| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹7.2 L (2.47%)Admitted-Finance | ₹3.0 Cr+₹7.2 L (2.47%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹10.1 L (3.47%)Admitted-Finance | ₹3.0 Cr+₹10.1 L (3.47%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical Bid mismatch |
| Sl No | Description | Qty | Unit | M/s Anil kumar singh L1 | ARK ENGINEERING L2 | M/S SHUKLA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Following materials will be provided by contractor directly at work site. | ||||||
| 1.01 | ST POLE 11 Mtr. Long | 43 | No. | 19,300 ₹8,29,900 Lowest | 19,600 ₹8,42,800 | 19,650 ₹8,44,950 |
| 1.02 | 11 KV "V" Type Crass Arm | 2 | No. | 1,150 ₹2,300 Lowest | 1,260 ₹2,520 | 1,270 ₹2,540 |
| 1.03 | Pin Insulator with pin | 54 | No. | 350 ₹18,900 Lowest | 360 ₹19,440 | 370 ₹19,980 |
| 1.04 | Disc Insulator with fitting | 54 | No. | 650 ₹35,100 Lowest | 670 ₹36,180 | 680 ₹36,720 |
| 1.05 | ACSR Weasel Conductor | 5.24 | KM | 35,500 ₹1,86,162 Lowest | 35,600 ₹1,86,686.4 | 35,650 ₹1,86,948.6 |
| 1.06 | Stay Compleet | 62 | No. | 2,300 ₹1,42,600 Lowest | 2,320 ₹1,43,840 | 2,350 ₹1,45,700 |
| 1.07 | Earthing Compleet | 39 | No. | 1,050 ₹40,950 Lowest | 1,060 ₹41,340 | 1,100 ₹42,900 |
| 1.08 | 6" dia. G.I. Pipe | 154 | Mtr. | 1,450 ₹2,23,300 Lowest | 1,460 ₹2,24,840 | 1,500 ₹2,31,000 |
| 1.09 | Scoket for 6" G.I. Pipe | 26 | No. | 500 ₹13,000 Lowest | 520 ₹13,520 | 550 ₹14,300 |
Tender Value
₹2.0 Cr
EMD Value
₹2 L
Closing Date
29 Mar 2023, 2:00 pmClosed
SE EDC-I Gorakhpur
Mohaddipur Gorakhpur
Increasing of Power T/f at Khorabar S/s and construction of Line in extended Urban area under EDD Chaurichaura
2023_PVVNV_788592_1
23/EDC-I(G)/2022-23
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE EDC Gorakhpur
₹2 L
1 Apr 2023
22 Mar 2023
29 Mar 2023
22 Mar 2023
29 Mar 2023
22 Mar 2023
Amount
Following materials will be provided by contractor directly at work site.
ST POLE 11 Mtr. Long
11 KV "V" Type Crass Arm
Pin Insulator with pin
Disc Insulator with fitting
ACSR Weasel Conductor
Stay Compleet
Earthing Compleet
6" dia. G.I. Pipe
Scoket for 6" G.I. Pipe
100 KVA T/F
L.T. PVC Cable 3.5X150 SQ. MM.
S/S Base
X-Bracing M.S. Angle.
Guarding X Arm( MS Angle)
G.I.Wire 6 SWG & 10 SWG
3X185 Sq. mm. XLPE Cable.
3X300 Sq. mm. XLPE Cable.
Cable Jointing Kit of 3x185 sq. mm.
33 KV Ligtening Arrestor
33 KV Ligtening Arrestor Structure
33/11 KV 10 MVA T/F
11 KV VCB outgoing
11 KV 3x300 mm² XLPE Cable for both TF
11 KV 3x185 mm² XLPE Cable (DC)
Control Cable size 4x2.5 mm²
Control Cable 2x2.5 mm²
11 KV C/J Kit(3x300 mmsq) ID
11 KV C/J Kit(3x300 mmsq) OD
11 KV C/J Kit(3x185 mmsq) ID
11 KV C/J Kit(3x185 mmsq) OD
24 Volt Battery with inverter set with 5 year's waranty.
Ruber Mat
Camical Earthing
L.T. Clamp
L.T. Shakle insulator.
T-off Channel Clamp
Top Channel
Dropper Angle
Top & Dropper Channel Clamp
Nuts&Bolts
Stone Pad
Cable Marker
Danger Board.
Erection of line material/ T/F/Panel/VCB
Erection of single support ST Pole 11 Mtr. Long in proper alignment with cost of clamps, fitting of all accessories including digging of pits filling of earth ramming and dressing and earthing of pole as per RESSPO norms.
Erection of double ST Pole 11 Mtr. Long structure in proper alignment with fitting of all accessories with cost of clamps including digging of pits filling of earth ramming and dressing and earthing of pole as per RESSPO norms.
Fixing of Stay sets including digging of pits and grouting with sand bricks ballast and cement nuzzling of Stay wire as per RESSPO norms. (Sand bricks ballast and cement will be provided by contractors).
Grouting of pole with sand bricks ballast and cement nuzzling of Stay wire as per RESSPO norms. (Sand bricks ballast and cement will be provided by contractors).
Plinth of ST pole
Painting of ST Pole
Guarding of line.
Instalation of 100 KVA T/F on double pole with all connections with body and neutral earthing.
Laying of 11 KV 3x185 sq. mm. XLPE Cable including digging of pits of covering of cable with sand & brick around and Top with Provision of ring at both ends of cable.
Laying of 11 KV 3x300 sq. mm. XLPE Cable including digging of pits of covering of cable with sand & brick around and Top with Provision of ring at both ends of cable.
Outdoor Cable box Jointing of 3x185 sq. mm. XPLE
Indoor Cable box Jointing of 3x185 sq. mm. XPLE
Outdoor Cable box Jointing of 3x300 sq. mm. XPLE
Indoor Cable box Jointing of 3x300 sq. mm. XPLE
Straight Through Jointing work for 3x185 sq. mm. XPLE
11 KV VCB outgoing with wiring
33 KV VCB 1250 Amp. (339362) Instalation with Structure with wiring.
Control Pannel for 33 KV double T/F with wiring.
33 KV linghting Arrestor instalation with structure and wiring.
33KV C.T. 400/200/1-A(24445) instalation with wiring.
Dismantling of 5 MVA Power Transformer after removing T/F oil and keeping safe in drum and removing from Plinth.
Instalation of 10 MVA Power Transformer at plinth with oil filling and all 33/11 KV connections, earthing and from 11 kv incomming VCB.
ARK ENGINEERING
M/S SHUKLA ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .