| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.9 Cr+₹2.4 L (1.24%)Rejected-Finance | ₹1.9 Cr+₹2.4 L (1.24%) | L2 | Rejected-Finance Highest rate |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
8 May 2023, 11:00 amClosed
Project Director,DRDA, Virudhunagar
DRDA, Collectorate, Virudhunagar
Upgradation-Strengthening and 5 Years Routine Maintenance of Roads- 3 nos.in Package no. MGSMT-27-2022-23 at Sivakasi Block of Virudhunagar District under MGSMT-2022-23.
2023_RDTN_300713_34
DIPR/2018/Tender/2023
Open Tender
Civil Works - Roads
Works
180 days
Sivakasi Block
Two Cover System. Refer tender document
5 documents required · 5 mandatory
₹0
₹1.9 L
DRDA, Collectorate, Virudhunagar
1 Jun 2023
22 Apr 2023
8 May 2023
22 Apr 2023
8 May 2023
30 Apr 2023
30 Apr 2023
Amount
Part-1:- Sanarpatti to Jeevajothai fire works road km 0/0 - 1/0
Part-A:- Upgradation work
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
Applying Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying Tack coat over primed surface @ 2.50Kg RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing KM Stone etc. complete
Providing Hectametre stone of size
Providing sign board
Providing Maintenance and Name board
Providing and fixing reflective road studs of "category B" raised pavement markers made out of poly carbonae/ABS moulded body and reflective panels(bi-covex reflectors)with micro prismatic lens capable of providing total internal reflection of the lifht entering the lens face with retro - reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also fonfirm to the MORTH circular NI. RW/NH. 33023/10/97-DO.III dt 11.06.97 and the length, height and width of the body shall not be less than 100 mm, 15 mm and 90mm and base of markder shall be flat within 1.3 mm. The marker shall support a load of 13635 Kg tested in accordance with ASTM D 4280. Lenses shall be moulded of Poly carbonate or methyl methecrylate fonforming to ASTM D788. The area of each retro - refloctory surface shall not be less than 13.0 sq. cm.. The slope or retro - refloctory surface shall be 35 + 5 degree to base. Each 4reflector shall have a CIL not less than values specified in table 2 of said MORTH & H circular and two cylindrical polymer shanks of not less than 20 mm diameter and not less than 30 mm length shall be provided for better anchorage.
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectoising glass beads @ 250 gms per Sqm area , Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC :35 . The finished surface to be level , uniform and free streaks and holes etc complete as per MORT & H specification No.803 - Road Marking - Edge line
CD Works-1:- Construction of 1.50 m Span RCC Culvert
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works
CC 1:2:4 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
RCC 1:1 1/2 :3 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part-2:- Niraimathi- Gangathevanpatti road Km0/0-2/200
Part-A:- Strengthening work
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 0/0- 1/0
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 1/0- 2/0
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 2/0- 2/2
Applying Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying Tack coat over primed surface @ 2.50Kg RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing Hectametre stone of size
Providing Kilometer stone of size 0.90mx0.15mx0.15m
Providing sign board
Providing Maintenance and Name board
Providing and fixing reflective road studs of "category B" raised pavement markers made out of poly carbonae/ABS moulded body and reflective panels(bi-covex reflectors)with micro prismatic lens capable of providing total internal reflection of the lifht entering the lens face with retro - reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also fonfirm to the MORTH circular NI. RW/NH. 33023/10/97-DO.III dt 11.06.97 and the length, height and width of the body shall not be less than 100 mm, 15 mm and 90mm and base of markder shall be flat within 1.3 mm. The marker shall support a load of 13635 Kg tested in accordance with ASTM D 4280. Lenses shall be moulded of Poly carbonate or methyl methecrylate fonforming to ASTM D788. The area of each retro - refloctory surface shall not be less than 13.0 sq. cm.. The slope or retro - refloctory surface shall be 35 + 5 degree to base. Each 4reflector shall have a CIL not less than values specified in table 2 of said MORTH & H circular and two cylindrical polymer shanks of not less than 20 mm diameter and not less than 30 mm length shall be provided for better anchorage.
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectoising glass beads @ 250 gms per Sqm area , Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC :35 . The finished surface to be level , uniform and free streaks and holes etc complete as per MORT & H specification No.803 - Road Marking - Edge line
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part-3:- Naduvapatti to Alagapuri road Km 0/0 - 2/2
Part-A:- Strengthening work
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 0/0- 1/0
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 1/0- 2/0
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 2/0- 2/2
Applying Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying Tack coat over primed surface @ 2.50Kg RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing Hectametre stone of size
Providing Maintenance and Name board
Providing Kilometer stone of size 0.90mx0.15mx0.15m
Providing sign board
Providing and fixing reflective road studs of "category B" raised pavement markers made out of poly carbonae/ABS moulded body and reflective panels(bi-covex reflectors)with micro prismatic lens capable of providing total internal reflection of the lifht entering the lens face with retro - reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also fonfirm to the MORTH circular NI. RW/NH. 33023/10/97-DO.III dt 11.06.97 and the length, height and width of the body shall not be less than 100 mm, 15 mm and 90mm and base of markder shall be flat within 1.3 mm. The marker shall support a load of 13635 Kg tested in accordance with ASTM D 4280. Lenses shall be moulded of Poly carbonate or methyl methecrylate fonforming to ASTM D788. The area of each retro - refloctory surface shall not be less than 13.0 sq. cm.. The slope or retro - refloctory surface shall be 35 + 5 degree to base. Each 4reflector shall have a CIL not less than values specified in table 2 of said MORTH & H circular and two cylindrical polymer shanks of not less than 20 mm diameter and not less than 30 mm length shall be provided for better anchorage.
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectoising glass beads @ 250 gms per Sqm area , Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC :35 . The finished surface to be level , uniform and free streaks and holes etc complete as per MORT & H specification No.803 - Road Marking - Edge line
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G.A. MUTHULAKSHMI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .