Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.3 LAccepted-AOC R O VILL CHEOG TEH THEOG DISTT SHIMLA | ₹2.3 L | L-1 | Accepted-AOC L1 |
| 2 | L-2₹2.3 L+₹6,498 (2.87%)Rejected-Finance UPPER KANGNA DHAR VERMA COTTAGE BELOW BCS SHIMLA 9 | ₹2.3 L+₹6,498 (2.87%) | L-2 | Rejected-Finance L2 |
| 3 | L-3₹2.5 L+₹22,353 (9.86%)Rejected-Finance PURAN CHAND BUILDING NEW TOTU SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹2.5 L+₹22,353 (9.86%) | L-3 | Rejected-Finance L3 |
| 4 | L-4₹2.5 L+₹27,797 (12.3%)Rejected-Finance | ₹2.5 L+₹27,797 (12.3%) | L-4 | Rejected-Finance L4 |
| 5 | L-5₹3.1 L+₹84,163 (37.1%)Rejected-Finance | ₹3.1 L+₹84,163 (37.1%) | L-5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Lalit Thakur L4 | ashok kumar verma L2 | Sunder Singh Sharma L6 | SUNEEL CHAUHAN L1 | Mudasir Ahmad Bhat L3 | kirpa ram L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc., in earth work in all type of soil such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock etc., up to all heights stacking the excavated earth not more 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to including all leads and lifts complete in all respect and as per the direction of Engineer-in-charge. | 24.48 | cum | 120 ₹2,937.6 | 10 ₹244.8 Lowest | 400 ₹9,792 | 10 ₹244.8 Lowest | 180 ₹4,406.4 | 350 ₹8,568 |
| 2.00 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give finish including centering, shuttering, strutting and propping etc., with wooden ballies and battens height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete and plain concrete work in: - Foundation, footing, basis of columns etc. and mass concrete. Including all leads and lifts complete in all respects and as per direction of Engineer-in-Charge. | 43.2 | sqm | 120 ₹5,184 | 10 ₹432 Lowest | 500 ₹21,600 | 10 ₹432 Lowest | 150 ₹6,480 | 150 ₹6,480 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | 42.96 | cum | 5,500 ₹2,36,280 | 5,325 ₹2,28,762 | 7,500 ₹3,22,200 | 4,800 ₹2,06,208 Lowest | 5,200 ₹2,23,392 | 6,500 ₹2,79,240 |
| 4.00 | Stone filling behind R/Wall/B/Wall | 10.8 | cum | 600 ₹6,480 | 80 ₹864 Lowest | 300 ₹3,240 | 1,800 ₹19,440 | 1,200 ₹12,960 | 1,500 ₹16,200 |
| 5.00 | Providing weep hole of 100 mm dia @1 Sqm Each complete as direction of Er.-in-charge | 36 | meter | 100 ₹3,600 | 80 ₹2,880 | 500 ₹18,000 | 10 ₹360 Lowest | 50 ₹1,800 | 10 ₹360 Lowest |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
23 Sept 2025, 3:00 pmClosed
AGM Sewerage Division
AGM Office Sewerage Division US Club Shimla
Restoration of rain damages Construction of retaining wall for protection of road and fencing at STP Summerhill STP ND Network.
2025_SJPNL_114893_1
SJPNL/Sewerage/NIT/1805-09dt. 16.09.2025
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹10,000
15 Oct 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
16 Sept 2025 - 23 Sept 2025
Amount
Excavation in foundation, trenches etc., in earth work in all type of soil such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock etc., up to all heights stacking the excavated earth not more 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to including all leads and lifts complete in all respect and as per the direction of Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give finish including centering, shuttering, strutting and propping etc., with wooden ballies and battens height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete and plain concrete work in: - Foundation, footing, basis of columns etc. and mass concrete. Including all leads and lifts complete in all respects and as per direction of Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Stone filling behind R/Wall/B/Wall
Providing weep hole of 100 mm dia @1 Sqm Each complete as direction of Er.-in-charge
ashok kumar verma (BID ID -559841)
Mudasir Ahmad Bhat (BID ID -559141)
Lalit Thakur (BID ID -559541)
kirpa ram (BID ID -558310)
Sunder Singh Sharma (BID ID -559963)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .