), including chiseling or otherwise cutting etc.; providing depth of padding in trench bed & above and around the pipeline, HDPE ducts and OFC as required with sand / graded earth approved by Engineer-in Charge.
Note: Two HDPE ducts shall be laid for two runs of OFC, one on each side of main pipeline. | - | - | - | - |
| 8 | Trenching in rocky terrain by use of rock hammer/ Rock breaking tool or any other suitable and approved method, including chemical cracking and controlled blasting (if required) with due approval of EIC. | - | - | - | - |
| 9 | Survey of the detours, if required at the time of construction including marking the same in topographical sheet, preparation of AFC drawings showing survey detail and submitting same to Owner/ PMC to review. | - | - | - | - |
| 10 | Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site, if required. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 1.67 MB
VOLIV_Part8.pdf
Tender Documents • 15.69 MB
VOLIV_Part12.pdf
Tender Documents • 20.00 MB
VOLIII_Part2.pdf
Tender Documents • 8.00 MB
VOLIII_Part1.pdf
Tender Documents • 19.86 MB
VOLIV_Part11.pdf
Tender Documents • 19.98 MB
VOLIV_Part7.pdf
Tender Documents • 13.08 MB
VOLIV_Part2.pdf
Tender Documents • 19.48 MB
VOLIV_Part6.pdf
Tender Documents • 18.70 MB
VOLIV_Part1.pdf
Tender Documents • 19.93 MB
VOLIV_Part16.pdf
Tender Documents • 9.53 MB
COMMCOMP.pdf
Tender Documents • 17.11 MB
VOLIV_Part15.pdf
Tender Documents • 19.97 MB
VOLIV_Part14.pdf
Tender Documents • 19.84 MB
VOLIV_Part13.pdf
Tender Documents • 19.97 MB
VOLIV_Part9.pdf
Tender Documents • 19.93 MB
VOLIV_Part10.pdf
Tender Documents • 19.99 MB
VOLIV_Part5.pdf
Tender Documents • 19.74 MB
VOLIV_Part4.pdf
Tender Documents • 19.82 MB
VOLII_Part2.pdf
Tender Documents • 13.71 MB
VOLII_Part1.pdf
Tender Documents • 15.98 MB
VOLIV_Part3.pdf
Tender Documents • 19.87 MB
DUPL_PDI.kmz
Other Document • 0.14 MB
DUPL-DPPL-PROJECT.kmz
Other Document • 0.34 MB
BOQ_332455.xls
BOQ • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].