| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹63.8 LAccepted-AOC | ₹63.8 L Quoted ₹46.6 L | 2 | Accepted-AOC ok |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-ok |
| 3 | Not Admitted-Fee/PreQual/Technical CHENNAI | CHENNAI | TAMIL NADU | 600001 | - | - | Not Admitted-Fee/PreQual/Technical Others-ok |
| 4 | Not Admitted-Fee/PreQual/Technical RAMASAMUDRAM VILLAGE AND POST PALLIPATTU TALUK TIRUVALLUR DISTRICT 631206 | PALLIPATTU | TIRUVALLUR | TAMIL NADU | 631206 | - | - | Not Admitted-Fee/PreQual/Technical Others-ok |
| Sl No | Description | Qty | Unit | M/S. Sri Masilamani Constructions L1 |
|---|---|---|---|---|
| 1.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 248 | m3 | 1,761.3 ₹4,36,802.4 Lowest |
| 2.00 | Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (CSS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 1,650 | m2 | 64.5 ₹1,06,425 Lowest |
| 3.00 | Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 1,650 | m2 | 14.3 ₹23,595 Lowest |
| 4.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kgs of Emulsion Bitumen [RS-1 (IS 8887:2004)] for 10 sqm area including cost of Emulsion Bitumen, labour charges for preparing the surface for laying the Tack coat and applying the required quantity of Emulsion Bitumen as Tack coat including hire charges and fuel charges for Mechanical Sprayer and all other tools & plants employed for the work etc., complete as per Clause 111, 112, 501, 503 of MORTH Specifications. | 5,160 | m2 | 20.9 ₹1,07,844 Lowest |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 505, 900 of MORTH Specification Rev-5. | 300 | m3 | 8,115.6 ₹24,34,680 Lowest |
| 6.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27 kgs of VG30 / VG40 bitumen and 5.03kgs of Shredded Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507, 900 of MORTH Specification Rev-5. | 180 | m3 | 8,600.3 ₹15,48,054 Lowest |
Tender Value
Refer Docs
EMD Value
₹63,800
Closing Date
26 Jul 2023, 3:00 pmClosed
EXECUTIVE OFFICER
Executive officer podhaturpet Town Panchayat
Restoration of BTRoad at Vanivilasapuram GroupHouse 2nd Street 3rd Street 4th StreetCrossStreet1st Street East 2nd Street East 3rd Street East 4th Street East and Kudiyanavar Street from Bajanai Koil toThiruthani Road i Podhaturpet TownPanchayat
2023_DTP_345369_1
288/2023 a1
Open Tender
Civil Works - Roads
Works
180 days
Podhaturpet Town Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹63,800
Yes
Podhaturpet Town Panchayat
2 Sept 2025
17 Jul 2023
26 Jul 2023
17 Jul 2023
26 Jul 2023
17 Jul 2023
18 Jul 2023
Amount
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (CSS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kgs of Emulsion Bitumen [RS-1 (IS 8887:2004)] for 10 sqm area including cost of Emulsion Bitumen, labour charges for preparing the surface for laying the Tack coat and applying the required quantity of Emulsion Bitumen as Tack coat including hire charges and fuel charges for Mechanical Sprayer and all other tools & plants employed for the work etc., complete as per Clause 111, 112, 501, 503 of MORTH Specifications.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 505, 900 of MORTH Specification Rev-5.
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27 kgs of VG30 / VG40 bitumen and 5.03kgs of Shredded Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507, 900 of MORTH Specification Rev-5.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .