Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94,965.94Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹98,622.63+₹3,656.69 (3.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.1 L+₹11,891.58 (12.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
10 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Crate Work sliding area in the mohalla of Mohd Usman Chundar Mohalla w.no 4 PytThuroo A 2 Block Thuroo Distt Reasi under Capex Budget DDC for the year 2026-27.
2026_RDPR_318990_10
e-NIT No. 79 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
EXECUTIVE ENGINEER REW DIVISION REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹1,960
16 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil | 18.69 | cum | 592.9 | ₹11,081.3 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge All kinds of soil | 8.5 | cum | 479.3 | ₹4,074.05 |
| 3 | Hand-packing stones in wire-crates; including cost of crates and stones including all leads, lift and carriage complete | 22.64 | Cum | 1,309 | ₹29,635.76 |
| 4 | Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials | 89.22 | cum | 92.9 | ₹8,288.54 |
| 5 | Galavanised wire mesh of average width of aperture 1.4 mm and nominal dia. of wire 0.63 mm | 85.22 | sqm | 325 | ₹27,696.5 |
| 6 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge lumsump rate Rs 3000 | 1 | No. | 3,000 | ₹3,000 |
| 7 | Carriage of stone from an avg. distance of 0 K.M by MT & 600 by AT | 19.1 | cum | 801.48 | ₹15,308.27 |
stage.html
html • 0.02 MB
finance_1054432.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_1054432.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .